Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tully Road Resurfacing 2027

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Harney Lane, Eight Mile Road, Frazier Road, Tokay Colony Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A

Full Description

Show more
TULLY ROAD RESURFACING 2027 Project Description Project Location: Tully Road: Eight Mile Road to Harney Lane. See attached Vicinity Map. Project Justification: The original construction date and existing structural section are unknown. The roadway is 20 feet wide. The road has been periodically chip sealed by Road Maintenance with the most recent in 2015. No other construction details are available. The existing paved surface is oxidized with potholes throughout, rutting and areas of transverse and alligator cracking are present throughout the project limits. Scope of Work: The project will consist of: 1. Resurfacing existing roadways (20 feet width) 0.25 feet on Tully Road with Hot Mix Asphalt (HMA) (Type A). 2. Repairing pavement structural failure areas with full depth of 0.25 feet HMA (Type A). 3. Replenishing 6-foot-wide Shoulder Backing: 2 feet (8%) and 4 feet to conform. 4. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 5. Constructing 8-foot HMA (Type A) driveways. 6. Performing Earthwork (Miscellaneous Areas) to remove high shoulder areas. 7. Replacing 16-inch, 18-inch, and 36-inch corrugated metal pipes. Environmental Setting: In these portions of the San Joaquin County, land usage is primarily agricultural. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

More opportunities from California → San Joaquin County

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS