Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - VBS Programming & Design Services - Utah Tech University - Health Sciences Building and Taylor Building Remodel - 27317640

Closed
MP26053State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The State of Utah’s Division of Facilities Construction and Management is soliciting programming and design services for the construction of a new 100,000 square foot health sciences building on the Utah Tech University main campus and the remodel of the third floor of the Taylor Health Sciences Building to accommodate the University of Utah School of Medicine St George cohort of 30 medical students. The project carries an estimated construction budget of $72 million, though the contract itself does not specify a fixed price and requires proposers to develop a comprehensive scope, budget, and schedule control plan. The solicitation, identified as MP26053, was posted on June 11, 2026, with proposals due by July 7, 2026, at noon. Proposals must be submitted electronically through the U3P portal in a single PDF not exceeding 24 pages, with no hyperlinks, blank pages, or section dividers allowed. Contractors must provide at least three collective past performance ratings, combining both DFCM and non-DFCM projects, to pass a mandatory qualification gate; failure to meet this threshold results in disqualification. Evaluation is based on best value to the state, with weighted scoring favoring the management plan at 115 points, followed by the statement of qualifications at 90 points and past performance references at 50 points. The work includes a detailed feasibility review of campus master plans, site analysis with geotechnical borings, facility programming with space and systems requirements, and the delivery of a formal programming document along with digital and hard-copy renderings, CAD designs, and supporting data. All deliverables must adhere to the State of Utah High Performance Building Standard, UTU design standards, and DFCM’s specific design and fabrication guidelines. Insurance and bonding requirements include performance and payment bonds on AIA A312 forms, builder’s risk coverage, and liability insurance meeting minimums outlined in DFCM’s general conditions. The contractor must also comply with state health insurance mandate requirements if contract thresholds are met, submitting a certified statement of qualified coverage prior to a Notice to Proceed. A detailed CPM schedule covering the first 90 days is mandatory for payment approval, and progress payments are subject to retainage and a schedule of values submitted to both the A/E and DFCM. Project completion is contractually due by September 30, 2026, with substantial completion requiring A/E certification. All changes to key personnel require DFC

General Info

Utah seeks design firms for $72M health sciences building and renovation at Utah Tech University.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

6

DFCM General Conditions August 2020

PDF, High priority: read this first60 pages · general-conditions
High

DFCM Past Performance References Form

DOCX, High priority: read this firstpast-performance
High

MP26053 Health Sciences Building and Taylor Building Remodel Solicitation

PDF, High priority: read this firstrfp
High

Health Insurance Statement of Compliance Form Revised 7.28.25

DOCX, Low prioritycompliance-form
Low

Termination or Debarment Certification Form

PDF, Low prioritycertification-form
Low

Utah Tech University Health Sciences Building Feasibility Study June 2023

PDF, Low priorityfeasibility-study
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Clint Bunnell

Full Description

Show more
**REQUEST FOR PROPOSAL**
The State of Utah - Division of Facilities Construction and Management (DFCM) is soliciting the services of qualified firms/individuals to perform **<>** services for the following project:
**Project Description:** Construction of new 100,000 square foot health sciences building on the main campus and remodel of 3rd floor Taylor Health Sciences Building to accommodate the University of Utah School of Medicine St George Cohort of 30 medical students.
**Construction Budget:** $72,000,000.00

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS