This Solicitation opportunity from Georgia was posted on January 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Services for Wastewater Treatment Facility Improvements

Closed
2024-100State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational system, including mechanical and electrical components such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on compliance with prescribed requirements, bidder qualifications, and financial ability. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard forms and requires the contractor to provide performance and payment bonds equal to the contract price, as well as insurance from companies with an A.M. Best rating of A-VII or better. Performance is monitored by Willis Engineers, and substantial completion is determined upon the Engineer's verification that the work can be utilized for its intended purpose. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 1 day
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project adheres to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with all new sidewalks and ramps required to meet current ADA standards. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, the provision of performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and EEO regulations. Subcontracts exceeding 10,000 dollars must include anti-discrimination and forced labor prohibition provisions.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Peachtree City Water and Sewerage Authority is seeking proposals from qualified design-build teams to enhance its wastewater treatment facilities through a series of upgrades. The project involves installing a new ultraviolet (UV) disinfection system at both the Rockaway Water Pollution Control Plant (WPCP) and Line Creek Wastewater Reclamation Facility (WRF), constructing an additional secondary filtration system at Rockaway WPCP, and installing a new headworks bar screen at Line Creek WRF. The equipment for these improvements has been pre-selected by the Authority, and the scope of services includes both pre-construction planning and full construction execution. The solicitation, identified by the number PE-33879, was posted on January 12, 2024, with a deadline for responses set for March 14, 2024. The project falls under NAICS code 237110 and is managed by the Peachtree City Water and Sewerage Authority in Georgia. Interested firms can contact Davis Ozier via email or phone for further details. The project aims to modernize and improve the efficiency of the wastewater treatment infrastructure, ensuring compliance with regulatory standards and enhancing operational capacity.

Documents

1
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 33879 PEACHTREE PE-33879-NONST-2024-000000001 to PE-33879-NONST-2024-000000001.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Peachtree City Water And Sewerage Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
Peachtree City Water and Sewerage Authority is accepting proposals for design-build services for wastewater treatment facility improvements. The project generally consists of the following improvements: installation of a new UV disinfection system at the Owner's two wastewater treatment facilities, Rockaway WPCP and Line Creek WRF; design and construction of an additional secondary filtration system at Rockaway WPCP; and installation of a new headworks bar screen at Line Creek WRF. Equipment has been pre-selected by the Owner. Design-build services will include both pre-construction and construction services.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS