Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design Build Construction Services for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC)/Paving Project, Santa Teresa, NM

Awarded
47PH0825R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awards Red Eagle 3 JV the design-build construction services for the Santa Teresa Land Port of Entry Border Roadway Improvement and Construction (BRIC)/Paving Project in Santa Teresa, New Mexico, with a focus on replacing approximately 190,000 square feet of concrete pavement using a phased approach to maintain daily port operations. The project is procured under a total small business set-aside, with the contract governed by the General Services Administration’s Public Buildings Service and administered through its Capital Project Acquisition Delivery Division Central Branch in Fort Worth, Texas. The award follows a competitive, trade-off evaluation process prioritizing past performance (40% weight), experience as a design-build contractor (40% weight), and technical and management approach (20% weight), with cost playing a secondary role. Performance is structured around a 155-day design phase and a 335-day construction phase, with substantial completion due within 335 calendar days of the Design Notice to Proceed and final completion within 30 days thereafter, requiring all work to commence within 10 days of the Notice to Proceed. The contractor must deliver fully coordinated civil, structural, and MEP drawings, comply with GSA Division One specifications, and adhere to stringent quality assurance and control requirements, including third-party testing, CPM scheduling via Microsoft Project or Primavera P6, submittal management through GSA’s Kahua PMIS, and adherence to the PBS Interim Core Building Standards. Environmental compliance mandates a 50% non-hazardous waste diversion goal, with a formal waste management plan submitted within 14 days of notice to proceed, and all materials must meet Buy American provisions. Safety and security protocols are rigorous, requiring a site-specific Construction Safety and Health Plan, HSPD-12 credentialing for all personnel accessing restricted areas, no-camera policies without written approval, and weekly schedule submissions for overtime work. Documentation requirements include comprehensive photographic and video records of progress, electronic submission of record documents including BIM models and as-built drawings, and closeout deliverables such as operation and maintenance manuals. The contractor is bound by clauses on differing site conditions, site investigation responsibilities, and performance obligations, with liquidated damages applicable for delays. All work must minimize disruption to border operations, coordinate with Customs and Border Protection, and comply with federal, state, and local codes including OSHA, NFPA, and ASTM standards. Payment procedures require accurate Schedule of Values, certified payroll, and electronic invoicing through GSA systems

General Info

Design-build contract for pavement repair at Santa Teresa LPOE, $5-$10M, small business set-aside.

Contract Value

$8,281,140

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Santa Teresa, NM, 88008, USA

Set-Aside

SBA

Award Issued Date

Documents

43

Amendment 1 to Solicitation 47PH0825R0007 for Santa Teresa LPOE BRIC Project

PDF, High priority: read this first18 pages · amendment
High

Amendment 2 to Solicitation 47PH0825R0007 for Santa Teresa Land Port of Entry BRIC

PDF, High priority: read this first27 pages · amendment
High

Amendment 3 to Solicitation 47PH0825R0007 for Santa Teresa Land Port of Entry BRIC

PDF, High priority: read this first161 pages · amendment
High

Design Build Contract 47PH0825R0007 Santa Teresa BRIC

PDF, High priority: read this first35 pages · contract-document
High

GSA 011000 Summary - Santa Teresa Land Port of Entry BRIC

DOCX, High priority: read this first2 pages · summary
High

GSA 012700 Unit Prices

DOCX, High priority: read this first1 page · unit-prices
High

GSA 01 31 00 Project Management and Coordination

DOCX, High priority: read this first10 pages · sow
High

GSA 013110 Critical Path Method Scheduling Specs

DOCX, High priority: read this first11 pages · specifications
High

GSA 01 32 00 Construction Progress Documentation

DOCX, High priority: read this first3 pages · sow
High

GSA 01 40 00 Quality Assurance & Quality Control Requirements

DOCX, High priority: read this first9 pages · sow
High

GSA 01 42 00 General References

DOCX, High priority: read this first13 pages · specifications
High

GSA 01 60 00 Product Requirements

DOCX, High priority: read this first4 pages · product-requirements
High

GSA 01 74 19 Construction Nonhazardous Waste Management & Disposal

DOCX, High priority: read this first6 pages · specifications
High

GSA 01 78 10 Project Record Documents

DOCX, High priority: read this first4 pages · sow
High

GSA CBS Submittal Matrix 2025 Version 1.0

PDF, High priority: read this first274 pages · submittal-matrix
High

GSA Closeout Procedures Section 01 77 00

DOCX, High priority: read this first7 pages · sow
High

GSA P-120 Public Buildings Service Cost and Schedule Management Policy

PDF, High priority: read this first81 pages · policy
High

GSA Photographic Documentation Section 013220

DOCX, High priority: read this first3 pages · sow
High

GSA Section 011400 Work Restrictions

DOCX, High priority: read this first3 pages · specifications
High

GSA Section 012400 Options

DOCX, High priority: read this first1 page · sow
High

GSA Section 012500 Substitution Procedures

DOCX, High priority: read this first4 pages · specifications
High

GSA Section 01 29 00 Payment Procedures

DOCX, High priority: read this first5 pages · sow
High

GSA Section 01 30 00 - Project Management Information System (PMIS)

DOCX, High priority: read this first2 pages · sow
High

GSA Section 013300 Submittal Procedures

DOCX, High priority: read this first10 pages · sow
High

GSA Section 01 50 00 Temporary Facilities and Controls

DOCX, High priority: read this first12 pages · specifications
High

GSA Section 01 59 30 Security Procedures

DOCX, High priority: read this first3 pages · specifications
High

GSA Section 01 59 50 Safety and Health

DOCX, High priority: read this first7 pages · sow
High

GSA Section 01 70 00 Execution Requirements

DOCX, High priority: read this first5 pages · sow
High

GSA Section 01 73 10 Cutting and Patching

DOCX, High priority: read this first4 pages · sow
High

GSA Solicitation 47PH0825R0007 Past Performance Questionnaire Factor 1

PDF, High priority: read this first6 pages · past-performance
High

GSA Solicitation #47PH0825R0007 Pricing Sheet

XLSX, High priority: read this first3 pages · pricing-sheet
High

PBS Interim Core Building Standards Memorandum 24FEB25

PDF, High priority: read this first11 pages · memorandum
High

Santa Teresa LPOE Pricing Sheet

XLSX, High priority: read this first4 pages · pricing-sheet
High

Section 01 73 20 - Selective Demolition

DOCX, High priority: read this first7 pages · specifications
High

Solicitation 47PH0825R0007 Design Build Contract Santa Teresa Land Port of Entry

PDF, High priority: read this first2 pages · ifb
High

Solicitation 47PH0825R0007 Santa Teresa Land Port of Entry BRIC

PDF, High priority: read this first27 pages · rfp
High

SOW 47PH0825R0007 Santa Teresa Land Port of Entry Border Roadway Improvement

PDF, High priority: read this first46 pages · sow
High

Standard Form 24 Bid Bond

PDF, High priority: read this first4 pages · bid-bond
High

B. 1. NM20250039 Heavy 2025 01 24

PDF, Low priority5 pages · other
Low

DB Communications Plan Template FY25

DOCX, Low priority28 pages · template
Low

GSA 527 Rev. 10/2021 Contractor’s Qualifications and Financial Information

PDF, Low priorityform
Low

NM20250035 Highway Project June 2025

PDF, Low priority6 pages · other
Low

Santa Teresa LPOE Geotechnical Investigation Report April 2022

PDF, Low priority19 pages · geotechnical-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 21, 2026 to Feb 4, 2026. The notice description changed.

Notice updated

Response deadline changed from Feb 4, 2026 to Feb 6, 2026. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs Project Delivery Capital Construction - Branch Central
Contacts2 people available
OfficeWashington, DC, 20405, USA

Full Description

Show more

Contract number 47PB5326C0005 is awarded to Red Eagle 3 JV to provide Design Build Construction Services for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC)/Paving Project in Santa Teresa, NM.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking a subcontractor for road and parking lot repairs at the Joliet Job Corps Center in Joliet, Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. The selected contractor must provide all labor, materials, equipment, and supervision, ensuring all work meets industry standards and that all waste is disposed of at an approved offsite facility. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, and will be awarded based on overall best value. To be considered, bidders must conduct a mandatory physical site visit and submit a detailed cost breakout on company letterhead along with the MTC Bid for Lump Sum Contract form. Because the project involves federal facility construction exceeding $2,000, it is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll. For bids equal to or greater than $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. Final payment is contingent upon a successful final inspection, the completion of a punch list, and the submission of closeout documentation, including a release of liens and a notice of final completion.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center for the Southbound Shuttle Stop project at Bryce Canyon National Park, Utah. This small business set-aside project, categorized under NAICS 237310, has an estimated value between 1,000,000 and 5,000,000 dollars. The scope of work includes the construction of additional shuttle lanes, new and extended culverts, multi-use trail realignment, a cast-in-place retaining wall, a new shuttle stop shelter, sidewalk and ADA ramp construction, and the replacement of MUTCD signs and pavement striping. Due to the project location, contractors must implement protective measures for the adjacent UT Prairie Dog Habitat and adhere to strict environmental preservation constraints. The anticipated period of performance is 150 calendar days, with a specific window identified from May 1, 2027, to September 28, 2027. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating five non-price factors: technical approach, schedule, project experience, key personnel experience, and past performance. These factors are collectively considered approximately equal in importance to the proposed price. Requirements for the selected contractor include providing bid, performance, and payment bonds, complying with Davis-Bacon Act wage determinations, and following OSHA safety standards. Proposals must be submitted electronically by October 19, 2026, and include a detailed technical narrative, a construction schedule, and a lump sum price for the shuttle stop improvements.
Dsc Contracting Services Division

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
SLED
City of Los Angeles Sidewalk Repair Program (Project)The City of Los Angeles Sidewalk Repair Program is a citywide initiative covering approximately 467 square miles, designed to improve accessibility for persons with mobility disabilities in compliance with local, state, and federal requirements. This project is implemented pursuant to the Willits Settlement and is governed by ordinance LAMC 62.104.1, which streamlines the review and approval process for sidewalk repairs. The scope of work includes curb ramp repairs, crosswalk paving, utility work, and comprehensive street tree management involving retention, removal, replacement, canopy pruning, and root pruning. The program is scheduled to include applicable utility work for a duration of 30 years. To facilitate efficiency, the new ordinance establishes parameters for ministerial approvals to avoid further environmental reviews for most repairs, while providing a streamlined discretionary process for projects falling outside those parameters or those involving the removal of three or more street trees. The project adheres to Mandatory Project Design Features and a revised Street Tree Retention, Removal and Replacement Policy. Official approval was granted by the City Council and Mayor on August 6, 2026, following the certification of the Recirculated Environmental Impact Report and the 2021 Environmental Impact Report to fulfill California Environmental Quality Act requirements. The primary point of contact for the program is Environmental Supervisor II Lauren Rhodes.
City of Los Angeles

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
HSIP Cycle 11 – Citywide Pedestrian Safety Improvements Project
Solicitation # 3027
The City of Desert Hot Springs is soliciting sealed bids for the HSIP Cycle 11 Citywide Pedestrian Safety Improvements Project, identified as City Project No. 3027. The project involves constructing pedestrian and traffic signal safety improvements at seventeen existing signalized intersections within the city. Key deliverables include upgrading traffic signal head backplates to yellow retroreflective versions, implementing Leading Pedestrian Intervals, installing high-visibility thermoplastic continental crosswalk markings, and upgrading pedestrian push buttons to Accessible Pedestrian Signal assemblies and LED countdown signal heads. The work must adhere to the 2022 City of Desert Hot Springs Standard Plans, 2024 Standard Specifications for Public Works Construction, and the latest Caltrans, Southern California Edison, and Mission Springs Water District standards. The contract will be awarded to a responsible contractor providing the lowest responsive bid. Bidders must be registered under Labor Code Section 1725.5, possess active contractor licenses, and provide full disclosure of any False Claims Act, labor law, or civil/criminal legal violations. Submissions are due by October 27, 2026, and must include a bid security of at least 10% of the total aggregate bid price. Once awarded, the project must be completed within 45 working days of the Notice to Proceed, with liquidated damages set at 2,800 dollars per working day for delays. Required bonding includes both a Faithful Performance Bond and a Payment Bond, each amounting to 100% of the total contract price, along with liability insurance naming the City of Desert Hot Springs and the County of Riverside as additional insureds.
City of Desert Hot Springs

POSTED

about 12 hours ago

DEADLINE

in 11 days
View Details

More opportunities from General Services Administration → Pbs Project Delivery Capital Construction - Branch Central

Same awarding agency

NAICS: 236220
New
Federal
FDA Lab Renovation in Silver Spring, MD
Solicitation # 47PJ0027CXXXX
The General Services Administration is conducting market research through a Sources Sought Notice for construction services to renovate the Federal Research Center of the FDA in Silver Spring, Maryland. This design-bid-build project involves the reconfiguration and update of 13 laboratories and equipment rooms on the first floor and 19 on the second floor of Building 64. Key technical requirements include the installation of a bulk nitrogen storage and distribution system with an external reinforced concrete pad. All work must adhere to GSA Public Buildings Service Core Buildings Standards and be executed within an occupied, fully functioning critical mission support laboratory, requiring the contractor to minimize disruptions to ongoing tests while maintaining strict safety and security controls. The estimated contract value is between 5 million and 10 million dollars, with an anticipated award date in Summer 2027 and an estimated performance duration of 18 months. Under NAICS code 236220, the GSA is seeking capability statements from interested firms, including those with small business, HUBZone, Women-Owned, or Service-Disabled Veteran-Owned designations. Qualified respondents must provide a five-page PDF capability statement by November 5, 2026, demonstrating experience with projects over 5 million dollars completed within the last five years and providing evidence of bonding capability up to 10 million dollars. Submissions should be directed to Contracting Officer Shane Fawcett.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS