Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from South Carolina was posted on August 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Services for East Dorchester Blvd. Bridge Replacement

Closed
RFP #26025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves providing comprehensive design services for the replacement of the existing East Dorchester Blvd. bridge in Greenville, South Carolina. The current structure is a concrete, two-lane bridge measuring approximately 75 feet in length and 38.5 feet in width, supported by timber piles and cross-bracing, and is subject to weight restrictions. The new bridge is expected to be similar in size to the existing one. The scope of work includes all necessary activities such as surveying, geotechnical investigations, design development, permitting, utility coordination, preparation of bid documents, and construction engineering inspection to ensure a complete and compliant replacement process. The project is solicited under RFP #26025, with proposals due by September 19, 2025. The contract value is estimated between $500,000 and $2,000,000. The Greenville County Engineering & Maintenance Division, part of South Carolina's SLED organization, is overseeing the project, with Anthony Dawson serving as the primary contact. The contract emphasizes a thorough approach to bridge replacement, ensuring safety, durability, and minimal disruption during construction. Interested consultants can find additional details and submit proposals through the designated procurement portal.

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville County Engineering & Maintenance Division
Contacts1 person available
OfficeN/A

Full Description

Show more
We are requesting proposals from qualified engineering consultants to provide design services for replacement of the existing East Dorchester Blvd. bridge between Bruce Road and Pine Creek Drive in Greenville. The bridge spans a tributary of Brushy Creek near its discharge into Brushy Creek immediately downstream of where Brushy Creek goes under I-85. The existing bridge is a concrete, 75'L x 38.5'W two lane bridge on timber piles with timber cross-bracing. The bridge is weight restricted.The new bridge is anticipated to be similar in size to the existing structure. The scope of work will consist of all surveying, geotechnical, design, permitting, utility coordination, bid document preparation, and construction engineering inspection associated with design and construction.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS