Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design, supply, and Installation of Newbiggin Skatepark Extension

Active
NTC/SKATEPARK/2026International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Newbiggin Town Council is seeking a specialist principal contractor for a turnkey design-and-build project to upgrade and extend the skatepark facility in Newbiggin-by-the-Sea. The scope of work encompasses the entire project lifecycle, including final structural designs compliant with BS EN 14974 safety standards, excavation, sub-base preparation, drainage alterations, and the installation of sprayed-concrete or modular skatepark features and safety surfacing. Key deliverables include the installation of an 18-metre spectator fence, RoSPA safety certification, and the provision of a comprehensive Operations and Maintenance manual. The successful contractor must provide a 20-year guarantee on the structural integrity of all installations. The contract is valued with an absolute budget ceiling of £96,767.00 excluding VAT, funded through Section 106 developer contributions and Scottish Power funding. Performance is scheduled from January 2027 through March 2027, with a mandatory completion date by the end of the 2026/27 financial year. The project will be executed under the JCT Minor Works Building Contract (2016 Edition) and requires strict adherence to Council Standing Orders. Awarding will be based on the Most Advantageous Tender (MAT) using a weighting of 60% quality and 40% price. Bidders must submit physical proposals via post by November 23, 2026, including fixed-price fee proposals, design concepts, RAMS, and evidence of previous municipal wheeled-sports projects. Mandatory requirements for applicants include current employer and public liability insurance of at least £5 million, which must be maintained for six years post-completion. Evaluation will focus heavily on commercial pricing, design inclusivity, technical competence regarding concrete curing and anchoring, and a proven track record of similar successful schemes.

General Info

Design-and-build contract to upgrade and extend the Newbiggin-by-the-Sea skatepark facility.

Documents

5

Newbiggin Skatepark Extension - Design, Supply, and Installation

PDF, High priority: read this firstitb
High

Newbiggin Skatepark Extension Tender

PDF, High priority: read this firstrfp
High

Newbiggin Town Council Skatepark Scheme Invitation to Tender

PDF, High priority: read this firstitb
High

Newbiggin Town Council Skatepark Scheme Tender

PDF, High priority: read this firstitb
High

Newbiggin Skatepark Site Audit Report

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNewbiggin Town Council
Contacts1 person available
OfficeN/A
Organization / AgencyNewbiggin Town Council
Office AddressN/A

Full Description

Show more
Newbiggin Town Council is inviting competitive tenders from experienced, specialist contractors for the design, supply, and installation of an upgraded/extended skatepark facility in Newbiggin-by-the-Sea. The successful contractor will act as the principal contractor and deliver a turnkey design-and-build package, including but not limited to: Final detailed structural and user-informed designs for new/refurbished skatepark feature additions, complying with BS EN 14974 (Skateparks safety standards). All necessary excavation, sub-base preparation, drainage alterations, and concrete slab installation. Supply and specialist sprayed-concrete construction or modular installation of skatepark features, ramps, transitions, and safety surfacing. Temporary site hoarding, security fencing, waste removal, post-installation inspection, RoSPA safety certification, and site reinstatement upon completion. The total available net budget for this contract is £97,767.00 (exclusive of VAT). Full turnkey project management, material delivery to site, on-site construction, and final commissioning. Bidders will be required to submit detailed design concepts, fixed-price fee proposals, health & safety methodology (RAMS), project timelines, and evidence of previous relevant skatepark schemes. Start Date Jan 2027/End Date: March 2027

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Cartwright AML Project; 408.26.10.006
Solicitation # SRC000464
The State of North Dakota, through the North Dakota Public Service Commission's Abandoned Mine Lands Division, is soliciting proposals under solicitation SRC000464 for professional engineering and construction services to permanently close and stabilize an abandoned underground coal mine portal near Cartwright, North Dakota. The scope of work encompasses a full project lifecycle, including site investigations of geological and hydrological conditions, the development of engineering designs and technical specifications, execution of excavation and sealing activities, and final site reclamation through grading and revegetation. The contract includes a two-year post-construction warranty and maintenance period. The overall period of performance is expected to run from approximately December 1, 2026, through December 31, 2029, with a specific construction window scheduled between June 1 and August 31, 2027. Award decisions will be based on a 100-point scale, with technical proposals weighted at 80 points and cost proposals at 20 points; technical submissions must score at least 40 points to be considered responsive. Successful offerors must provide performance and payment bonds equal to 100 percent of the contract amount and provide proof of insurance satisfactory to the North Dakota Risk Management Division. Compliance with the Davis-Bacon Act for wage determinations and Buy America preferences for incorporated materials is mandatory. Proposals must be submitted via NDBuys as separate technical and cost documents by the November 17, 2026, deadline.

POSTED

about 17 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS