PA-2500218 (C)

Forecast
State & Local
Solicitation #
PA-2500218

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project PA-2500218 (C) is a Conditional Use Permit application for the development of a 14.5-acre ground-mounted photovoltaic energy facility located at 18133 E Comstock Road in Linden, San Joaquin County, California. The facility is designed to generate up to 3 megawatts of solar energy using photovoltaic modules, inverters, and single-axis tracker technology to maximize collection efficiency. The system will be anchored by driven piers with a maximum height of 15 feet and will interconnect with the Pacific Gas and Electric electrical distribution system along East Comstock Road. The project is subject to a Mitigated Negative Declaration, indicating that proposed mitigation measures reduce potential environmental effects to less than significant levels. Compliance requirements include adherence to the San Joaquin County Multi-Species Habitat Conservation and Open Space Plan, the California Building Code for seismic safety, and the Society of Vertebrate Paleontology guidelines. Final structural design and construction must be approved and inspected by the City Building Inspector and a California-registered professional geotechnical engineer to ensure all seismic and site-specific engineering standards are met.

General Info

San Joaquin County permit for a 3MW ground-mounted solar facility in California.

Place of Performance

North Duncan Road and North Cox Road, CA, 95236

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

5 mandatory

5 requirements in 1 area

  • Technical5 · 5 must
    001

    SJMSCP Eligibility Submission

    PA-2500218 (C) Initial Study
  • 4 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 5 requirements

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
A Conditional Use Permit for 14.5-acre ground-mounted photovoltaic energy facility. The project will generate up to 3 megawatts of solar energy utilizing photovoltaic solar modules, inverters, and appurtenant electrical equipment and distribute the useable energy to the electric grid. The modules will be mounted on a steel racking system employing single-axis tracker technology that efficiently tracks the sun’s movement throughout the day and maximizes the efficiency of solar collection. The rows of modules will be anchored in the ground using driven piers, and the overall height of the array is not expected to exceed 15 feet above the existing ground surface at maximum tilt. The Project will interconnect to the existing Pacific, Gas, and Electric electrical distribution system adjacent to the site along East Comstock Road.

Similar Contracts

Same NAICS industry code

NAICS: 221114
SLED
RPCA Solar 17, LLC Project (PSP 25-092)
Solicitation # PSP 25-092
RPCA Solar 17, LLC is developing a small-scale utility solar generation facility in unincorporated Tulare County, California, near Porterville. The project will be situated on approximately 13.6 acres across three parcels totaling 17.6 acres within the Exclusive Agricultural zoning district. The project sponsor has secured a long-term lease agreement with the property owner, the Antoine Bechara Revocable Trust, to facilitate the construction and operation of the facility. Once complete, the project will generate up to 3 megawatts of alternating current clean energy using single-axis tracking solar modules. The generated power is intended to be sold to the Clean Power Alliance through a long-term Power Purchase Agreement, with interconnection provided via Southern California Edison's existing electrical distribution system. The facility will feature a seven-foot chain-link fence with wildlife-permeable design elements and will be accessed by a 20-foot wide all-weather gravel road. Electrical connections will transition from existing overhead lines to underground utility runs leading to a central power station and transformer. The site will be operated remotely with professional operations and maintenance contractors managing the facility and native groundcover restoration. Environmental compliance is being managed through an Initial Study and Mitigated Negative Declaration, with all mitigation measures incorporated into a formal Monitoring and Reporting Program to ensure the protection of the surrounding agricultural and rural residential landscape.
Tulare County

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Request for Information Relative to the Process of Renewable Energy Programs
Solicitation # 510-27
The New Hampshire Department of Administrative Services, Bureau of Purchase and Property, has issued Request for Information (RFI) 510-27 to gather data on renewable energy programs, specifically focusing on solar projects within the state. The objective is to evaluate options such as Community Solar, Power Purchase Agreements, and Group Net Metering to refine the state's energy portfolio and reduce fossil fuel reliance in alignment with Executive Order 2016-03, NH RSA 362, and PUC 909. The state is seeking information on renewable energy rebate solutions and the availability of projects that are either immediate or expected to come online within the next six years. This solicitation is for informational purposes only and does not commit the state to issuing a formal Request for Proposal or awarding a contract. Responses are due by December 16, 2026, at 9:00 AM EST and must be submitted via email to [email hidden], with a maximum file size limit of 7 MB. Submissions must include a detailed company profile and be clearly marked with the RFI number, due date, and the purchasing agent's name. There is no set-aside status for this solicitation. All responses are subject to public records laws, and any proprietary information must be submitted as a separate redacted copy with a supporting rationale letter.
Das Purchasing (statewide Bids & Contracts)

POSTED

11 days ago

DEADLINE

in 19 days
View Details
NAICS: 221114
SLED
Solar Photovoltaic System(s)
Solicitation # CSCU 27-1409465
Connecticut State Colleges and Universities (CSCU) is soliciting proposals from qualified developers to provide a turnkey solution for the financing, design, installation, operation, and maintenance of solar photovoltaic (PV) systems. The project spans multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College campuses at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will deliver electricity to these institutions under a Power Purchase and Licensing Agreement (PPA) with a 20-year base contract term, potentially extending up to 25 years. The scope includes all engineering, materials, and labor, with a requirement that the contractor submit the project to Eversource’s large LREC/ZREC program. The project is anticipated to commence on February 8, 2027, with a completion date of December 31, 2028. Proposals are due by December 16, 2026, and will be evaluated based on factors such as generation cost per kilowatt-hour, minimum yearly kilowatt-hours provided, project readiness, and the strength of funding commitments. Technical requirements include a minimum 30-year design life for structural components, certification by Underwriter Laboratories (UL), and approval from the State Fire Marshal and FM Global. This solicitation is not a set-aside.
DAS Procurement

POSTED

24 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS