This Solicitation opportunity from Department Of Defense was posted on September 30, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build, Repair (Remediate) Airfield Obstructions

Closed
FA3047-09-B-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals from licensed general contractors to establish a Master Services Contract for on-call maintenance and minor construction services in California. This is a small business set-aside solicitation, including SDB, WOSB, HUBZone, and VOSB designations, under NAICS code 238990. The scope of work involves providing qualified personnel and equipment for tasks that may require short-notice response, including millwright and welding activities, fire sprinkler system maintenance, general construction such as framing and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. Work will be assigned via time-and-materials Task Orders, and the Authority intends to award multiple contracts based on the best interests of the agency. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. Evaluation criteria include price and payment terms, the nature of any exceptions taken to the RFP, organizational experience, personnel qualifications, and the quality of the proposed work plan. This is a prevailing wage contract subject to California Labor Code Section 1770, requiring contractors to be registered with the Department of Industrial Relations. Key contractual requirements include the provision of performance and payment bonds for any Task Order exceeding 25,000 dollars and strict adherence to OSHA safety standards. Payments are generally made within 30 days of invoice approval, though expedited payment options are available in exchange for a percentage discount.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 8 days

General Info

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

Lackland AFB-Runway, SAN ANTONIO, TX, 78236, USA

Set-Aside

HZC

Documents

14

Airfield_contours.pdf

PDF

Airfield_Obstruction_Map_Paul.jpg

JPG

amendment+0001+document.pdf

PDF

Attachment+3.pdf

PDF

FA3047-09-B-0002-0002.pdf

PDF

FA3047-09-B-0002-0002.pdf

PDF

FA3047-09-B-0002+Attachment+1.pdf

PDF

FA3047-09-B-0002+Attachment+2.pdf

PDF

FA3047-09-B-0002+IFB.pdf

PDF

FA3047-09-B-0002+Site+Visit+Attendance+Sheet+%2826+Jul+09%29.rtf.pdf

PDF

North_Runway.jpg

JPG

Revised+Bid+Schedule.pdf

PDF

Revised+SOW+0001.pdf

PDF

South_Runway.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

19 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline added: Sep 15, 2009. The notice description changed.

Notice updated

Response deadline time changed from 5:00 PM UTC to 4:00 PM UTC on Sep 15, 2009. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 15, 2009 to Sep 21, 2009. The notice description changed.

Notice updated

Response deadline changed from Sep 21, 2009 to Sep 15, 2009. The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Sep 15, 2009 to Sep 21, 2009.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Jackie L. MurrayTeam Lead/Contracting Officer

Full Description

Show more
The following 4 questions have been received (14-17 Sep 09) and have been responded to by the Government: Question 40: Upon reviewing the revised scope and revised bid schedule for the above referenced project, I have noticed some inconsistencies. Please note: a. CLIN 0005 NORTH MAIN GLIDE SLOPE VAULT: Schedule is requiring the pricing for the vault. The revised SOW per Amendment 1, 1.4 calls for the deletion of the vault. Government Response: The price being requested is for the relocation of the transformer located behind the structure. b. CLIN 0003 NORTH & SOUTH INSTRUMENT LANDING FFP: The schedule is requesting to move both North and South ILS's and include new pads. The revised SOW per Amendment 1, 2.1., deletes the design and installation of the pads. Government Response: The proceeding paragraphs for 0001, paragraph 2.1., have been given, so that the contractor has more information on what is required for these portion of the work. Both the installation of the pads and design will be required. Question 41: Also it appears the CLIN 4, 6, and 7 have been deleted. Government Response: You are correct, CLINS 0004, 0006 and 0007 have been deleted (IAW Amendment 0001). Question 42: Amendment 3 still has amendment 002 issued on 1442. Government Response: There are only two Amendments: Amendment 0001 - Issued on 10 Sep 09, and Amendment 0002 issued on 11 Sep 09. There is no Amendment 0003 - What is on FedBizOpps is an error; we attached the wrong Amendment 0002 (SF 30 document). When we reattached the correct one, it caused the system to create Amendment 0003. Question 43: CLIN 0005: Please provide additional clarification for work involving the North Main Glide Slope Vault & Transformer: a. Is it the intent of the revised statement of work that the existing structure with all electrical components inside (i.e. emergency generator, auto transfer switch, panelboards, disconnects, etc...) remain in place? Government Response: Yes, all the electrical components will remain. b. Is the small medium voltage transformer located on the South side of the existing structure the only piece of equipment to be relocated? Government Response: Yes, the transformer on the south side of the structure is the only peace to be relocated. c. Is the contractor to relocate the transformer to the previously designated Upson Park area or any area outside of the object free zone? Government Response: An area outside of the free zone, and inside the fence line. d. The revised SOW instructs the contractor to connect the relocated transformer back to the main glide slope. Is it the owners' intent that the contractor tie this transformer back into the existing North Main Glide Slope Vault or the actual Glide Slope Antenna Shelter adjacent to the runway? Government Response: The transformer is to be reconnected back to the north main glide slope vault. PLEASE NOTE (17 Sep 09): No further questions will be accepted. Bid Opening is scheduled for 21 Sep 09 at 1:00pm (CST - Local Time). It is open up to the Public. Please Call Ms. Belinda Gallo at (210) 671-5144, 5145, 1728 or 1726 to get access to the installation (Airman's Gate - Valley High Road/Exit 4 (HI 410). Please do not wait for the last minute to get called in. REMINDERS: Amendments 0001 & 0002 must be acknowledged to be consider responsived. A original Bid Bond in the amount of 20% of the Bid must be with your Bid Package to be responsived. Please make sure to complete IFB requirements, fill-ins, Bid Schedule, etc. (end)

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS