Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Of The Sewc Recycled Water Pipeline Replacement Project

Closed
20260723058State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract seeks professional engineering and design services for the replacement of up to 1,100 linear feet of aging 12-inch ductile iron recycled water pipeline at the San Elijo Water Campus in Encinitas, California. The existing pipeline, which has suffered multiple corrosion-related leaks over its 25-year service life, will be replaced with more durable PVC C900 material to enhance long-term reliability. In addition to the pipeline replacement, the project requires design work to reconfigure and automate the filtered water diversion valve system, improving accessibility and operational efficiency. The consultant will be responsible for comprehensive pre-design investigations, development of final design documents including plans and specifications in CSI format, preparation of cost estimates, and full bid-phase support. All deliverables must be submitted in electronically bookmarked PDF form following San Elijo Joint Powers Authority standards, with progress marked by 50%, 90%, and 100% design submissions. A temporary bypass system must be designed to ensure uninterrupted plant operations during construction, and all work must comply with California labor laws including prevailing wage and apprenticeship requirements. The procurement is structured as a fixed-price professional services agreement with no specified contract value, evaluated through a trade-off process prioritizing technical merit over cost alone. Proposals are assessed based on the project team’s experience and time commitments, the firm’s relevant technical background and geographic proximity, the creativity and efficiency of the proposed approach, and overall firm qualifications including prior experience with SEJPA. Submission is restricted to a fifteen-page technical proposal, limited to two pages for resumes and a cover letter, and must be uploaded electronically through the PlanetBids portal by August 20, 2026. The contract imposes strict requirements for key personnel approval, subconsultant oversight, conflict of interest disclosure, comprehensive insurance coverage including pollution legal liability and extended reporting periods, and audit compliance for public funds. Performance will occur entirely at the San Elijo Water Campus in Encinitas with SEJPA retaining oversight authority, and invoice submissions must be made monthly via email using a narrative description of completed work. No federal FAR clauses apply, as this is a state-level public agency procurement governed by locally drafted contractual terms.

General Info

Replace 1,100 ft of aging recycled water pipeline with PVC C900 and upgrade valve system for automation and reliability.

Place of Performance

Encinitas, CA, 92007, USA

Set-Aside

NONE

Documents

5

Attachment 1 - Professional Services Agreement for RW Pipeline Replacement

PDF, High priority: read this firstcontract-document
High

Attachment 2_RW Pipeline Replacement RFP - Scope of Services

PDF, High priority: read this firstrfp
High

Attachment 3_RW Pipeline Replacement RFP

PDF, High priority: read this firstrfp
High

Attachment 4_RW Pipeline Replacement RFP - Demolition and Construction Notes

PDF, High priority: read this firstrfp
High

RFP - Design of the SEWC Recycled Water Pipeline Replacement Project

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Elijo Joint Powers Authority
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Michael T. ThorntonP.E., General Manager

Full Description

Show more
Bid #13063: The project requires professional engineering and design services for the replacement of up to 1,100 linear feet of 12-inch pressurized ductile iron recycled water pipeline at the San Elijo Water Campus. The existing 25-year-old pipe has experienced multiple corrosion-related leaks. The scope includes replacing the leaking pipe with a more corrosion-resistant material, such as PVC C900. A secondary objective is to design the replacement and re-configuration of the filtered water diversion valve and associated piping to improve accessibility and automate the diversion of off-spec filtered water. The consultant will be responsible for pre-design investigations, final design documents (plans, specifications, cost estimates), and bid phase services.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS