Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Services for City of Santa Barbara Fleet Yard EV Charger Installation

Closed
RFP No. 6157State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 11 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Santa Barbara is seeking a qualified Design Professional to provide comprehensive design services, permitting, and construction administration for a project focused on installing electric vehicle (EV) charging infrastructure at the City’s Fleet Yard. The scope includes designing the electrical and civil components necessary to support the installation of six direct current fast chargers (DCFC) and fifty Level-2 chargers, along with the infrastructure to accommodate an additional 71 Level-2 chargers and 10 more DCFC units in the future. The project requires close collaboration with City staff and Southern California Edison (SCE) CRT staff to ensure compliance with program requirements outlined in the respective appendices. A critical aspect of the design involves effective space planning within a constrained site that hosts multiple City functions, with particular attention to protecting assets from floodwater damage, as most of the parcel lies within a FEMA floodplain. The solicitation, identified as RFP No. 6157, was posted on April 21, 2025, with a response deadline of May 12, 2025. The contract size is estimated between $500,000 and $1,500,000, and the project falls under NAICS code 541330, which pertains to engineering services. The project is managed by the City of Santa Barbara, California, with primary contact being Marisela Hart. Interested firms can find additional details and submit responses through the designated portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City is currently looking for a Design Professional to fulfill the following portion of this project: Design Services, Permitting & Construction AdministrationThis Design Team will work closely with City Staff and SCE CRT staff to design the electrical and supporting civil design of the site to deliver EV charging solutions as outlined in Appendix C&D, and adhering to all requirements of the SCE CRT program as outlined in Appendix E. This will including the design of adding 6 DCFC ports and 50 Level-2 EV chargers ports, with make-ready infrastructure to support future installation of roughly 71 additional Level-2 chargers and 10 additional DCFCs. The site encompasses several City work groups and functions with nominal free area, as such effective space planning and will be key to project success. The majority of the parcel is located in a FEMA floodplain, and a key aspect of the design will be to protect the City’s assets from floodwater damage.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS