Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Drainage Structure Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of FY27-ENGCP-005-5.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mill Creek Parking Lot FDR Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Bulloch County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs demolition of existing drainage and installation of new drainage structures for prime contractors on Bulloch County infrastructure projects. Replaces drainage to grade and installs stormwater improvement structures using excavation equipment, drainage pipes, and catch basins. Adheres to local county and state stormwater management standards. Delivers a functioning drainage system graded to specification.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → Bulloch County Board of Commissioners

Same awarding agency

New
SLED
Mill Creek Parking Lot FDR Project
Solicitation # FY27-ENGCP-005-5
The Bulloch County Board of Commissioners is soliciting sealed bids for the Mill Creek Parking Lot FDR Project (FY27-ENGCP-005-5), located at Mill Creek Regional Park along State Route 24 in Georgia. The scope of work involves infrastructure improvements including full depth asphalt reclamation, soil-cement base stabilization, subgrade preparation, grading, storm drainage installation, hot mix asphalt overlay paving, and site restoration. All work must adhere to the 2021 GDOT Standard Specifications for Construction, and bidders must provide evidence of current active approval as a GDOT Prequalified Contractor by the submission deadline of November 20, 2026, at 11:00 AM EST. The project requires substantial completion by March 31, 2027, and final acceptance by April 20, 2027, with liquidated damages of $150.00 per calendar day for failure to meet these milestones. Bidders must submit a bid bond for 5% of the total bid, and the successful contractor must provide performance and payment bonds of at least 100% of the contract price. Payment is structured as monthly progress payments with a 10% retainage, due within 15 days of invoice receipt. Quality assurance and material testing must be conducted by a GDOT prequalified consultant in Area Classes 6.04(a) and 6.04(b). Bids will be evaluated based on conformity with specifications, and the final selection will be approved by the Board of Commissioners.

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS