Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - VBS Construction Stage II - Invitation to Bid - DNR/State Parks - Great Salt Lake Marina Water Line Replacement - Project #22236510

Closed
MP26045-Stage IIState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This solicitation invites only pre-qualified contractors to submit sealed bids for the construction of a new waterline system to serve the Great Salt Lake State Park and the Great Saltair, including an above-ground water storage tank and a booster pump station, with a construction cost estimate of $10.2 million. The project is part of a two-stage selection process, with this Stage II Invitation to Bid restricted to firms shortlisted during the prior Request for Proposals phase, and bids must be submitted electronically via the U3P website by August 26, 2026, at 3:00 PM. To be considered responsive, each bid must include a bid bond in the amount of 5% of the bid value, issued on the AIA A310-2010 form or equivalent; failure to provide this renders the bid nonresponsive and subject to disqualification. The award will be made to the lowest responsive and responsible bidder, with responsibility determined by compliance with mandatory qualifications, including documented evidence of at least five HDD installations totaling 5,000 feet within the past two years. The contract requires compliance with stringent technical, safety, and administrative standards. All HDPE pipe and fittings must be manufactured and marked per ASTM D3261, with specific labeling requirements including nominal size, DR rating, PE4710 designation, and manufacturer identification. Cathodic protection using galvanic anodes is mandated, with strict storage and handling rules requiring anodes and backfill to remain dry and off the ground; wet or damaged materials are prohibited and must be removed immediately. Horizontal Directional Drilling must be executed with specified equipment including drill rigs, tracking systems, fusion welders, and mud systems, accompanied by test pits at each crossing. Performance and payment bonds are required on AIA A312 (2010) forms, and both Contractor’s Liability and Builder’s Risk insurance must be maintained. Contractors must submit a detailed progress schedule and schedule of values, adhere to inspection protocols with two-day advance notice, and correct any nonconforming work at their own expense. Final payment waives all claims except those formally documented as unsettled, and late payments accrue interest per Utah Code §15-6-3. Subcontractors must be listed with full certification of licensing, with thresholds of $20,000 or $35,000 depending on project size, and failure to submit the form may void the bid. All bidders must certify

General Info

Pre-qualified contractors only; build water tank and pump station for $10.2M in Utah, deadline August 26, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

8

3-MP26045-22236510 Structural Calculations for DNR GSL Marina Water Line Replacement

PDF, High priority: read this firststructural-calculations
High

6-MP26045-22236510 General Conditions Document

PDF, High priority: read this firstgeneral-conditions
High

Addendum No. 1 for DNR GSL Marina Water Line Replacement Project

PDF, High priority: read this firstamendment
High

GSL Marina Water Line Replacement Geotechnical Engineering Services Technical Memorandum

PDF, High priority: read this firstspecifications
High

MP26045-22236510 Stage II Invitation to Bid for Great Salt Lake Marina Water Line Replacement

PDF, High priority: read this firstrfb
High

Subcontractors List and Instructions Form - MP26045-22236510

DOCX, High priority: read this firstsubcontractors-list
High

GSL Marina Water Line Replacement Fee Schedule

PDF, Low prioritycost-fee-schedule
Low

Health Insurance Statement of Compliance - DFCM General Conditions

DOCX, Low prioritycompliance-statement
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts

Full Description

Show more
**INVITATION TO BID**
This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process.
**Project Description:**The installation of a new water line to feed the Great Salt Lake State Park and the Great Saltair. This will include the construction of an above-ground water storage tank and a booster pump station.
**Construction Cost Estimate:**$10,200,000.00

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS