Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project PA-2500218 (C) is a Conditional Use Permit application for the development of a 14.5-acre ground-mounted photovoltaic energy facility located at 18133 E Comstock Road in Linden, San Joaquin County, California. The facility is designed to generate up to 3 megawatts of solar energy using photovoltaic modules, inverters, and single-axis tracker technology to maximize collection efficiency. The system will be anchored by driven piers with a maximum height of 15 feet and will interconnect with the Pacific Gas and Electric electrical distribution system along East Comstock Road. The project is subject to a Mitigated Negative Declaration, indicating that proposed mitigation measures reduce potential environmental effects to less than significant levels. Compliance requirements include adherence to the San Joaquin County Multi-Species Habitat Conservation and Open Space Plan, the California Building Code for seismic safety, and the Society of Vertebrate Paleontology guidelines. Final structural design and construction must be approved and inspected by the City Building Inspector and a California-registered professional geotechnical engineer to ensure all seismic and site-specific engineering standards are met.

General Info

San Joaquin County permit for a 3MW ground-mounted solar facility in California.

Agency

California → San Joaquin County

Place of Performance

North Duncan Road and North Cox Road, CA, 95236

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Jessica LealAssociate Planner
Ryan NybergProject Manager

Full Description

Show more
A Conditional Use Permit for 14.5-acre ground-mounted photovoltaic energy facility. The project will generate up to 3 megawatts of solar energy utilizing photovoltaic solar modules, inverters, and appurtenant electrical equipment and distribute the useable energy to the electric grid. The modules will be mounted on a steel racking system employing single-axis tracker technology that efficiently tracks the sun’s movement throughout the day and maximizes the efficiency of solar collection. The rows of modules will be anchored in the ground using driven piers, and the overall height of the array is not expected to exceed 15 feet above the existing ground surface at maximum tilt. The Project will interconnect to the existing Pacific, Gas, and Electric electrical distribution system adjacent to the site along East Comstock Road.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Galaxy Solar PV and Storage Project by Galaxy Solar Storage, LLC (Terra-Gen)
Solicitation # PP25404
The Galaxy Solar PV and Storage Project is a large-scale renewable energy initiative led by Galaxy Solar Storage, LLC (Terra-Gen) to develop a 600-megawatt photovoltaic solar facility with up to 4 gigawatt-hours of energy storage capacity on approximately 3,519 acres in southeastern Kern County, California. The project spans 184 privately owned parcels across unincorporated land near Mojave and California City, adjacent to State Route 58, and requires extensive land use modifications including zone changes from A-1 (Limited Agriculture) to A (Exclusive Agriculture) across multiple maps, conditional use permits for solar operations and temporary construction areas, general plan amendments to remove road reservations and reclassify land use designations, and zone variances to accommodate substandard parcel sizes. The project includes the installation of solar panels, inverters, medium-voltage collection lines, transformers, a 230-kV switchyard, an operations and maintenance facility, telecommunications infrastructure, and offsite water storage tanks. A generation-tie line will connect the facility to the existing Windhub Substation, enabling delivery of renewable power to the grid. To facilitate development, multiple vesting tentative parcel maps propose the merger and re-subdivision of 118 parcels into six consolidated parcels totaling over 1,300 acres. Offsite infrastructure requires additional zoning changes and conditional use permits for an off-site switchyard and temporary staging areas. All activities are subject to compliance with Kern County zoning ordinances and environmental review under the California Environmental Quality Act, with public input gathered during a review period ending October 6, 2025. The project aligns with state mandates to achieve 100% carbon-free electricity by 2045 and relies on native revegetation, topsoil restoration, and de-compaction techniques to minimize ecological disruption. No federal contract clauses, pricing data, payment terms, or procurement evaluation criteria are included in the documentation, indicating this is a land use and environmental permitting process rather than a federal acquisition. The primary point of contact is Mark Tolentino of Kern County Planning and Natural Resources Department, with Simon Day of Terra-Gen serving as the developer’s representative.
Kern County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

17 days ago

DEADLINE

in 2 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for Engineering, Procurement, and Construction (EPC) services to design, install, and maintain commercial-scale solar photovoltaic systems at the Eagleville Campus. The project aims to supply approximately 95 percent of the campus electricity needs, totaling 6,800 MWH annually, through a Power Purchase Agreement (PPA) utilizing FEOC-compliant equipment. The scope of work includes structural and geotechnical assessments, permitting, sourcing equipment, and securing interconnection agreements with PECO. While the County has identified potential ground and roof locations, the Montgomery County Correctional Facility buildings are excluded from installation due to ongoing roof replacements. The selection process is based on Best Value, prioritizing firms with demonstrated experience in at least five similar projects and a preference for those employing at least three NABCEP PVIP-Certified professionals. Proposers must submit separate technical and cost proposals via the Bonfire portal, including a current W9 and completed certifications regarding business status and conflicts of interest. The project may leverage approximately 160,000 dollars in remaining federal grant funding, requiring the selected contractor to coordinate with the County's existing engineering consultant and adhere to federal grant addendums, including Build America Buy America requirements and strict audit and record retention policies. Final acceptance of the system requires a successful commissioning process, including drone thermal imaging and the procurement of Permission to Operate.
Montgomery County Pa

POSTED

22 days ago

DEADLINE

in 6 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a Solar Generating Facility at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town's primary objective is to establish a long-term land lease or Power Purchase Agreements to generate financial benefits, energy savings, and landfill protection for a period not to exceed 30 years, with a suggested start date in Spring 2027. Proposals are due by 12:00 PM EST on October 8, 2026, and must include a plan of services, conceptual site plan, project schedule, and a proposed financial structure. The Town will select the most advantageous proposal based on a combination of price, technical and management capacity, past performance on similar projects, and specific criteria regarding landfill and forest protection. Minimum qualifications require that at least one primary staff member be a registered Massachusetts Professional Engineer (Civil) for at least 10 years, and key personnel must have at least seven years of related experience. Selected developers will be responsible for all permitting, interconnection risks, and environmental compliance. Key requirements include providing decommissioning financial security via an irrevocable letter of credit or surety bond, and maintaining comprehensive insurance coverage, including at least 5 million dollars in Commercial General Liability. All procurement is conducted pursuant to M.G.L c. 30B S.16, and proposers must submit various certifications regarding non-collusion, non-discrimination, and tax compliance.
TORTH - Town of Royalston - Town Hall

POSTED

23 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS