Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 7, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build, Repair 3rd Floor Bldg 9225, JIEDDO

Awarded
FA3047-12-B-0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Solicitation # W912PM279A001
The U.S. Army Corps of Engineers is issuing a draft program solicitation for the renovation of Hangar 750 at Pope Army Airfield, Fort Bragg, North Carolina. This project supports an Air Force Special Operations Command squadron mission and involves the comprehensive architectural and MEP build-out of ground floor aircraft maintenance bays, the integration of exterior hangar doors, and the construction of second-floor administrative and high-security operational spaces. The scope includes the installation of Level 2 wet-pipe fire suppression, intrusion detection systems, electronic access control, and full furniture, fixtures, and equipment packages. This procurement is conducted as an Other Transaction Agreement under 10 USC 2808a, meaning it is not subject to the Federal Acquisition Regulation. The project follows a Progressive Design-Build approach divided into two stages: Phase 1 focuses on design and pre-construction services, while Phase 2 covers final design and construction via a Fixed Price model based on a negotiated Guaranteed Maximum Price. The government has established an affordability cap of 35 million dollars as a material requirement, and the selected firm must be capable of providing performance and payment bonds of at least 35 million dollars. Selection is based on a qualifications-based methodology involving a two-step process: an initial evaluation of White Papers followed by Pitch Presentations for a target of three highly qualified teams. All team members must be registered in the System for Award Management with a valid Unique Entity Identifier. Additionally, the successful Design-Builder must comply with Cybersecurity Maturity Model Certification (CMMC) requirements as codified in 32 CFR Part 170, including a positive self-assessment and signed attestation of security controls. Submissions must be made through the PIEE Solicitation Module.
W074 Endist Wilmington

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
Source Sought 36C25627Q0020_564-610 NIPMHB Nurses Call, Boilers, and Rigid Vinyl Sheet
Solicitation # 36C25627Q0020
The Department of Veterans Affairs, through Network Contract Office 16, is conducting market research via a Request for Information to identify qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB) for a construction project at the Veterans Health Care System of the Ozarks in Fayetteville, Arkansas. The project, identified as Project 564-610, involves repairs and installations at the New Inpatient Mental Health Building (Building 49). The scope of work includes the installation of two electric backup boilers with associated piping, pumps, and electrical work, the application of Inpro Palladium Rigid Vinyl Sheet, and the installation of 3/8 inch interior tempered safety glazing for nurse station partitions. The government anticipates awarding a single, firm-fixed-price contract with an estimated magnitude between 250,000 and 500,000 dollars. The period of performance is 210 calendar days from the Notice to Proceed. All work must be performed without disrupting medical center operations and must adhere to the latest NEC, NFPA, and OSHA standards, including the development of an Infection Control Risk Assessment. Personnel are required to have a negative TB test within 90 days of starting work and a minimum OSHA 10 certification. Interested firms under NAICS code 236220 must provide a capability statement, proof of ability to obtain performance and payment bonds up to 500,000 dollars, and details of three relevant recent projects. Responses must be submitted to the Contracting Officer by November 3, 2026.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation FA3047-12-B-0010 is a design-build contract for the repair and renovation of the third floor of Building 9225 (JIEDDO) at Lackland Air Force Base in San Antonio, Texas. This project is set aside for Service Disabled Veteran Owned Small Businesses under NAICS code 236220. The scope of work involves a comprehensive design-build effort including design analysis with 60 percent, 100 percent, and as-built submittals, demolition, and the construction of offices, hallways, and restrooms. Key technical requirements include HVAC upgrades, electrical and communication line drops, and the installation of secure doors to meet EMSEC requirements for SIPRNET. The contract utilizes a firm-fixed-price structure with a performance period of 110 calendar days. The procurement process included multiple amendments to the Statement of Work and bid deadlines, with the final award based on the lowest bidder following a responsibility verification. Bidders were required to acknowledge three amendments and follow strict base access protocols for the bid opening at the 802D Contracting Squadron. Extensive bidder Q&A sessions clarified specifications regarding lighting fixtures, ceiling grids, painting, and ADA compliance for prefabricated showers. Additionally, environmental survey reports were provided to identify asbestos, lead-based paint, mold, and PCBs on the second and third floors to support renovation activities.

General Info

Contract Value

$693,849.21

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Lackland AFB, Bldg 9225, SAN ANTONIO, TX, 78205, USA

Set-Aside

NONE

Award Issued Date

Documents

43

12-B-0010-0002 IFB Amendment

DOC, High priority: read this first3 pages · amendment
High

Amendment 0001 to Solicitation FA3047-12-B-0010

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation FA3047-12-B-0010

PDF, High priority: read this firstamendment
High

FA3047-12-B-0010 Amendment 0001 Section B

PDF, High priority: read this firstamendment
High

FA3047-12-B-0010 Amendment 0002 Section B

DOC, High priority: read this first1 page · amendment
High

FA3047-12-B-0010 Atch 1 - SOW Repair/Renovate 3rd Floor Bldg 9225, JIEDDO

DOC, High priority: read this first33 pages · sow
High

FA3047-12-B-0010 Revised SOW - Repair/Renovate Bldg 9225 JIEDDO

PDF, High priority: read this firstsow
High

Solicitation FA3047-12-B-0010: Design-Build, Repair 3rd Floor Bldg 9225 (JIEDDO)

PDF, High priority: read this firstifb
High

Building 9225 Asbestos, LBP, Mold, and PCB Survey Report

PDF, Low priorityspecifications
Low

FA3047-12-B-0010 Bidder Q&A

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (12 Aug 12)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Question #36)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Questions 12-16)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q & A (Questions 18-20)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Questions 2-4)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Questions 26-32)

DOC, Low priority2 pages · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Questions 34-35)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Bidder Q&A (Questions 5-10)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Question 11 Response

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Question 37 Response

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Questions & Answers (#1)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Questions & Answers (Aug 10, 2012)

DOC, Low priority1 page · q-and-a
Low

FA3047-12-B-0010 Questions & Answers (Aug 12)

DOC, Low priority2 pages · q-and-a
Low

FA3047-12-B-0010 Site Visit Meeting Minutes - Bldg 9225

PDF, Low prioritysite-visit-minutes
Low

Guidance on SDVOSB Joint Venture Bid Guarantees

DOC, Low priority1 page · special-notice
Low

Lackland AFB Map

PPTX, Low priority1 page · other
Low

Pre-Bid Site Visit Attendance Record - 12-B-0010

PDF, Low priorityspecial-notice
Low

12-B-0010+Appendix+C+%281+of+2%29.zip

ZIP

12-B-0010+Appendix+C+%282+of+2%29.zip

ZIP

12-B-0010-Appendix+D+%282+of+4%29.zip

ZIP

12-B-0010-Appendix+D+%283+of+4%29.zip

ZIP

12-B-0010+-+Appendix+D+%284+of+4%29.zip

ZIP

12-B-0010+-+Bldg+Drawings.zip

ZIP

Appendix+F+-+3rd+Floor+Layout+%2821+Aug+12%29.ppt

PPT

Appendix+F+-+3rd+Floor+Layout.ppt

PPT

Appendix+I+-+As+Built+Set+1.zip

ZIP

Appendix+I+-+As+Built+Set+2.zip

ZIP

Appendix+I+-+As+Built+Set+3.zip

ZIP

Appendix+I+-+As+Built+Set+4.zip

ZIP

FA3047-12-B-0010-+Appendix+D+%281+of+4%29.zip

ZIP

FA3047-12-B-0010-+Atch+1+-+Appendix+F+-+3rd+Floor+Layout.ppt

PPT

FA3047-12-B-0010-+Atch+1+-+Appendix+F+-+3rd+Floor+Layout.ppt

PPT

FA3047-12-B-0010.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

29 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Set-aside changed from HUBZone Set Aside to Service-Disabled Veteran-Owned Small Business Set Aside. The notice description changed.

Notice updated

Response deadline changed from Aug 24, 2012 to Aug 15, 2012. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 15, 2012 to Aug 27, 2012.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 27, 2012 to Aug 15, 2012.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Ryan D. BuenoContract Specialist
Jackie L. MurrayTeam Lead/Contracting Officer

Full Description

Show more
BID OPENING TIME IS SET FOR 1:00 p.m CST LOCATION: 802D Contracting Squadron 1655 Selfridge Ave, Bldge 5450 (Legacy Conference Room) Lackland AFB, TX 78236 Please ensure all thre (3) amendments are acknowledged. Arrive early to ensure your package is received on time. ****Please be advised***** Team Lackland has put the final touches on the Truemper Road project and everything is according to plan. Airmen's gate will completely close from 18-22 Aug 12. 1. Airmen's Gate Visitor Reception Center (VRC) will be closed for the duration of the parking lot paving part (18 Aug - est. 15 Oct). 2. Gate #3 (Luke - West) will have extended hours, 24/7 hrs. 3. Gate #4 (Selfridge - West) will have extended hours, 0500-2200. 4. SAPD/Bexar County will be outside the gates watching for illegal (right) turns from the center lanes into the base. Tickets will be issued. Read Below for procedures on how to acquirebase access: Send your pass request in the format below to all of the following email addresses to ensure your request is submitted to the visitor center: 802cons.lgcab@us.af.mil; ryan.bueno.1@us.af.mil; basilio.solis@us.af.mil; son.nguyen.13@us.af.mil; jackie.murray@us.af.mil; robert.delarosa.1@us.af.mil; jorge.canavati@us.af.mil; christina.warner@us.af.mil; elmer.howard@us.af.mil Ensure you allow enough time to prior to the bid openeing to access your pass through the visitor center located on E. Luke Blvd off of Military Drive. Strictly follow the format below to mitigate any issues from receiving the base pass. Subject: FUOU - (Company Name) Pass Requests- FA3047-12-B-0010, Design-Build, Repair 3rd Floor Bldg 9225, JIEDDO-(MPLS 11-0114) This e-mail contains For Official Use Only (FUOU) information which must be protected under The Privacy Act and AFI 33-332. NAME: Smith, John A. DOB: 11/02/19XX ID #/ STATE ISSUED: 09298XXX, TX PASS DATE(S): 07/27/12 Thru 07/27/12 TIMES: 0630-1400 (Mon-Fri) COMPANY: Company Name Purpose: Lackland AFB, TX - Security Hill SOLICITATION NO: FA3047-12-B-0010

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS