Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on August 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Services for New Outdoor Amenities and Site Improvements at Agriculture & Conference Center

Closed
454-RFQ-DB-08272026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing comprehensive design-build services to expand and enhance the Chatham County Agriculture & Conference Center through outdoor amenities and site improvements. The project scope includes constructing or covering a primary arena with seating, barns, restrooms, concessions, and an announcer’s stand, along with an outdoor multi-use pavilion featuring solarization and optional RV hookups. Two options are to be explored: either retrofitting the existing arena or building a new covered arena adjacent to the current facility. The design process emphasizes stakeholder collaboration, improved site access, parking, and event flow, with the contractor responsible for timely completion with minimal operational disruption. The contract, valued between five and fifteen million dollars, is overseen by County staff, including the Conference Center and Facilities Directors, and is governed by North Carolina statutes, County Terms and Conditions, and standard contractual provisions. The procurement process is based on a Request for Qualifications (RFQ) with evaluation criteria focusing on the experience and qualifications of the design-build team, references, project schedule, minority business participation efforts, and conflict of interest disclosures. The County aims to select the most responsible and responsive firm through interviews and negotiations, emphasizing minority outreach and good faith efforts. The contract emphasizes compliance with state and federal laws, including debarment and public records statutes, and incorporates detailed requirements for project management, documentation, and closeout procedures. Payment terms specify submission of proper invoices and documentation, with a focus on transparency and accountability, but do not specify federal systems or detailed line-item costs, as these will be defined in a future scope of work appendix. The project schedule anticipates initial design and procurement activities beginning in late 2025, with construction starting by September 2025, at the County’s site in Pittsboro, North Carolina.

General Info

Agency

North Carolina → County of Chatham

Place of Performance

NC, USA

Set-Aside

NONE

Documents

1

RFQ: Design-Build Contractor for CCACC Outdoor Amenities

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → County of Chatham
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Carolina → County of Chatham
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Chatham County is requesting services from a firm with experience in Design-Build and similar type facilities to form a team to work with agriculture-related stakeholders and the County. Conference Center staff will be the lead agency for the County for this project with the assistance of the Facilities & Construction Director and the Manager’s Office. Primary additional structures include a covered arena with seating, barns/stalls, restroom facilities, concessions, office/announcers stand, outdoor multi-use pavilion (educational use, farmer’s market capacity, outdoor event space) with solarization and optional RV hookups. Chatham County requests two options be explored with regard to the covered arena: Option A Covering the existing arena and adding additional seating, barns/stalls, restroom facilities, concessions and an office/announcer stand. Option B Construct a new, covered arena adjacent to the existing arena with additional seating, barns/stalls, restroom facilities, concessions and an office/announcer stand.
In addition to the additional structures, the expanded site design will need to include better access, parking and flow for events based upon the needs identified with the guidance of Conference Center staff. Upon completion of the design process, the construction firm will be expected to complete the construction phase in a timely manner with minimal interruption to what will be a continually operating facility.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS