This Solicitation opportunity from Department Of Energy was posted on November 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Design-Build Services – STM Security Fencing - North Boundary
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The National Laboratory of the Rockies is soliciting design-build services for the installation of new perimeter fencing along the North boundary of the South Table Mountain Campus in Golden, Colorado. This small business set-aside project, categorized under NAICS 238990, involves the design and installation of new fencing and the removal of designated existing chain-link sections. The scope requires the subcontractor to provide a complete design process including 50 percent, 90 percent, and 100 percent Issued-for-Construction packages, while utilizing Procore for all project documentation. Construction activities must adhere to strict safety, security, and environmental guidelines, including utility locates, erosion control, and coordination with the State Historic Preservation Office. This is a firm-fixed-price subcontract with an anticipated period of performance of 360 days. Award will be determined using the Lowest Price Technically Acceptable selection method, evaluating offers based on technical capability, personnel qualifications, and the ability to meet the performance schedule. The project is subject to the Davis-Bacon Act for wage requirements and the Buy American Act for construction materials. Final deliverables include as-built documentation, testing records, and turnover materials to support the Beneficial Occupancy process. Proposals must be submitted electronically via the NLR Document Collection portal, consisting of separate technical and business volumes.
General Info
Place of Performance
Set-Aside
Documents
6AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 8 days
- EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Notice details unchanged. Attachments may have changed.
Notice details unchanged. Attachments may have changed.
Notice details unchanged. Attachments may have changed.
The point of contact changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.
Project Overview
The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.
Design‑Build Requirements
The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.
Construction Requirements
All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.
Management, Coordination, and Quality Assurance
The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
More opportunities from Department Of Energy → Llc - DOE Contractor Alliance For Energy Innovation
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
