This Solicitation opportunity from Tennessee was posted on November 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Development Resource Center Interior Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Development Resource Center Interior Improvements project for the City of Chattanooga involves comprehensive interior renovations across multiple floors of the building, including the first, second, and third floors. The scope encompasses interior carpentry work such as constructing new walls with windows, installing new doorways, repairing existing door frames, and modifying door swings. Additionally, the project includes extensive electrical work, such as adding lighting, emergency exit signs, and upgrading electrical systems, as well as plumbing and sprinkler system installations, notably adding a sprinkler head. A significant component involves upgrading accessibility features by installing an ADA button-activated system on three sets of doors. The work also involves coordinating with various city departments and vendors, ensuring proper permit acquisition, and adhering to security and damage repair protocols during construction. The procurement process is managed through multiple invitation for bids and addenda, with bid openings scheduled for November 6, 2025, following initial deadlines in October 2025. The project size is estimated between $500,000 and $1,000,000, and it is designated under NAICS code 238220, indicating specialized electrical and carpentry services. The documentation emphasizes detailed coordination, safety, and compliance requirements, with several addenda providing clarifications on project scope, bid procedures, and technical revisions. The primary point of contact for the project is Debbie J. Talley, and the project is overseen by the City Engineer, William C. Payne, P.E., ensuring adherence to city standards and specifications throughout the renovation process.
General Info
Place of Performance
TN, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Interior Carpentry on the First Floor (North End of the Building, Main Lobby) which includes adding two new walls with windows, electrical. Plumbing, adding a sprinkler head. Adding an ADA button activated system to three sets of doors (two existing, one new). Electrical, adding new lighting. Interior Carpentry on the First Floor (Main Corridor) which includes removing a section of wall and putting in four new doorways. Repositioning a door to swing in the opposite direction. Interior Carpentry on the Second Floor (City Engineering) which includes repairing a door frame and replacing a damaged door. Interior Carpentry on the Third Floor (Conference Room 3A) which includes adding two new walls with doors and windows. And others that are identified within the Plans and specifications.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
