Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Construction of a Central Utility Plant (CUP) at the Ft Harrison, MT VAMC

Closed
W9128F25SM009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 9 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 10 hours ago

DEADLINE

in 23 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Harrison, MT, 59636, USA

Set-Aside

NONE

Documents

1

W9128F25SM009 Sources Sought – Fort Harrison CUP

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Sources Sought. Response deadline changed from Dec 24, 2024 to Jan 13, 2025. The notice title changed. NAICS code changed from 541330 to 236220. The notice description changed. The point of contact changed.

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
Sources Sought: W9128F25SM009 General. This is a SOURCES SOUGHT notification for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. Notice Details. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Omaha District (CENWO) has been tasked to identify interest in a Design-Build Contract for Construction Services as defined below in support of CENWO's design and construction effort at the Fort Harrison Veteran's Affairs Medical Center (VAMC), Ft Harrison, MT. Responses to this sources sought announcement will be used by the government to determine the appropriate level of small business participation and to develop the acquisition strategy. The North American Industrial Classification Code (NAICS) for this requirement is: 236220, - Commercial and Institutional Building Construction. The related size standard is: $45M. The purpose of this Sources Sought notice is to gather information on the interest, capabilities, and qualifications of small and large businesses in the industry, alongside collecting data on the recent history of construction projects within the local labor market. This notice supersedes all previous requests for CENWO's design and construction efforts at Fort Harrison. This effort targets: Small Businesses (SB Small Disadvantaged Businesses, including 8(a) firms Historically Underutilized Business Zones (HUBZone) Economically Disadvantaged Women-Owned Small Businesses (EDWOSB) Service-Disabled Veteran-Owned Small Businesses (SDVOSB) Other than Small Businesses (OTSB) All potentially interested parties are strongly encouraged to submit responses. Project Scope. CENWO intends to procure Design-Build Services for the construction of a new Central Utility Plant (CUP) at the Fort Harrison, MT Veterans Affairs Medical Center (VAMC), enhancing campus utility services. This initiative represents a significant upgrade to the VAMC's infrastructure, promising improved efficiency, reliability, and sustainability of utility services across the campus. Current Status: Design and planning activities are in progress to refine the Design-Build Request for Proposal (RFP). New Construction: The project involves building a new CUP with an approximate gross square footage (GSF) of 15,300, located north of the main hospital building. Utility System: Establishment of a comprehensive utilities distribution system. Demolition and Modifications: Demolition or modification of existing campus heating, hot water, and chilled water systems. Demolition of the old boiler plant and associated backup generator buildings to clear space for new developments. Project Magnitude: The construction cost is projected to range between $25,000,000 and $100,000,000. Timeline: The estimated duration from the Notice to Proceed (NTP) for construction is 1,277 calendar days. General site conditions: This site offers both challenges and opportunities for development, given its proximity to key campus facilities, existing infrastructure, and the natural slope of the land which must be considered for effective water management and site planning. Location: The site is positioned near the property line abutting the National Guard installation to the north, with the existing B170 warehouse building to the west, and an anticipated Parking Garage and Outpatient Mental Health Facility (to be constructed by others) to the east. Land Use: The site partially overlaps with an existing parking lot and extends into undeveloped, naturally vegetated land. Topography: The terrain slopes from west to east, with surface water runoff characterized predominantly by sheet flow; there are no significant concentrated flow paths within the project area. Storage and Temporary Structures: The area may occasionally host shipping containers, either on or near the site, influencing site planning and access considerations. Drainage and Roadways: Most of the campus features open-section roadways without curbs or gutters, except around the main hospital where traditional curb and gutter systems are in place. Utilities: Existing Infrastructure: The site is crossed by several utility services including sanitary sewer, signal/telecom, and water lines, which could support further development. Lighting: There are light poles along the parking lot's perimeter, potentially affecting lighting design for new constructions. Landscaping: While the hospital area is characterized by irrigated turfgrass, this feature does not extend to the project site, maintaining a more natural landscape. Central Utility Plant: The building's design for the (CUP shall focus on: Accessibility: The structural engineering of the CUP emphasizes accessibility, providing easy access for maintenance of overhead piping and duct systems, and accommodating future equipment installations or removals. Dimensions: The structure is assumed to be approximately 30 feet in height and 15,300 gross square feet in area. Construction Materials: Utilizes load-bearing concrete masonry unit (CMU) walls, finished with an exterior face brick that aligns with the campus's architectural style. Rain-Screen System: Employed across all exterior walls to effectively control moisture: Components: Includes an outer brick veneer, an intermediate air space for drainage, rigid insulation for thermal resistance, and a vapor barrier directly on the CMU to prevent moisture ingress. Composite Metal Panels: Strategically placed to offer visual distinction or meet specific functional requirements, these panels also incorporate a rain-screen system for moisture management. Aesthetic and Functional Integration: The building's design shall not