Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on September 23, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DESIGN/BUILD ADMINISTRATION FACILITY RENOVATION

Awarded
HSFLGL-10-R-00010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia, with potential associated upgrades to Buildings 261 and 263. The scope of work includes comprehensive interior finishes such as replacing corridor and classroom flooring with LVP and carpet tiles, repainting walls to a level 4 finish, and updating signage. Technical upgrades involve renovating restrooms with new vanities and lavatories, installing raised flooring with integrated electrical distribution in classrooms, and replacing variable air volume systems and lighting controls. The project is a Firm Fixed Price contract with a performance period of 425 calendar days, scheduled from January 11, 2027, to March 11, 2028. Award will be determined using a best suited then negotiate methodology, evaluating past performance from the last five years, corporate relevant experience, and price fairness. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the facility's nature, personnel must undergo background checks, including FBI fingerprinting and DHS non-disclosure agreements, and comply with strict security and safety protocols. Proposals must be submitted by November 18, 2026, and include a detailed cost breakdown via Exhibit A, signed Standard Form 1442, and required past performance questionnaires.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new modified bitumen roofing, and interior reconfiguration. Key technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price. Depending on the proposal value, bonding requirements may include bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Contractor deliverables include a comprehensive Quality Control Plan, operation and maintenance manuals, and a 20-year no dollar limit warranty on specific roofing labor and materials.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under the Recharge Master Plan Update. The solicitation is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The response deadline for this opportunity is November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to comprehensive Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical mandates include providing proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day prior to the bid opening. Additionally, bidders must submit evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA) within their bid package. While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, all other GFE certifications must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Bidding is open to various small business designations and covers a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive bid documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, following a fire sprinkler discharge. The project requires the full restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring and rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory pre-bid site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with the latest Wage Rate decisions. Administrative requirements include Net 30 payment terms and a one-year guarantee of workmanship upon substantial completion. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting, along with the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Financial requirements include providing payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate, all due within ten days of award. The contractor is responsible for all testing of restored mechanical, plumbing, electrical, and life-safety systems, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is scheduled to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. The infrastructure scope covers primary and secondary electrical distribution, telecommunications, outside lighting, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and access necessary documentation.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in about 13 hours

General Info

Contract Value

$6,147,383

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

1131 Chapel Crossing Road, Glynco, GA, 31524, USA

Set-Aside

NONE

Award Issued Date

Documents

4

Addendum 1 - Amendment 00001 HSFLGL-10-R-00010

PDF, High priority: read this first1 page · amendment
High

HSFLGL-10-R-00010 Administration Facility Renovation Synopsis

PDF, High priority: read this first7 pages · presolicitation
High

HSFLGL-10-R-00010 Amendment 00001

PDF, High priority: read this firstamendment
High

HSFLGL-10-R-00010 Amendment 00002

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. The notice title changed. Set-aside added: 8a Competed. The notice description changed. The point of contact changed.

Notice updated

Response deadline added: Apr 1, 2010. The notice description changed.

Notice updated

Response deadline changed from Apr 1, 2010 to Apr 8, 2010. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Fletc Glynco Procurement Office
Contacts2 people available
OfficeBrunswick, GA, 31524, USA
Office AddressBrunswick, GA, 31524, USA
Contacts
Alberta L AbramContract Specialist
Sonya D. ArmstrongContracting Officer

Full Description

Show more
SOLICITATION NOTICE The Federal Law Enforcement Training Center (FLETC), Glynco, Georgia an Agency of the U. S. Department of Homeland Security is seeking qualified Design/Build firms to provide design and construction services for a renovated administration facility at the Federal Law Enforcement Training Center, Glynco, Georgia. This procurement is 100% 8(a) set aside. Size standard under NAICS 236220 is $33.5 million; Project Cost range is between $5,000,000.00 and $10,000,000.00. The work requires design and construction (renovation) of a 24,600 square ft., three story administration facility at the FLETC Glynco Campus, Glynco, Georgia. The estimated magnitude of this project is between $5,000,000.00 and $10,000,000.00 with a performance period of 550 calendar days. It is anticipated that 3 to 4 firms will be selected from this Phase One solicitation for participation in the RFP/Phase Two solicitation. The administration facility is a 24,600 square ft., three story steel framed structure used for office space in support of training programs at the FLETC. This project will include demolition back to the structural elements then renovation to a new administrative facility. Furnishings, equipment and fiber/copper/cable TV cabling shall be provided for all spaces. Personnel elevators and space for electrical, mechanical, IT and janitorial equipment are required. ADA requirements shall apply to first floor only. Site improvements such as exterior lighting, sidewalks, landscaping and handicapped parking are included. Existing parking space will remain as is. The building will have the goal of reducing energy use by 30% compared to the baseline building performance rating per ASHRAE Standard 90.1 Energy Standard for Buildings. The building must be able to achieve a LEED Silver rating; documentation must be provided to confirm LEED rating; submission for certification will be a government option. Additional design and construction criteria for the project will be included in the RFP package. The RFP package will include the Phase Two selection factors and will be issued to the firms selected from the Phase One solicitation. The RFP package will include design criteria for code compliance, performance and prescriptive specifications, design and construction submittal requirements, space utilization plans, floor plans, elevations, wall sections, finish schedule, conceptual site plan, site survey, and soils report. These were developed more than four years ago and may not be adequate for the construction/renovation work to be accomplished at this time. The criteria will rely upon industry standards, where allowable, to afford the Offeror a degree of design flexibility while meeting specific project requirements. The successful Offeror must design and construct a complete and usable facility as described in the RFP documents. The facility shall be constructed within budget identified in the Request for Proposal (RFP) and be fully usable upon acceptance by the Government. A quality control person and superintendent shall be on site at all times during the construction. The Contractor's safety program shall be administrated by a certified safety specialist. The quality control person shall be independent of other on-site personnel and shall devote his time exclusively to work under this contract. Quality control, safety, and environment plans shall be prepared for and approved by the Government prior to the start of construction. The period of performance is 550 calendar days. The Government intends to award a single (one (1)) contract as a result of this solicitation. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all proposers; to award the contract to other than the proposer submitting the lowest total price; and to award to the proposer submitting the proposal determined by the Government to be the most advantageous to the Government. This will be a two phase evaluation. Phase One will result in the development of a short list of approximately four (4) firms who will proceed to Phase Two. Phase One evaluation will be made solely on the written responses provided to the Government. Phase Two evaluations will be based on technical and price proposal submissions and result in selection of a single firm. Phase Two award will be based on technical evaluations and pricing with technical and pricing weighting approximately equally. The Government intends to evaluate proposals and award a contract without discussions with offeror's. Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Offeror's should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. An Offeror's proposed Phase Two team, including the firms and key personnel proposed in response to Phase One Solicitation, and as supplemented for purposes of the Phase Two Solicitation, must continue to remain fixed for the duration of the Contract except as noted herein. An Offeror may add consultants, subcontractors and/or key personnel to supplement design and/or construction resources as necessary to address proposal deficiencies. If extraordinary circumstances require a proposed change either during the solicitation or after contract award, the request with rationale must be submitted in writing to the Contracting Officer, whom at his or her sole discretion, provides written authorization of the change. Requests for a substitution must either be submitted prior to the submission of the Final Proposal Revision or must be clearly indicated in the Offeror's Proposal Cover Letter. The Offeror shall provide the complete qualifications and experience of the firm or individual proposed to be substituted. Changing personnel may affect an Offeror's overall rating. Unauthorized changes can result in the elimination of the Offeror from the Phase Two competition. Proposal Preparation - Phase One and Phase Two: Provide technical proposals complying with all instructions provided herein. The technical proposal shall be completely severable from the price proposal and shall not contain any pricing information. Do not exceed a total of fifty (50), 8-1/2" x 11", type written pages. The following documents will not count against the total number of pages; performance appraisals, diplomas and certificates, and any formatted forms specified herein. Printing will be on one side of the paper only, black text using a font no smaller than 11 point and single line spacing. Anything beyond the 50th page will be redacted and not evaluated. PHASE ONE: Firms formally organized as design build entities or design firms and construction contractors that have associated specifically for this project may submit proposals. The Offeror must evidence successful and satisfactory completion of 4 projects of similar size and complexity within the past five years. For firms associated specifically for this project, the design contractor and the construction contractor must each provide evidence of successful and satisfactory completion of 4 projects of similar size and complexity within the past five years. The design contractor shall include an Architect/Engineer of record. The design contractor shall have an existing active office located within the state of Georgia. The design of civil, architectural, structural, mechanical, electrical and other engineering features shall be accomplished or reviewed and approved by architects or engineers registered to practice in the particular professional field in the state of Georgia. Phase One Proposal: submit information package in a three ring binder, tabbed and labeled for each evaluation factor listed below. Factors are in decreasing order of importance. Submit original and 5 copies of the proposal. Factor 1 ORGANIZATION-50% importance (Tab 1) A. Fully identify and describe the proposed organization to manage and execute the design and construction, both in narrative form and organizational chart. Each offerror shall propose a specific team, including specific design firms which will be competitively evaluated and rated. 1. Narrative (Tab 1-A): a. Identity: If there is a joint venture association of firms, identify the individual firms, and describe the nature of the association. Clearly identify contractual responsibilities of each firm and the work to be performed by each. Provide copy of the joint venture agreement. If you are a construction contractor and elect to award a subcontract to an Architect-Engineer or multiple design firms, clearly identify all firms and contractual responsibilities between all firms. b. Home Office Support: The organization must provide for a sole source of responsibility for both design and construction. Describe the home office organization, responsibilities and lines of authority established for the team. Describe your capability and commitment to support the design and on-site management team. c. Construction Organization: Describe your resources available to support this project concurrently with other on-going work or projected new work. State why your construction firm is especially qualified to undertake this project. d. Design Organization: Describe the organization, responsibilities and lines of authority established to complete the design. Describe the resources available to support and accomplish this design concurrently with on-going work or projected new work. Describe the responsibility of the designer(s) during the construction phase. State why your design firm is especially qualified to undertake this project. e. On-Site Design/Construction Management Team (10%): Describe the on-site design/construction management team organization. Describe your plan for managing subcontract acquisition, execution and administration. If any of these subcontract functions will be handled by other than the job-site office, include that portion of the plan under the Home Office Support paragraph. f. Quality Control: Describe quality control in and between all identified firms. Identify where each position will be located (field office, home office, designer's office, etc.) Clearly identify the person responsible for quality control in each firm. 2. Organization Chart (Tab 1-B): Provide a project organization chart depicting the proposed organization which will manage and execute the design and construction described in the narrative. Arrange the chart by organizational levels and location, depicting authority lines. Clearly delineate on-site from off-site personnel. Factor 2 PAST PERFORMANCE - 30% importance A. Prime Contractor: Provide examples of construction projects (minimum of three) which have been completed within the past five years that are similar to this project in scope and complexity. (Tab 2-A) B. Design Firm: Provide examples of projects (minimum of three) which have been completed within the past five years that are similar to this project in scope and complexity. (Tab 2-B) C. Required Information: for each cited example provide the following: 1. Project Name, Location and type of facility. 2. Nature of firm's responsibility (design, construction, prime, subcontractor, etc) 3. Type of contract (design, design/build, construction). 4. Project owner's name and address. Owner POC for reference, telephone number, fax and email address. POC should have sufficient level of project responsibility to have knowledge of firm's performance. 5. Project Milestone dates (start, contract completion and actual completion). 6. Project Size and Cost (Initial and final cost for design and construction). 7. Project Scope including description of major building elements including size and complexity. 8. Problems encountered and corrective actions taken. 9. Relevance of project experience to solicitation project. 10. Final performance rating (provide explanation for unsatisfactory rating). 11. Additional project information (at offeror's discretion). Factor 3 TECHNICAL APPROACH - 20% importance (Tab 3): Provide a narrative, describing your design approach for the project. The narrative should describe how you plan to approach the design effort and detailing of the building, site and associated utilities. Through the narrative discussion addressing the technical approach, indicate reason(s) why the Offeror believes it is especially qualified to undertake the project. Offeror is encouraged to provide examples to support their qualifications or to demonstrate capabilities of the proposed project team for this project. This item shall not exceed three pages. Brochures, photos, etc. should not accompany the narrative Phase Two - Evaluation Factors Factor 1 KEY PERSONNEL AND QUALIFICATIONS - 50% importance Submit data showing names, qualification and experience of the following key personnel. Indicate whether each individual had a significant part in any of the project examples cited in Phase One proposal under the "Past Performance" factor. A. Design Personnel: Include state registration numbers for all engineers, architects and project managers. The individuals listed below shall produce the designs: 1. Design Project Manager 2. Designer of Record for the following disciplines: a) Architectural b) Electrical, Electronics, Telecommunications, etc. c) Mechanical d) Fire Protection e) Structural f) Civil B. Construction Personnel: Include as a minimum, the key personnel listed below: 1. Project Manager - person responsible for all design and construction operations. 2. On-site Manager/Superintendent 3. Project Scheduler 4. Quality Control Manager Key Personnel Information: DESIGN: Provide on separate sheets the qualifications of: Project Manager: Design Quality Control manager; Project Architect; all engineers to perform: civil, electrical, instrumentation, mechanical, fire protection, communications, and structural design. Name and Title: Assignment on this Project: Name of Your Firm: No. of years with this Firm: No. of years with other Firms: Education: Degree(s)/Institution/Year/Specialization Active Registration: #: State(s): First Year/Current Year: Describe your specific experience and qualifications relevant to this project: CONSTRUCTION: Provide on separate sheets the qualifications of: Project Manager; On-site Manager (Superintendent), On-site Quality Control Manager, and Project Scheduler. Name and Title: Assignment on this Project: Name of Your Firm: No. of years with this Firm: No. of years with other Firms: Education: Degree(s)/Institution/Year/Specialization Active Registration: #: State(s): First Year/Current Year: Describe your specific experience and qualifications relevant to this project: Factor 2 CONCEPTUAL DRAWINGS AND PROPOSAL COMPLIANCE REVIEW - 30% importance Submit conceptual building design sketches or drawings including floor plans, elevations and perspective views which adequately illustrate the proposed construction. Provide space utilization matrix identifying rooms and number of each based on proposed conceptual design. Perspective sketches or drawings which graphically show/describe the building and site development to include building orientation, walkways, and landscaping. Sketches or drawings shall be to scale, dimensioned and including proposed materials of major building elements, methods, quality in sufficient detail evidence conformance to the RFP. Factor 3 PRELIMINARY PROJECT SCHEDULE 10% importance Provide a narrative, describing your scheduling capability and planning organization. Address how you maintain, update and use your schedule. Describe the equipment and software you use for project scheduling. Submit a preliminary schedule for design and construction. This preliminary schedule will, after contract award, be replaced with a final schedule as required in the RFP technical sections. Schedule shall include a critical path through design and construction phases after Notice to Proceed through final acceptance and shall be graphically represented. Include durations in calendar days for all major milestones/activities. Give special attention to the following features: Design phase shall include events associated with design reviews, submittals and handling of review comments. Construction phase shall include critical milestones for building construction, site-work and utilities. Include activities for building commissioning, O&M document submissions and operator training for systems as required by specifications. Clearly identify anticipated constraints on the schedule such as labor or material availability, weather, long lead items, etc. Describe capability and flexibility to plan and adjust the schedule to meet the contract duration. NOTE: A contract awarded from this proposal which shows a shorter duration will become the new contract duration period. Factor 4 QUALITY CONTROL PLANS - 10% importance The successful Offeror must implement a quality control program which will ensure high quality design and construction. Provide separate preliminary plans for quality control of design and construction. As a minimum, include the following items in the preliminary plan: Describe your procedures and responsibilities for review of design documents, review of shop drawings that are extensions of designs and material submittals. Address the designer of record's role in this process. Describe your procedures for resolution/coordination of review comments from both your in-house personnel and from Government reviewers. Describe your procedures for coordinating the design development between the designer and prime contractor. Describe your procedures for coordination of subcontractor quality control and prime contractor quality control. Describe your procedures for maintaining up-to-date drawings and specifications on the job site and for preparation and submittal of as-built construction drawings and shop drawings. PRICE PROPOSAL The price proposal shall include the total price of the design build, including material, labor, equipment, overhead, profit, general conditions, and other costs. The Contracting Officer will use cost and price analysis and, as necessary, other cost evaluation techniques outlined in FAR Part 15.305 to evaluate the price proposal, not only to determine whether it is reasonable, but to determine the Offeror's understanding of the work and ability to perform the contract. Price proposals will be evaluated by the assigned price evaluator independent of technical evaluation. Unsupported or unreasonable price proposals may result in discussions with Offeror, or rejection of the proposal in its entirety. ****CONTRACTORS REQUESTING CONSIDERATION FOR PHASE TWO MUST SUBMIT NON-PRICED PHASE ONE REQUIREMENTS TO THE ADDRESS LISTED BY THURSDAY, APRIL 8, 2010. PACKAGES SHOULD BE CLEARLY MARKED - ATTENTION: ALBERTA ABRAM "HSFLGL-10-R-00010 PHASE ONE TECHNICAL SUBMISSION" "DO NOT OPEN IN MAIL ROOM" ELECTRONIC PROPOSALS WILL NOT BE ACCEPTED. WRITTEN QUESTIONS MAY BE SUBMITTED TO THE CONTRACTING OFFICER VIA FAX +1 (555) 000-0000 OR EMAIL: contact@example.gov NO LATER THAN MARCH 26, 2010. Amendment 00001 is hereby issued and is incorporated by attachments.

More opportunities from Department Of Homeland Security → Fletc Glynco Procurement Office

Same awarding agency

NAICS: 236220
New
Federal
Building 262 Renovation, FLETC Glynco, Georgia
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Request for Proposal for a single firm fixed price contract to perform the renovation of Building 262 at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia. This acquisition is a 100% Small Business Set-Aside under NAICS code 236220 for commercial and institutional building construction. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision for the repair and alteration of the office building, including the removal and repositioning of furniture and the verification of all site conditions. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery requirement of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, at 11:00 AM ET, with a final deadline for questions on November 6, 2026. Award evaluation is based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Bidders must provide a bid guarantee of 20% of the bid price or 3 million dollars, whichever is less, and are required to furnish performance and payment bonds equal to 100% of the contract price. Access to controlled documents requires a signed Non-Disclosure Agreement. Contractors must also comply with the FLETC Hazardous Waste Management Plan and ensure all vehicles are registered with the facility.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS