Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on August 6, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Construction for HHS OMHA Office at US Courthouse Seattle

Closed
GS-10-P-17-LT-R-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 16 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 16 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 16 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

United States District Courthouse Seattle 700 Stewart Street, SEATTLE, WA, 98101-1271, USA

Set-Aside

NONE

Documents

25

PBS Past Performance Questionnaire

DOCX, Low priority4 pages · past-performance
Low

1-SOW_HHS_OMHA_04-14-2017.pdf

PDF

2-GS-10-P-17-LT-R-0003_Solicitation_HHS_OMHA_USCH_Seattle_04-13-2017.pdf

PDF

3-GS-10-P-17-LT-R-0003_Agreement_HHS_OMHA_USCH_Seattle_04-14-2017.pdf

PDF

Appendix_9_-WD_Construction_WA170036_Mod_5_03-10-2017.pdf

PDF

Appendix_9_-WD_Construction_WA170036_Mod_7_06-02-2017.pdf

PDF

EXHIBIT_1_PRICE_SCHEDULE.xls

XLS

Exhibit_3_Qualifications.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0001_04-26-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0002_05-03-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0003_05-04-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0004_05-08-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0005_05-10-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0006_05-15-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0007_06-01-2017.pdf

PDF

GS-10-P-17-LT-R-0003_Amend_0008_06-09-2017.pdf

PDF

GSA_Region_10_-_Dry_Sprinkler_System_Guidelines_150826.pdf

PDF

GSA_Region_10_-_FA_Install_and_Testing_Policy_%2812-22-2016%29.pdf

PDF

GSA_Region_10_-_Wet_Sprinkler_System_Guidelines_150826.pdf

PDF

Justification_HHS_OMHA_Seattle_PACS_Final_redacted.pdf

PDF

Offeror_Representations_and_Certifications_Form.docx

DOCX

Read_Me_First_-_SBU_Acknowledgement_Document.pdf

PDF

SF_1442_GS-10-P-17-LT-C-0003.pdf

PDF

Subcontracting_Model_Plan_Template.docx

DOCX

Vendor_Fitness_Determination_Training_Manual.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

15 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from May 1, 2017 to May 16, 2017. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 16, 2017 to May 19, 2017. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 19, 2017 to May 23, 2017. The notice description changed.

Notice updated

Response deadline changed from May 23, 2017 to Jun 15, 2017. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R10 Construction Acquisitions Branch
Contacts2 people available
OfficeTacoma, WA, 98401, USA
Office AddressTacoma, WA, 98401, USA
Contacts
Keith R. GoodsellContracting Officer/Contract Specialist
Dawn M AshtonSr. Contracting Officer

Full Description

Show more
Amendment 0001 is issued as of 04/26/2017, which provides a list of attendees for pre-proposal conference and site visit held on Monday, 04/24/2017 (see SF 30 and attachments). Amendment 0002 is issued as of 05/03/2017, which provides for a second site visit on 05/08/2017 at 10:00 a.m. Pacific Time, extends the date for submission of questions to 05/11/2017, and extends the date and time for submission of proposal to 05/18/2017 at 4:00 p.m. Pacific Time. See the SF 30 for specific details. Amendment 0003 is issued as of 05/04/2017, which provides a transcription correction and clarification regarding debris removal. See the SF 30 for specific details. Amendment 0004 is issued as of 05/08/2017, which provides for a third site visit on 05/10/2017 at 110:00 a.m. Pacific Standard Time (See SF 30 for details) Amendment 0005 is issued as of 05/10/2017, which extends the date and time for questions to May 15, 2017 and the due date for submission of proposals until May 23, 2017 at 2:00 p.m. Pacific Standard Time. (See SF 30 for details). Amendment 0006 is issued as of 05/15/2017, which provides for a fourth site visit on Thursday 05/18/2017, extends the date and time for questions until 05/29/2017, and extends the date and time for submission of proposal until 06/15/2017. (see SF 30 for details). Amendment 0007 is issued as of 06/01/2017, which provides answers to questions and requested building files. See SF 30 and attachments for details. Contact Contracting Officer Keith Goodsell for password to zip files. Amendment 0008 is issued as of 06/09/2017, which provides answers to questions, updates the Construction Wage Determination, and add a redacted approved justification for PACS. Note: Ensure that you allow for sufficient time (one hour or more before the proposal is due) to ensure that your proposal has been properly uploaded to the fbo.gov website. It is highly recommended that you use Internet Explorer to do so and that you confirm document upload properly before submitting the proposal.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS