This Solicitation opportunity from Utah was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DFCM Construction - Prequalified Site Civil Stage II - Department of Transportation- UDOT Kanarraville Lagoon - Project #26362900
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Only contractors prequalified under Stage I and currently listed on the DFCM Prequalified Contractors list are eligible to bid on this project. The State of Utah, through the Division of Facilities Construction and Management, is soliciting bids for the construction of a sewage lagoon at the Kanarraville rest stop with an estimated cost of $2,642,782.00. Solicitation number CR26071 was posted on May 27, 2026, and bids are due by June 24, 2026. The work must be performed at the project site in Utah and is governed by the Contract Documents, which include plans, specifications, and special provisions that supersede standard requirements. The award will be made on a Lowest Price Technically Acceptable basis, selecting the responsible bidder with the lowest responsive bid based on total estimated quantity multiplied by unit price. Bidders must submit required attachments including qualifications of joint venturers, diverse business certifications if applicable, safety performance records, financial statements, schedules of current and past projects, and resumes of key personnel including the Project Manager, Superintendent, Quality Manager, and Safety Manager. Insurance requirements mandate commercial general liability, professional liability, and workers’ compensation coverage with primary status and required endorsements. All work must comply with APWA Manual standards, referenced ASTM and AASHTO test methods, and applicable state and federal regulations. The contractor is responsible for conducting and paying for all inspections and tests, with acceptance occurring on-site upon issuance of the Certificate of Substantial Completion. Payment will be processed upon submittal of the EJDCC® C-620 Contractor’s Application for Payment, though specific remittance details, accounting codes, and electronic invoicing systems are not outlined. The period of performance begins 30 days after the effective contract date or upon receipt of a Notice to Proceed, with all schedules broken into tasks not exceeding 14 calendar days in duration. No FOB terms, packaging, preservation, or marking requirements are specified beyond basic sample identification. Bids must be submitted electronically through the U3P website, and all documents must be fully signed and unaltered. Representations and certifications related to UEI, CAGE, small business status, safety history, and anti-corruption are required as templates and must be completed by offerors, though no responses are included in the solicitation package.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
**Project Description: UDOT Sewage Lagoon for Kanarraville rest stop.**
**Construction Cost Estimate: $2,642,782.00**
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