only blend with the existing campus architecture but also support operational efficiency. Durability and Maintenance: The use of modern construction techniques and materials ensures the structure's longevity and ease of maintenance, adhering to contemporary standards for energy efficiency and building performance. Utilities Distribution System: The distribution system for the new CUP shall be engineered to integrate with both the future hospital complex and the existing steam and chilled water systems. The main connection from the CUP to the Main Hospital (Building 154) will occur via the primary utilidor, terminating at Mechanical Room B100 in the building's basement. From here, utility piping will connect to final equipment points either through secondary utilidors, the crawl space beneath Building 154, or by routing through other existing buildings. The bulk oxygen tank and distribution system must also be relocated from its current location on Patriot's Way, to a new slab located near Building 170 (warehouse), and new connections to and through the primary utilidor must be made to Building 154. This system is primarily routed through new underground utility corridors, approximately 8 feet by 8 feet, and extends into existing structures to serve the heating, cooling, and domestic hot water requirements of several buildings: Building 141, including the Hydronic Plant Building 154 Building 154A Building 169 Future Building 173 In addition to the main utility conduits for steam, steam condensate, and chilled water, the utilidors will be equipped with: Lighting: To ensure safe working conditions. Ventilation: To maintain air quality within the corridors. Drainage: As mandated by building codes to handle potential leaks or moisture. The design of the utilidors will prioritize safety, providing adequate space for maintenance and operations personnel. Building System Connection and Demolition: This approach ensures that the new utility systems are effectively integrated while maintaining or improving the operational capabilities of the existing infrastructure. Steam Utility Connections: New steam utilities from the CUP will be integrated with the existing steam systems within the buildings, ensuring a seamless transition. Hydronic System Upgrade: Building 141: The current hydronic heating boilers will be replaced by shell and tube heat exchangers. This upgrade will convert steam into heating hot water, preserving the functionality of the existing hydronic hot water distribution system. Chilled Water System Integration: Utility Linkage: New chilled water utilities from the CUP will connect to the existing chilled water systems across the campus. Connections: The new chilled water connections to each existing chilled water distribution system requires a transition from the new chilled water only system to the existing glycol-based system. Backup Preservation: The existing chillers and distribution systems will be kept operational as a backup measure. Control Systems for Chilled Water: Operational Flexibility: Each connection point in the chilled water systems will feature: Flow Metering: To accurately measure water flow. Temperature Monitoring: For precise control of cooling capacity. Motorized Valving: Enabling the selection between using the CUP's chilled water or operating individual building chillers, enhancing system flexibility and efficiency. Building 141 (Existing Hydronic Plant): Current Equipment: The facility currently houses two Superior fire tube hot water boilers from 2010, each with a Maximum Allowable Working Pressure (MAWP) of 60 psig, rated at 200 Boiler Horsepower (BHP) or 6,700,000 BTU/h (MBH), and two Patterson Kelly hot water boilers from 2015, boasting an MAWP of 160 psig, rated at approximately 60 BHP or 2,000,000 BTU/h (MBH). Upgrade Plan: These boilers will be substituted with shell and tube heat exchangers, supported by the new Central Utility Plant (CUP). The old equipment will be salvaged, with the value recaptured in the project cost. Building 169 Extension: The hydronic heating boilers and domestic water heaters in Building 169 will also transition to shell and tube heat exchangers, while preserving the existing heating hot water and domestic hot water distribution systems. Building 169 (Residential Rehabilitation): Boiler Replacement: This building features three unitary boilers, all slated for replacement by heat exchangers connected to the new CUP. The old equipment will be salvaged off-site with value recaptured in the project cost. Service must be maintained to the existing distribution system during the transition, with only limited disruptions during cutover. Building 171 (Operational Boiler Plant): Operational Continuity: Must remain active until the requirements for commissioning and stable operation of the new CUP are complete.. Current Setup: Equipped with three low-pressure Superior fire tube steam boilers from 2012 (30 psig MAWP, 8,625 lb/hr steam capacity) and two high-pressure counterparts (150 psig MAWP, 5,175 lb/hr steam capacity). Post-CUP Operation: Building 171 will be gutted and maintained in an environmentally controlled state following the transition. This equipment is to be disposed of off-site and salvaged with value recaptured in the project cost. The new CUP is to be operational for a full warranty period prior to decommissioning this plant. Continuity of operations is required during the transition to the new CUP. Provisions for temporary plant operations must be provided that meet this requirement during transition. Tank Removal: The existing approximately 10,000-gallon underground storage tank must be removed in adherence to Montana Department of Environmental Quality standards, followed by site restoration. Service Access Road. Design and build an access road loop by extending Devil's Brigade Way around the north end of campus to allow for service access to B170 once the existing Devil's Brigade paralleling Patriot's Way is closed for construction. Communications with Industry. CENWO Scheduled Teleconference for Project Information: Date and Time: The teleconference is scheduled for Thursday, 23 January 2025, at 1400 CST. Objective: This session will provide additional project details and offer an opportunity for interested parties to ask questions. Please be aware that the information shared during this teleconference is provisional and subject to updates as the project progresses. How to Join: Contact: To obtain the teleconference access information and any accompanying exhibits, please reach out to Adam Beaver, the Contract Specialist, via email at: adam.l.beaver@usace.army.mil (mailto:adam.l.beaver@usace.army.mil). Email Content: SUBJECT: Sources Sought W9128F25SM009 - Design-Build Central Utility Plant (CUP) at Ft. Harrison, MT VAMC - Teleconference Info Request BODY: Firm Details: Include your firm's name and CAGE (Commercial and Government Entity) code. Participants: List the names of all individuals from your firm who will be participating in the teleconference. Dial-Ins: Specify the expected number of dial-ins from your organization. Input for Acquisition Strategy: Provide any questions, recommendations, or concerns that could impact the acquisition strategy for this project. Acquisition Input: This is your opportunity to influence the project's direction by addressing potential issues or suggesting improvements at an early stage. We encourage all interested parties to participate to gain a deeper understanding of the project scope and to clarify any queries. Project Labor Agreement Survey. As part of this notice, CENWO is also soliciting input from the construction community regarding the potential application of Project Labor Agreements (PLAs) for this construction project at the Veterans Administration Medical Center in Fort Harrison, MT. A PLA is described as a pre-hire collective bargaining agreement between a Prime contractor and labor organizations, setting employment terms for a specific construction project under 29 U.S.C. 158(f). A Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. Federal Acquisition Regulation (FAR 22.503) Policy: PLAs are recognized as tools to promote economy and efficiency in federal procurement. Per Executive Order 13502, agencies are encouraged to consider mandating PLAs for large-scale construction projects to enhance project management and outcomes. An agency may mandate that contractors and subcontractors on the project negotiate or become party to a PLA with labor organizations if it is deemed that such agreements will: Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards and other matters; and Be consistent with law. Reference: FAR 52.222-33 Notice of Requirement for Project Labor Agreement; FAR 52.222-34 Project Labor Agreement Please provide your feedback on the following: Do you have knowledge of PLAs being used on similar local projects? If so, please provide supporting documentation. Are there known skilled labor shortages for the crafts required for this project in the area? Elaborate and provide documentation if possible. Are there any time-sensitive constraints or scheduling concerns that could impact the project timeline? Elaborate and provide documentation if possible. Specify reasons how a PLA might advance the Federal Government's interest in economy and efficiency in procurement. Specify reasons why you believe a PLA might not advance the Federal Government's interest in economy and efficiency in procurement. Additional information you believe should be considered on the use of a PLA on this project. Additional information you believe should be considered on the non-use of a PLA on this project. The information gathered in this survey should include the following information on projects completed in the last 2 - 5 years: Project Name and Location Detailed Project Description Initial Cost Estimate vs. Actual Final Cost Was the project completed on time? Number of craft trades present on the project Was a PLA used? Were there any challenges experienced during the project? Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with: SUBJECT: - Sources Sought W9128F25SM009 - Design-Build Central Utility Plant at the Ft. Harrison VA contract. Please email to adam.l.beaver@usace.army.mil and jeffrey.w.wyant@usacea.army.mil. Responses must be received by 1400 on 13 January 2025, to be considered. Responses to this Sources Sought shall be limited to fifteen (15) pages and include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE and UEI number. Firm's business category and size to include any official teaming arrangements as a partnership or joint venture. The categories include Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Business, 8(a) firm, Historically underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB), Women-Owned Small Business (WOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). Provide a maximum of three D-B project examples, similar in size, scope and complexity to the work described in this notice. Provide details of the project(s) including the scope, contract number if available, the project's final price, start and end dates of the construction work, complexity of the job, and small business participation, if applicable. Additionally, identify whether you were the Prime or a Subcontractor on the project. Finally, please provide any project references including owner with phone number and email address. This ensures clarity and brevity in the analysis process. The Government may verify information in CPARS or PPIRS. Provide information on your bonding capability. Specifically identify capacity of performance and payment bonds, both single and aggregate. In addition to the submission for the Sources Sought above, the responses to the Project Labor Agreement Survey shall be limited to five (5) pages, and include the following information: Responses to Project Labor Agreement Survey, 2., items 1. through 7. Substantiating project information as outlined in Project Labor Agreement Survey, 3., items 1. through 7. Disclaimer and Important Notes. Responses will be shared with Government personnel with a need-to-know basis, but otherwise will be held in strict confidence. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this sources sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the source selection process to be eligible for award of a Government contract. CENWO intends to synopsize a requirement for Design-Build Construction Services in support of the CUP project at the Ft Harrison, MT VAMC. A fully developed Request for Proposal is currently anticipated to be issued during the Spring/Summer of 2025.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS