Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Design Of The Sewc Recycled Water Pipeline Replacement Project

Active
20260723058State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract seeks professional engineering and design services for the replacement of up to 1,100 linear feet of aging 12-inch ductile iron recycled water pipeline at the San Elijo Water Campus in Encinitas, California. The existing pipeline, which has suffered multiple corrosion-related leaks over its 25-year service life, will be replaced with more durable PVC C900 material to enhance long-term reliability. In addition to the pipeline replacement, the project requires design work to reconfigure and automate the filtered water diversion valve system, improving accessibility and operational efficiency. The consultant will be responsible for comprehensive pre-design investigations, development of final design documents including plans and specifications in CSI format, preparation of cost estimates, and full bid-phase support. All deliverables must be submitted in electronically bookmarked PDF form following San Elijo Joint Powers Authority standards, with progress marked by 50%, 90%, and 100% design submissions. A temporary bypass system must be designed to ensure uninterrupted plant operations during construction, and all work must comply with California labor laws including prevailing wage and apprenticeship requirements. The procurement is structured as a fixed-price professional services agreement with no specified contract value, evaluated through a trade-off process prioritizing technical merit over cost alone. Proposals are assessed based on the project team’s experience and time commitments, the firm’s relevant technical background and geographic proximity, the creativity and efficiency of the proposed approach, and overall firm qualifications including prior experience with SEJPA. Submission is restricted to a fifteen-page technical proposal, limited to two pages for resumes and a cover letter, and must be uploaded electronically through the PlanetBids portal by August 20, 2026. The contract imposes strict requirements for key personnel approval, subconsultant oversight, conflict of interest disclosure, comprehensive insurance coverage including pollution legal liability and extended reporting periods, and audit compliance for public funds. Performance will occur entirely at the San Elijo Water Campus in Encinitas with SEJPA retaining oversight authority, and invoice submissions must be made monthly via email using a narrative description of completed work. No federal FAR clauses apply, as this is a state-level public agency procurement governed by locally drafted contractual terms.

General Info

Replace 1,100 ft of aging recycled water pipeline with PVC C900 and upgrade valve system for automation and reliability.

Agency

California → San Elijo Joint Powers AuthorityView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Encinitas, CA, 92007, USA

Set-Aside

NONE

Documents

(5)

Attachment 4_RW Pipeline Replacement RFP - Demolition and Construction Notes

PDFrfp

Attachment 2_RW Pipeline Replacement RFP - Scope of Services

PDFrfp

RFP - Design of the SEWC Recycled Water Pipeline Replacement Project

PDFrfp

Attachment 1 - Professional Services Agreement for RW Pipeline Replacement

PDFcontract-document

Attachment 3_RW Pipeline Replacement RFP

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Elijo Joint Powers Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Elijo Joint Powers Authority
View Agency Profile
Office AddressN/A
Contacts
Michael T. ThorntonP.E., General Manager

Full Description

Show more
Bid #13063: The project requires professional engineering and design services for the replacement of up to 1,100 linear feet of 12-inch pressurized ductile iron recycled water pipeline at the San Elijo Water Campus. The existing 25-year-old pipe has experienced multiple corrosion-related leaks. The scope includes replacing the leaking pipe with a more corrosion-resistant material, such as PVC C900. A secondary objective is to design the replacement and re-configuration of the filtered water diversion valve and associated piping to improve accessibility and automate the diversion of off-spec filtered water. The consultant will be responsible for pre-design investigations, final design documents (plans, specifications, cost estimates), and bid phase services.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details