Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Dillard Ranch Master Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dillard Ranch Master Plan is a comprehensive planning initiative by the Sacramento County Department of Regional Parks to transform approximately 97.08 acres of land into a public asset that preserves the cultural and natural heritage of the Wilton community. Located at 9857 Dillard Road, the project focuses on two primary areas: the Historic Residential Core and the Historic Agricultural Core. The residential core includes the rehabilitation of a 1,620 square foot ranch house for the Wilton History Group, new pedestrian pathways, and an upgraded ADA-compliant parking lot. The agricultural core features a rehabilitated 3,700 square foot hay barn for community meetings, a new 400 square foot restroom facility using salvaged materials, a 7,200 square foot private practice arena, and rehabilitated animal pens and corrals. The plan offers two conceptual options, with Option A being the preferred choice; Option B adds a 2,500 square foot community garden and a 300 square foot amphitheater. The remaining property will be utilized for groundwater sustainability and agricultural leasing. Administratively, the project is managed by Julie Newton and Amber Veselka of Sacramento County. Under CEQA Guidelines Section 15262, the project is currently classified as a planning study without legally binding effects, meaning it serves as a vision for future development and does not yet have approved funding or a fixed contract value.

General Info

Non-binding plan to transform Dillard Ranch into public heritage site with rehab buildings, ADA parking, and pedestrian paths.

Agency

California → Sacramento County

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

PLER2023-00081 Notice of Exemption for Dillard Ranch Master Plan

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Julie NewtonEnvironmental Coordinator
Amber VeselkaRecreation Supervisor

Full Description

Show more
The Dillard Ranch Master Plan is a comprehensive planning document establishing the overarching vision for Dillard Ranch and serving as the foundation for future projects and planning efforts at the property. The plan provides recommendations to achieve County Parks' goal of transforming Dillard Ranch into a public asset that protects, preserves, and interprets the cultural and natural heritage of the Wilton community and the surrounding region of Sacramento County. The plan reflects feedback received from the public with the intention of delivering a new public benefit that addresses the needs and desires of the surrounding community. The Dillard Ranch Master Plan area comprises approximately 97.08 acres. The preferred conceptual plan area consists of the historic residential core, historic agricultural core area, fire station expansion area, and use of the remaining portion of the property for continued and future agricultural leasing/groundwater sustainability. Access to the site will be from Dillard Road, with the parking lot fronting the site. An additional entry/exit point will also be from Davis Road. The Dillard Ranch Master Plan centers around the historic residential core area and historic agricultural area at approximately 6 acres, with two planning options (A and B). The difference between the two options is the addition of a community garden and amphitheater/gathering space in Option B. Option A is the preferred option. Specific potential future site improvements outlined in the Master Plan include: Historic Residential Core o Rehabilitated ranch house, with administrative and collections storage facilities for the Wilton History Group (approximately 1,620 square feet); o New outdoor picnic seating dispersed throughout site; o New pedestrian pathway with stabilized decomposed granite; o Interpretive signage located at the front of buildings and along primary pathways; o Upgrade of existing compacted gravel parking lot fronting Dillard Road; entry public parking area consisting of 10-15 parking spaces with ADA compliant stalls; o Optional:, amphitheater/gathering Space - Approximately 300 square feet with maximum occupancy of 100 persons; no amplified sound; o Optional: community garden - Approximately 2,500 square feet; open to the public on a drop-in basis. Historic -Agricultural Core Area o Rehabilitated hay barn, with a community meeting space accommodating 40-50 occupants (approximately 3,700 square feet); o New restroom building using salvaged materials (400± square feet) that will be tied to existing on­site septic system; o Private practice arena - 7,200± square feet (60' x 120'). Operations will include use of the facility by single users, small groups, and large events; o Rehabilitated animal pens and corrals; o Interpretive signage; o Two (2) compacted gravel public parking areas, one for commercial vehicles and one for trailers and oversized vehicles used for agricultural operations.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline, decommissioning existing pump stations, and installing service laterals for properties currently using onsite septic. The scope may also include transportation improvements such as roadway reconstruction and ADA curb ramps, as well as public outreach and right-of-way acquisition. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total budget for design and construction activities of approximately 3.875 million dollars. The City of Bend will select a consultant based on a scoring system that evaluates project understanding, team qualifications, and firm experience, with an optional interview component. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with federal, tribal, state, local, or independent DBE certifications as part of a good faith effort. Interested subconsultants must adhere to strict proposal formatting and submission guidelines, with a response deadline of September 29, 2026.
Parametrix

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601). The primary objective is to develop shovel-ready construction documents to mitigate chronic flooding and enhance infrastructure resilience in the College Park East neighborhood. The scope of work includes a comparative evaluation of pump station siting alternatives at Ironwood and Aster Park, the design of storm drain lines, culverts, and catch basins, and the implementation of a stormwater pump station and retarding basin. Key deliverables consist of 60 percent, 90 percent, and 100 percent plans, specifications, and estimates, along with necessary environmental reviews under CEQA and potentially NEPA. This procurement is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200. Selection is qualifications-based, following the Brooks Act and California Government Code section 4526, with an emphasis on team experience, project approach, and understanding of the scope. The contract is structured as a professional services agreement on a time-and-materials basis with a not-to-exceed value of 1.3 million dollars. Compliance requirements include adherence to California prevailing wage laws, Equal Employment Opportunity clauses, and DBE regulations. Proposals were due by September 22, 2026, with an estimated notice to proceed occurring eight weeks after the submittal deadline.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive and includes utility locating, potholing, geotechnical and geophysical investigations, LIDAR, and a wide array of engineering support covering civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include cathodic protection system design, BIM/3D modeling, commissioning and startup planning, land surveying, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system. Responsive bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and OBE firms. Bidders must demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to several collective bargaining agreements. The bid date is September 11, 2026, and the primary point of contact for the project is Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS