Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Develop A Funding Opportunities Assessment For Climate Change Adaptation Plan

Closed
BT-RFP2026-078International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541690
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # C2305
The Elsinore Valley Municipal Water District (EVMWD) is soliciting proposals for the Corydon Well Replacement Project, which involves the professional design, bidding support, and engineering services required to replace and abandon the existing Corydon well in Wildomar, California. The project is divided into two primary phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of the new well and abandonment of the old one; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation design for equipping, testing, and commissioning the new groundwater production well. The project is funded through District funds and a Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, necessitating compliance with federal requirements, including the Build America Act, Buy America Preference, and the use of the Automated Standard Application for Payments (ASAP) system. TKE Engineering, Inc. is seeking qualified DBE, MBE, and WBE firms specializing in hydrology/hydraulic consulting, structural and electrical engineering, geotechnical investigation, and utility potholing. Proposals are due by 10:00 a.m. on September 1, 2026, via the PlanetBids Vendor Portal. Selection is based on demonstrated competence and professional qualifications, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%), while cost and innovation each account for 10%. The total estimated project cost is 2,260,788 dollars, though the final contract will be a negotiated not-to-exceed dollar limit. Awardees must adhere to strict federal and state regulations, including whistleblower protections, drug-free workplace standards, and specific insurance and bonding requirements for contracts exceeding the simplified acquisition threshold.
TKE Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 541690
New
SLED
Call 021 B3CBA2602572-0
Solicitation # B3CBA2602572-0
The contract, identified as Call 021 B3CBA2602572-0 issued by the Georgia Department of Transportation (GADOT), seeks the installation and integration of Intelligent Transportation Systems (ITS) devices and network infrastructure in Hall, Georgia. The scope encompasses the deployment of network switches, field cabinets, fiber optic transmitters and receivers, serial data terminal servers, security locks, UPS and battery systems, and solar power components, all to be installed in new or existing rack spaces per manufacturer specifications. Equipment must be new, sourced from a single manufacturer using identical models and firmware, and comply with ISO 9001 or Six Sigma quality standards. Delivery requirements mandate protective packaging with detailed labeling including manufacturer name, model, serial numbers, and project number, while specific materials like reinforcement steel and thermoplastic marking must adhere to strict handling and storage protocols. All items must be delivered with shipping and handling costs included in the base bid. Contractors are required to submit a Project Management Plan within 14 days of the Notice to Proceed or 30 days before installation, along with an Installation Plan containing schematic drawings, a Test Plan and Schedule, and comprehensive operations, maintenance, and user manuals for all ITS devices. Compliance is tracked through a specification compliance matrix that must clearly indicate adherence to each requirement with the word “Comply.” The contractor assumes full responsibility for equipment prior to installation and final acceptance, and must ensure all systems undergo a successful burn-in test before final inspection and close-out, which includes demonstrating full system operation, verifying traffic control device configuration, completing punch list items, restoring field conditions, submitting final as-built plans, delivering spare parts, completing training, and transferring all warranties. Final acceptance is contingent on receipt of all warranties. Legal obligations include compliance with the Georgia Security and Immigration Compliance Act Affidavit, a Drug-Free Workplace certification, and ADA Title II accessibility requirements. Proposals must be submitted as a single PDF to the Construction Manager by email, and bidders must obtain eligibility to bid by submitting required forms no later than noon the day before the letting, with failure to do so resulting in disqualification. The contract is categorized under NAICS 541690 and governed entirely by GDOT Standard Specifications, including provisions for prosecution, suspension, default, claims for adjustments, and maintenance, with the Department retaining sole authority to accept or reject equipment and take emergency action if warranted.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours

AI Contract Overview

Show more

The City of Brampton is soliciting proposals from qualified consultants to develop a comprehensive Funding Opportunities Assessment in support of its Climate Change Adaptation Plan. The assessment will analyze the financial and resource implications of implementing the plan, including detailed costing of proposed actions, prioritization of initiatives based on existing funding, identification of potential funding sources, determination of funding gaps, and evaluation of viable opportunities for securing additional resources. The deliverable is designed to equip the City with a clear understanding of the financial landscape needed to execute the adaptation plan effectively and to guide strategic financial planning. The project is expected to be completed within a 6- to 9-month timeframe following contract award. Solicitation BT-RFP2026-078 was posted on May 15, 2026, with a response deadline of May 22, 2026. The procurement is being managed by the City of Brampton, even though the agency listing incorrectly references the Government of Canada. Primary contact for the solicitation is Saj Thomas, Contracting Authority, reachable via email at Saj.Thomas@brampton.ca or by phone at 1111111111. The tender opportunity is accessible online through the CanadaBuys portal, and while no specific set-aside or NAICS code is indicated, the project is open to qualified consultants capable of delivering high-level financial and strategic analysis in the context of climate resilience planning.

General Info

Brampton seeks consultant to assess funding for climate adaptation plan within 6–9 months.

Agency

Government of Canada → City Of BramptonView Agency

NAICS

541690 - Other Scientific and Technical Consulting ServicesView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City Of Brampton
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City Of Brampton
View Agency Profile
Office AddressN/A
Contacts
Saj ThomasContracting Authority

Full Description

Show more
[Brief description of the procurement including the nature & quantity of the goods, services or contraction to be procured or , if the quantity is not known, the estimated quantity. (Copy from your Procurement Plan 2.1 Procurement Statement)]The City is seeking a qualified Consultant to develop a Funding Opportunities Assessment for the City’s Climate Change Adaptation Plan. The Assessment will provide detailed information on the implications of the cost of the Plan including costing of actions, prioritizing actions based on current available funding, identifying sources of funding, funding gaps and resource required, along with evaluating funding opportunities the City should take advantage of. The Assessment will allow the City to better understand the financial and resource implications of implementing the Plan. It is anticipated to be completed in 6-9-month period.