Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on August 10, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build NM ERFO 207(1), Catwalk Trail

Awarded
DTFH68-15-R-00001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Bramble Park Trail
Solicitation # 273C909397
Solicitation 273C909397 is an invitation for bids issued by the City of Cincinnati Department of Parks for the construction of the Bramble Park Trail. The project involves creating an approximately 1,000-foot shared use path between Bramble Park and Settle Street in Madisonville. The scope of work includes installing an aggregate base and asphalt surface, constructing concrete landings at both ends, installing 100 linear feet of bikeway railing, and implementing stormwater improvements consisting of two yard drains and 100 linear feet of perforated pipe. Additional requirements include site preparation, the removal of five trees, and the planting of five replacement deciduous trees. All work must adhere to City of Cincinnati standards, ODOT Construction and Material Specifications, and regulations from the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works. Bids must be submitted electronically via the Vendor Self Service portal by October 28, 2026, at 12:00 p.m. EST. The submission must include completed forms as a single PDF and a detailed Excel bid form. The contract will be awarded to the lowest and best responsive bidder, with specific goals for Minority Business Enterprise (8%) and Women Business Enterprise (10%) participation. The project features a 60-day construction period divided into three phases. Contractors are required to provide bid, performance, and payment bonds, adhere to State of Ohio prevailing wage rates, and comply with OSHA safety standards. Special provisions are included for the immediate suspension of work upon the discovery of archaeological remains and strict adherence to non-discrimination and equal employment opportunity laws.
Department Of Parks

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Catwalk Trail Reconstruction project, managed by the Department of Transportation's Central Federal Lands Division, involves spot repairs and infrastructure replacement within the Gila National Forest in Catron County, New Mexico. This design-build initiative focuses on restoring hiking trails and replacing pedestrian bridge structures damaged during a 2013 flood. Key deliverables include 3,000 linear feet of trail restoration, 600 linear feet of a specialized suspended bridge structure along a cliff face, and the construction of two additional pedestrian bridges. The estimated project cost is between 1 million and 3 million dollars. Due to the challenging geography of a confined slot canyon and the threat of flash floods during the monsoon season, the project requires an accelerated construction timeline. Work within the canyon must be substantially complete by June 30 to avoid seasonal weather risks, leaving a narrow three-month construction window. The design-build procurement method was specifically chosen to address these extreme access constraints and the precise fitting requirements for the suspended bridge sections.

General Info

Contract Value

$4,617,780

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Gila National Forest Catron County, NM, 88061, USA

Set-Aside

NONE

Awardee

AUI INC.

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Joe WilsonContracting Specialist
Jeremiah B. RogersAcquisitions- Construction Procurement

Full Description

Show more
This is not a Request for Proposals (RFP). Project Plans and Specifications are not yet available. This Design-Build project will be tentatively advertised on October 1, 2014 on an unrestricted (full and open) basis. Official RFP documents will be available at that time. A government-led site visit will be announced with the RFP. The announcement will include the site visit date, time and location. The site visit will be non-mandatory but prospective proposers are strongly encouraged to attend. The Catwalk Trail Reconstruction project is located in Catron County, New Mexico, within the Gila National Forest. This project will provide spot repairs along two hiking trails, as well as replace pedestrian bridge structures damaged in a 2013 flood event. Design-build has been selected as the procurement method for this project due to the extreme access and weather conditions at the project site, accelerated construction timeline necessitated by the monsoon season and flash flood threat, and design and fitting requirements of major pedestrian structures. The major work elements include debris removal, trail restoration, construction of a suspended Catwalk Trail bridge section, and various pedestrian bridges. The majority of work will take place in a confined slot canyon with limited access to equipment and personnel. Construction within the canyon must be substantially complete before the monsoon season (June 30), only providing a construction weather window of approximately 3 months. The Catwalk Trail bridge section consists of a pedestrian bridge suspended or supported along the irregular cliff face of the slot canyon, requiring detailed measurements and shop drawings for a proper fit. The proposed project is for spot repairs and reconstruction at damaged sites, at an estimated cost between $1M and $3M. The primary scopes of work include debris removal, trail restoration, construction of Catwalk Trail bridge structure and overlooks, and construction of various pedestrian bridges. Significant quantities include: Trail Restoraiton 3000 LNFT Catwalk Bridge Trail Structure 600 LNFT Pedestrian Bridges 3 EACH

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS