Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on March 18, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

6515--Cleanascope Procurement

Awarded
36C24422Q0364Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 339113
New
Federal
6530--Rehabilitation Equipment - High Low Beds and Parallel Bars - for the East Indianapolis VA clinic
Solicitation # 36C25027Q0044
The Department of Veterans Affairs is conducting market research through a Sources Sought Notice to identify domestic suppliers for physical therapy and rehabilitation equipment for the East Indianapolis VA Clinic. The agency is seeking information on one set of electric platform-mounted parallel bars and three bariatric hi-lo treatment tables. Both items must be Made in America and new, current-production models. The parallel bars require a 10-foot gait-training platform, a 500 lb load capacity, and ETL approval. The treatment tables must support at least 500 pounds, feature a powered height range of 18 to 37 inches, and operate on standard 120 VAC, 60 Hz electrical service. This notice is for informational and planning purposes only and is not a solicitation for quotes; therefore, no contracts will be awarded from this specific notice. Interested parties must provide their company details, SAM Unique Entity Identifier, place of manufacture, and socio-economic status to be considered for future acquisition decisions. All submissions must be sent to Contracting Officer Brian Rosciszewski by the specified deadline, referencing solicitation number 36C25027Q0044. Active registration in the System for Award Management is required for any future eligibility for a federal contract award.
250-NETWORK Contract Office 10 (36C250)

POSTED

about 6 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Department of Veterans Affairs Network Contracting Office 4 awarded contract 36C24422P0364 to Janz Corporation, located in Columbus, Ohio, on March 15, 2022. The total award amount is 27,137.50 dollars. This procurement was designated as a total small business set-aside under NAICS code 339113, with the contracting office based in Pittsburgh, Pennsylvania. While the award notice refers to Cleanascope Procurement, associated solicitation documents indicate a requirement for Guest WiFi Ethernet services at the VA Medical Center in Wilkes-Barre, Pennsylvania. The scope of work involves providing 100 Mbps of internet bandwidth over fiber optic cable with content filtering. The anticipated period of performance is structured as a five-year firm-fixed price contract, consisting of a 12-month base period starting March 2, 2022, and four optional 12-month extension periods ending March 1, 2027.

General Info

Contract Value

$27,137.5

NAICS

339113 - Surgical Appliance and Supplies Manufacturing

Place of Performance

Columbus, OH, 43213, USA

Set-Aside

SBA

Award Issued Date

Documents

7

36C24422Q0364 Amendment 0002 - Guest WiFi services VA Wilkes-Barre

DOCX, High priority: read this first3 pages · amendment
High

36C24422Q0364 - Guest WiFi Service - VA Medical Center Wilkes-Barre

PDF, High priority: read this firstrfq
High

Amendment 0001 - 36C24422Q0364 (Guest WiFi Services)

PDF, High priority: read this firstamendment
High

Amendment 0002 - Solicitation 3C24422Q0364

PDF, High priority: read this firstamendment
High

Solicitation 36C24422Q0364 Amendment - Guest WiFi Services

DOCX, High priority: read this first4 pages · amendment
High

Solicitation 36C24422Q0364 - Guest WiFi Services

DOCX, High priority: read this first4 pages · rfq
High

36C24422Q0364 - Answers to Questions Received - Guest WiFi Services

DOCX, Low priority3 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed. Set-aside removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Feb 14, 2022 to Feb 21, 2022. The notice title changed. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
Contacts1 person available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
Contacts
Tyler KarnsContract Specialist

Full Description

Show more
Award Notice SUBJECT* 642-22-1-330-0005 | Cleanascope Procurement GENERAL INFORMATION CONTRACTING OFFICE'S ZIP CODE* 15215 SOLICITATION NUMBER* 36C24422P0364 BASE NOTICE TYPE ARCHIVE 10 DAYS AFTER THE AWARD DATE RECOVERY ACT FUNDS N PRODUCT SERVICE CODE* 6515 NAICS CODE* 339113 SET-ASIDE SBA CONTRACTING OFFICE ADDRESS Department of Veterans Affairs Network Contracting Office 4 1010 Delafield Road Pittsburgh PA 15215 POINT OF CONTACT* Contract Specialist Tyler Karns Tyler.Karns@va.gov (412)-822-3269 AWARD INFORMATION AWARD NUMBER* 36C24422P0364 AWARD AMOUNT* $27,137.50 LINE ITEM NUMBER 3 AWARD DATE (MM-DD-YYYY)* 03-15-2022 AWARDEE NAME* JANZ CORPORATION, THE CONTRACTOR'S DUNS NUMBER 103534595 AWARDEE ADDRESS LINE 1* 275 OUTERBELT ST AWARDEE CITY COLUMBUS AWARDEE STATE OH AWARDEE ZIP CODE 43213 DESCRIPTION End of Document

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a sealed bid invitation for a firm-fixed price contract to perform roof replacement services at the Wilmington VA Medical Center in Delaware. The project involves the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11. The scope of work includes the installation of 60 Mil Elevate RubberGard EPDM LS-FR white roofing material or an equivalent, flat tapered insulation, and HD cover board, as well as the inspection and replacement of deteriorated metal decking. All installations must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. The estimated construction magnitude is between $250,000 and $500,000. This procurement is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). To be eligible for award, bidders must be registered in the System for Award Management (SAM), VETCERT, and the VETS-4212 database. Award will be granted to the responsive and responsible bidder offering the lowest price. Key requirements include compliance with Davis-Bacon wage determinations for New Castle County, Delaware, and strict adherence to OSHA safety standards, requiring a 30-hour certified competent person on-site. Performance and payment bonds are required for contracts exceeding $150,000. The final bid opening is scheduled for November 4, 2026, at 11:00 AM EST.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 334516
New
Federal
6550--VISN 4 Coagulation Testing
Solicitation # 36C24427Q022
The Department of Veterans Affairs, Network Contracting Office 4, is soliciting an indefinite-quantity contract for advanced coagulation testing and monitoring services to support nine VA Medical Centers. The scope of work includes the delivery, installation, and removal of a self-contained coagulation testing system capable of performing Prothrombin Time, Activated Partial Thromboplastin Time, International Normalized Ratio, International Sensitivity Index, Fibrinogen, D-Dimer, and Anti-Factor Xa tests. The period of performance is established from December 1, 2026, through November 30, 2031. Technical requirements specify a bi-directional, bar-coded computer interface compatible with the VA laboratory information system and Beckman Coulter Remisol software, with a barcode reading failure rate of less than 1%. The contractor must adhere to CLSI standards for quality control and comply with OSHA, EPA, and 40 CFR regulations regarding hazardous waste documentation and safety data sheets. Equipment acceptance is contingent upon meeting performance standards for 30 consecutive calendar days at an effectiveness level of 90% or more. Award will be based on a comparative evaluation of past performance, price, and technical capability to determine the most advantageous offer to the government. The solicitation is open to all qualified offerors, with a specific price evaluation preference for HUBZone small business concerns. Submissions must include a price quotation and past performance information, with an optional technical section, and be delivered electronically to the contracting officer.
Analytical Laboratory Instrument Manufacturing

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Z1DA--NRM| 460-26-007 Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)
Solicitation # 36C24427B0002
The Department of Veterans Affairs Network Contracting Office 4 has issued a Request for Information for planning and market research purposes regarding electrical distribution inspection repairs at the Wilmington, Delaware VA Medical Center. This is not a request for proposal, and the government is not obligated to award a contract based on this notice. The project involves repairing all failures identified in the facility's electrical inspection and testing report, specifically focusing on the review and validation of results, the procurement and installation of circuit breakers and racking mechanisms, and the repair of old equipment to be used as future spares. All work must adhere to VA requirements, NETA test standards, and applicable federal, state, and local codes, with a total performance period of 365 days from the Notice to Proceed. The estimated magnitude of construction is between 25,000.00 and 100,000.00. This opportunity is designated as a set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220 for Commercial and Institutional Building Construction. Interested contractors must submit a statement of interest, capability statement, pricing for similar past projects, and company identification details, including their UEI number and intended contracting role, to the designated point of contact by October 30, 2026, at 4:00 PM EST. Submissions must be electronic, as hard copies will not be accepted.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS