Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DIRECT OWNERSHIP for SOLAR PHOTOVOLTAIC SYSTEM (PV) INSTALLATION

Closed
PennBid: 143911State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

6 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

22 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Luzerne County Transportation Authority (LCTA), governed by the Municipal Authorities Act of 1945 and overseen by a nine-member Board of Directors appointed by the Luzerne County Board of Commissioners, is seeking to install a solar photovoltaic system at its new facility located at 300 South Pennsylvania Avenue, Wilkes-Barre, PA. The facility, constructed in 2024, spans approximately 208,000 square feet and includes a high bay bus maintenance/storage area along with administrative offices. Scheduled for occupancy in July 2024, the building's energy needs will be fully met by the solar system, which will also power four compressed natural gas (CNG) compressors. LCTA employs 155 staff across various operational and administrative roles and operates a fleet of 94 revenue vehicles, with funding sourced from federal, state, and local programs. The project involves a direct ownership model where LCTA will select a solar developer through a competitive RFP process, entering into an Engineering, Procurement, and Installation (EPI) contract, along with a short-term (one-year) operations and maintenance agreement, either with the contractor or a third-party provider. The total project cost is estimated between five and ten million dollars, and responses to the solicitation are due by August 8, 2024. The primary contact for this project is Kristene Kelly, reachable via email at [email hidden].

General Info

Agency

Pennsylvania → Luzerne County Transportation Authority, Pa

Place of Performance

PA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Luzerne County Transportation Authority, Pa
Contacts1 person available
OfficeN/A
Organization / Agency
Pennsylvania → Luzerne County Transportation Authority, Pa
Office AddressN/A
Contacts
Kristene Kelly

Full Description

Show more
LCTA is a municipal authority and is governed by the Municipal Authorities Act of 1945. LCTA is governed by a nine-member Board of Directors. Members are appointed by the Board of Commissioners of Luzerne County. LCTA employs 155 employees in a variety of operating and administrative positions. LCTA operates a fleet of 94 revenue vehicles. LCTA is funded through a variety of programs at the Federal, State and local level. LCTA follows all applicable third-party procurement policies in accordance with the Federal Transit Administration (FTA) Circular 4220.1F. The building requiring the installation of the solar photovoltaic system is located at 300 South Pennsylvania Avenue, Wilkes-Barre, PA 18702. This building was constructed in 2024 and consists of a combination of high bay bus maintenance/storage area in addition to a two-story administrative area. The total building square footage of the facility is approximately 208,000 square feet. Reference page 62-64 for plans and photos. LCTA is scheduled to occupy the new facility in July 2024. The energy generated from this project will fully power LCTA’s administrative, maintenance and storage facilities and four CNG (compressed natural gas fuel) compressors. This RFP is for a direct ownership model, where the LCTA selects a solar energy developer and enters into an Engineering, Procurement and Installation contract and a short-term (1-year) project operations and maintenance (“O&M”) contract with either the contractor or a third-party provider of solar O&M services. The LCTA will own the system from its completed installation.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS