Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Build for Vertical Conveyance Projects Phases 2 - 4

Closed
3132302-RB (Step One of a Two-Step Procurement)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333921
Federal
Sources Sought Notice for On-Site Elevator Maintenance Service for Wagner IHS Healthcare Center
Solicitation # IHS-WAG-27-1532090
The Indian Health Service is conducting market research via Sources Sought Notice IHS-WAG-27-1532090 to identify qualified small businesses and Indian Economic Enterprises for a non-personal, firm-fixed-price service contract. The objective is to secure on-site maintenance, inspection, and repair services for one direct plunger hydraulic elevator at the Wagner Health Center in Wagner, South Dakota. The scope of work includes routine servicing, annual inspections in accordance with ASME A17.2-2023, and ensuring the elevator's integration with fire detection and emergency power systems remains functional. The anticipated period of performance consists of a base year from January 1, 2027, to December 31, 2027, with four subsequent one-year option periods extending through December 31, 2031. The contract will be managed by a Level 1 Contracting Officer's Representative and a Facility Manager, with a strong emphasis on 100 percent compliance for safety-critical requirements and certifications. Contractors must adhere to NFPA 101 Life Safety Codes and maintain strict data privacy standards in compliance with HIPAA and the Privacy Act of 1974. Administrative requirements include monthly electronic invoicing via the Invoice Processing Platform per HHSAR 352.232-71 and the maintenance of detailed service logs. This notice is for planning purposes under NAICS code 333921 and does not constitute a formal solicitation; interested parties must submit their capabilities to the designated purchasing agent by October 31, 2026.
Great Plains Area Indian Health Svc

POSTED

12 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The County of Orange, through John Wayne Airport, has issued a solicitation for design-build services for the Vertical Conveyance Project Phases 2-4. This project involves the replacement of three remaining escalators and the modernization of 28 elevator units located throughout the airport terminals, parking garages, and ground transportation center. The primary objective is to improve safety, reliability, and service life, with a target service life of 15 to 20 years for the upgraded systems. The project is funded by FAA grants and carries an anticipated budget of $41,000,000, requiring bidders to demonstrate a bonding capacity of at least that amount. The procurement follows a two-step process, beginning with a Request for Qualifications (RFQ) to shortlist highly qualified respondents, who will then be invited to submit formal proposals via a Request for Proposals (RFP). The project schedule anticipates a Notice to Proceed in the first quarter of 2027, followed by approximately eight months of design and pre-construction services. Construction for Phase 2 is slated to begin in the fourth quarter of 2027, with a scheduled moratorium in mid-2028, and final substantial completion targeted for the third quarter of 2029. Compliance with various federal and state regulations is mandatory, including 2 CFR Part 200, 49 CFR Part 26 regarding Disadvantaged Business Enterprises, and the Build America, Buy America Act. Additionally, contractors must adhere to TSA-approved Airport Security Programs, California Building Standards Codes, and ADA accessibility requirements. Successful bidders must hold a Class B general contractor license with a Class C-11 subcontractor requirement and must comply with prevailing wage laws and Davis-Bacon requirements.

General Info

John Wayne Airport design-build project for elevator and escalator upgrades costing $41 million.

Documents

8

JWA P466 Vertical Conveyance Phase 1A As-Built Shop Drawings

PDF, High priority: read this firstsow
High

P466 Vertical Conveyance Systems Improvements Phase I Criteria Documents

PDF, High priority: read this firstsow
High

RFQ 280-3132302-RB Notice of Solicitation – Vertical Conveyance Project Phases 2-4

PDF, High priority: read this firstpresolicitation
High

RFQ 3132302-RB - Design Build for Vertical Conveyance Projects Phases 2-4

PDF, High priority: read this firstrfq
High

RFQ 3132302-RB Design Build for Vertical Conveyance Projects Phases 2-4

PDF, High priority: read this first36 pages · rfq
High

RFQ 3132302-RB: Design Build for Vertical Conveyance Projects Phases 2 - 4

PDF, High priority: read this first36 pages · rfq
High

Orange County District Attorney's Office Public Works Unit Certified Payroll and Labor Code Guidance

PDF, Low priority14 pages · other
Low

2026-03-23_JWA_Criteria_Documents_P491_Vertical_Conveyance_Systems_Improvement_Phases_2,_3,_and_4.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → John Wayne Airport
Contacts2 people available
OfficeSanta Ana, CA, 92701, USA
Office AddressSanta Ana, CA, 92701, USA
Contacts
Kevin ChenSenior Project Manager
Ranique BeasProcurement Contract Manager

Interested Companies (32)

EntramPORT CHARLOTTE, FL
SwinertonConcord, CA
Austin IndustriesDallas, TX

See All 32 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
John Wayne Airport ("JWA" or "Airport") owned and operated by the County of Orange, is classified as a medium hub in the Federal Aviation Administration's ("FAA") National Plan of Integrated Airport Systems (NPIAS). It is a primary commercial service airport that handles between 0.25% and 1.0% of total U.S. passenger boardings. Medium hubs are defined by the FAA as airports that account for at least 0.25% but less than 1.0% of total annual passenger boardings in the United States, placing JWA in the medium hub category. JWA serves as the primary commercial gateway to Orange County and features a unified passenger facility known as the Thomas F. Riley Terminal. The facility is divided into three distinct sections: Terminals A, B, and C. Terminals A and B were originally built and opened to the public in 1990. To accommodate growing passenger demand and international service, the airport expanded with the opening of Terminal C in 2011, which added six bridged aircraft gates and a new federal inspection facility. These three terminals collectively manage approximately 11.7 million annual passengers across 22 gates. The Airport features full interconnectivity between Terminals A, B, and C on both the landside and airside. Before passing through security, passengers can walk freely across the upper-level Departures area or lower-level Arrivals area to access ticketing, baggage claim, or ground transportation. Once through security, the "airside" concourse is completely seamless and sterile, allowing travelers to walk between all 22 gates without having to exit and re-enter a checkpoint. JWA operates in compliance with the Transportation Security Administration ("TSA") mandates outlined in the Code of Federal Regulations ("CFR") Title 49. Specifically, as a primary commercial service airport, JWA maintains a TSA-approved Airport Security Program ("ASP") as required by 49 CFR Part 1542, which governs the secure operation of the airfield, terminal areas, and the screening of persons and property. These regulations require the airport to designate a 24-hour Airport Security Coordinator ("ASC"), provide adequate law enforcement support for checkpoints, and strictly enforce identification standards, including the REAL ID requirements. JWA operates under a Settlement Agreement. The Settlement Agreement, established in a 1985 accord (amended in 2003 and 2014), enforces caps on noise and capacity. Under the current terms, which extend through 2035, JWA maintains a mandatory nighttime curfew prohibiting commercial departures between 10:00 p.m. and 7:00 a.m. (8:00 a.m. on Sundays) and arrivals between 11:00 p.m. and 7:00 a.m. Furthermore, the agreement mandates a "Million Annual Passenger ("MAP") Cap," which currently limits the airport to 11.8 million passengers per year through 2026 for the largest of aircraft ("Class A") to ensure long-term noise protection for the surrounding corridor communities.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS