Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - Prequalified General Stage II - Department of Health and Human Services/USDC - USDC Steam Tunnel Repair - Project #26365410

Closed
CS26090State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238140
New
International
Maplelawn Garden Wall Rehabilitation
Solicitation # NCC-DC-039015-RFP
The National Capital Commission is soliciting proposals for the rehabilitation and reconstruction of 285 meters of historic native limestone masonry garden walls at the Maplelawn Garden Estate, located at 529 Richmond Road in Ottawa. The project aims to restore the structural and aesthetic integrity of the walls, eliminate public safety risks, and ensure long-term durability while preserving the site's heritage characteristics. The scope of work includes dismantling existing masonry, salvaging stone units for reinstatement, installing new concrete footings, and constructing reinforced concrete retaining walls specifically for the east and south sections. Performance is scheduled across several milestones, with demolition and excavation in spring 2027, foundations in summer 2027, and masonry reconstruction concluding in fall 2027. Proponents are evaluated on a combined score of technical capabilities (60 points) and financial proposals (40 points), with a minimum technical threshold of 36 points required to proceed. Technical evaluation focuses on project experience with heritage masonry and client references from the past five years. The contract is structured as a unit price agreement, with detailed cost breakdowns required for sitework, masonry, and site restoration. Key requirements include the retention of a Qualified Person for soil management, professional liability insurance of at least 2 million dollars for specific engineering designs, and strict adherence to heritage restoration standards. Final award is based on the top-ranked proponent, with a tie-breaker favoring the lowest price.
National Capital Commission

POSTED

about 22 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

Only contractors prequalified under Stage I and currently listed on the DFCM Prequalified Contractors list are eligible to bid on this project, which involves repairing a portion of the concrete ceilings in existing steam tunnels and demolishing the existing well pump building to construct a new, enlarged building over the well, along with replacing the ramps and patio for the Rec Building. The estimated construction cost is $425,000, with a NAICS code of 238140, and the solicitation number is CS26090, issued by the State of Utah’s Division of Facilities Construction and Management for the Department of Health and Human Services/USDC in American Fork, Utah. The bid submission deadline is June 25, 2026, at 3:00 PM MT via the U3P website, and attendance at a mandatory pre-bid meeting on June 10, 2026, at the Admin Building in American Fork is required. The contract will be awarded to the lowest responsive and responsible bidder, subject to strict pass/fail gates including submission of a complete list of all first-tier subcontractors within 24 hours of bid opening, with thresholds of $20,000 or more for subcontractors on projects under $500,000; failure to comply will disqualify the bid. All awarded contractors must provide performance and payment bonds in the full contract amount using AIA Document A312-2010 forms, submitted via email to [email hidden] within ten business days of contract receipt, with the Notice to Proceed withheld until bonds are received. The schedule requires substantial completion by December 18, 2026, with liquidated damages of $400 per day for delays, increasing by 0.5% daily after the 14th day of delay, and an additional 5% of the daily rate for each day beyond the punchlist completion date. Contractors must submit a detailed schedule of values with the first payment application and are prohibited from requesting payment for work performed by subcontractors if they do not intend to pay them. Inspections require at least two working days' notice to DFCM or the Architect/Engineer, and any work covered before inspection must be uncovered and restored at the Contractor’s expense. Compliance with the State of Utah High Performance Building Standard and all DFCM design and fabrication guidelines is mandatory, and the awarded Contractor must submit a Health

General Info

Utah DFCM seeks prequalified contractors for $425,000 concrete repairs and building construction.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

10

DFCM General Conditions August 2020

PDF, High priority: read this first60 pages · general-conditions
High

General Conditions August 31, 2020

PDF, High priority: read this firstgeneral-conditions
High

Instructions and Subcontractors List Form for Utah DFCM Project

PDF, High priority: read this firstinstructions-subcontractors-list
High

Stage II Invitation to Bid for USDC Steam Tunnel Repair Project CS26090

PDF, High priority: read this firstrfb
High

Structural Calculations Report for USDC Pumphouse and Tunnel Lid Repair

PDF, High priority: read this firststructural-calculations
High

Subcontractors List Form Instructions

DOCX, High priority: read this first3 pages · instructions
High

USDC Tunnel Repair and Pump House Project Manual DFCM #26365410

PDF, High priority: read this firstspecifications
High

2-CS26090-26365410-Plans-Unapproved.pdf

PDF, Low priorityother
Low

Health Insurance Statement of Compliance Form Revised 7.28.25

DOCX, Low priority1 page · compliance-form
Low

Health Insurance Statement of Compliance - Utah

PDF, Low prioritycompliance-statement
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Lee Hutchings

Full Description

Show more
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.**
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
**Project Description: Repair a portion of the concrete ceilings of the existing steam tunnels. Demolish the existing well pump building and provide a new enlarged building over the existing well.**
**Construction Cost Estimate: $425,000.00**

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS