Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Build for Vertical Conveyance Projects Phases 2 - 4

Closed
RFQ-280-3012902-JM (Step One of a Two-Step Procurement)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements involve reconfiguration, new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements including paving, drainage upgrades, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. The award will be based on the lowest price. Key administrative requirements include compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Invoicing is conducted monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30 and must be certified by a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 24 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, seeks Disadvantaged Business Enterprise (DBE) subcontractors under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach, including posting solicitations in an online publication for at least 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to include proof of these postings and agency utilization within the bid package will result in the proposal being deemed non-responsive. While most GFE documentation is due at the time of submission, outreach logs and documentation may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and abatement to specialized mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the full bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with the National Building Code, NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing if they are more stringent than federal requirements. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion, with work starting within 14 days of the Notice to Proceed. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with local wage rate decisions. The contract mandates Net 30 payment terms and requires a one-year workmanship guarantee.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for maintaining fire resistance and ensuring all mechanical, plumbing, electrical, and life-safety systems are tested and approved prior to final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100. Awarded contractors must provide payment and performance bonds for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. A minimum one-year workmanship warranty is required upon final acceptance.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves clearing, rock excavation, and grading, with specific requirements for wetland mitigation. Additionally, the project includes the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari for bid documents.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in about 17 hours

AI Contract Overview

Show more

John Wayne Airport (JWA), managed by the County of Orange, is a medium hub commercial airport serving as the main air gateway for Orange County, California. It operates three interconnected terminals—A, B, and C—totaling 22 gates and handling approximately 11.7 million passengers annually. Terminal C, opened in 2011, was added to increase capacity and support international flights with new gates and a federal inspection facility. The airport offers seamless passenger movement between terminals both landside and airside, complying with TSA security regulations including a 24-hour Airport Security Coordinator and strict enforcement of identification requirements. JWA is also governed by a Settlement Agreement that restricts noise and traffic, enforcing a nightly curfew and limiting passenger volume through a cap of 11.8 million annual passengers for larger aircraft through 2026 to reduce community impact. The contract solicitation titled "Design Build for Vertical Conveyance Projects Phases 2 - 4" is a step-one of a two-step procurement process issued by John Wayne Airport, with responses due by April 8, 2026. This project likely involves design and construction services related to vertical transportation systems, such as elevators or escalators, essential for passenger movement within the airport terminals. The solicitation is managed by the airport’s senior project manager and procurement administrator based in Santa Ana, California, highlighting the airport’s ongoing infrastructure improvements to maintain operational efficiency and passenger convenience in line with JWA’s capacity and security requirements.

General Info

John Wayne Airport seeks design-build services for vertical conveyance upgrades by April 2026.

Documents

5

JWA P466 Vertical Conveyance Phase 1A As-Built Shop Drawings

PDF, High priority: read this firstsow
High

P466 Vertical Conveyance Systems Improvements Phase I Criteria Documents

PDF, High priority: read this firstsow
High

Orange County District Attorney's Office Public Works Unit Certified Payroll and Labor Code Guidance

PDF, Low priority14 pages · other
Low

Design Build for Vertical Conveyance Projects Phases 2 - 4.pdf

PDF

Notice_of_Solicitation_RFQ-280-3012902-JM.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → John Wayne Airport
Contacts2 people available
OfficeSanta Ana, CA, 92701, USA
Office AddressSanta Ana, CA, 92701, USA
Contacts
Leo TangSenior Project Manager
Jennifer Masonprocurement administrator

Interested Companies (35)

EntramPORT CHARLOTTE, FL
SwinertonBellevue, WA
PGALHouston, TX

See All 35 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
John Wayne Airport ("JWA" or "Airport") owned and operated by the County of Orange, is classified as a medium hub in the Federal Aviation Administration's ("FAA") National Plan of Integrated Airport Systems (NPIAS). It is a primary commercial service airport that handles between 0.25% and 1.0% of total U.S. passenger boardings. Medium hubs are defined by the FAA as airports that account for at least 0.25% but less than 1.0% of total annual passenger boardings in the United States, placing JWA in the medium hub category. JWA serves as the primary commercial gateway to Orange County and features a unified passenger facility known as the Thomas F. Riley Terminal. The facility is divided into three distinct sections: Terminals A, B, and C. Terminals A and B were originally built and opened to the public in 1990. To accommodate growing passenger demand and international service, the airport expanded with the opening of Terminal C in 2011, which added six bridged aircraft gates and a new federal inspection facility. These three terminals collectively manage approximately 11.7 million annual passengers across 22 gates. The Airport features full interconnectivity between Terminals A, B, and C on both the landside and airside. Before passing through security, passengers can walk freely across the upper-level Departures area or lower-level Arrivals area to access ticketing, baggage claim, or ground transportation. Once through security, the "airside" concourse is completely seamless and sterile, allowing travelers to walk between all 22 gates without having to exit and re-enter a checkpoint. JWA operates in compliance with the Transportation Security Administration ("TSA") mandates outlined in the Code of Federal Regulations ("CFR") Title 49. Specifically, as a primary commercial service airport, JWA maintains a TSA-approved Airport Security Program ("ASP") as required by 49 CFR Part 1542, which governs the secure operation of the airfield, terminal areas, and the screening of persons and property. These regulations require the airport to designate a 24-hour Airport Security Coordinator ("ASC"), provide adequate law enforcement support for checkpoints, and strictly enforce identification standards, including the REAL ID requirements. JWA operates under a Settlement Agreement. The Settlement Agreement, established in a 1985 accord (amended in 2003 and 2014), enforces caps on noise and capacity. Under the current terms, which extend through 2035, JWA maintains a mandatory nighttime curfew prohibiting commercial departures between 10:00 p.m. and 7:00 a.m. (8:00 a.m. on Sundays) and arrivals between 11:00 p.m. and 7:00 a.m. Furthermore, the agreement mandates a "Million Annual Passenger ("MAP") Cap," which currently limits the airport to 11.8 million passengers per year through 2026 for the largest of aircraft ("Class A") to ensure long-term noise protection for the surrounding corridor communities.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS