Byron Road Resurfacing
Forecast
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
NAICS
N/A
Place of Performance
Hansen Road, Reeve Road, San Jose Road, Von Sosten Road, CASet-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Full Description
Show more
BYRON ROAD RESURFACING
Project Description
Project Location:
Byron Road: Wicklund Road to 649 feet north of West Grant Line Road; 1,073 feet south of West Grant Line Road to Tracy City Limits. See attached Vicinity Map.
Project Justification:
The original construction dates are unknown. The section of roadway south of Grant Line Road (West) was constructed by the State of California and functioned as Highway 50 until it was relinquished to the County in the late 1950's. The portion of roadway from the Alameda County line to Grant Line Road (West) was reconstructed 32 feet wide in 1964 with 1.25 feet of Aggregate Subbase (ASB), 0.67 feet of Aggregate Base (AB), 0.29 feet of Asphalt Concrete (AC). In 1970, the roadway was widened to 49 feet to provide a turn lane for southeast bound traffic to turn onto Grant Line Road (East) and resurfaced with 0.2 feet AC from Grant Line Road (East) to Grant Line Road (West). In 1990, Byron Road was resurfaced with 0.30 feet AC from Grant Line (E) to 2.5 miles northwest. In 2008, approximately 95% of the project (Wicklund Road to Interstate 205) was widened from 32 feet to 36 feet, all failure areas repaired at Grant Line Road (East) with full depth concrete and resurfaced roadway with 0.25 feet AC over 24 feet pavement with reinforcing fabric. In 2014, the intersection at Byron Road and Grant Line Road (East) was resurfaced with 0.08 feet to 0.25 feet overlay AC. A roundabout was constructed in 2022 at the Byron Road/Grant Line Road (West) intersection. This road is currently included as part of the 7-year chip seal cycle with the latest being Chip Sealed in 2019.
Within the specified project limits, the prevailing condition of the pavement surface is characterized by potholes and cracking.
Scope of Work:
The project will consist of:
1. Resurfacing existing roadway (36 feet wide) with 0.17 feet Hot Mix Asphalt (HMA) (Type A).
2. Constructing tapered HMA edges to protect the edge of pavement.
3. Repairing pavement Structural failure areas with full depth 0.50 feet of HMA (Type A).
4. Replenish the existing graveled shoulders with 6-foot-wide Shoulder Backing, comprising 2 to 4 feet at an 8%.
5. Applying Penetration Treatment along the inside of the curves and at all intersection radii plus 50 feet or to conform.
6. Constructing 8 feet HMA (Type A) driveways.
7. Installing PCC at the left-hand turn lane on Byron Road south bound into Grant Line east bound.
8. Placing back thermoplastic stripes and legends.
Environmental Setting:
In these portions of the San Joaquin County, land usage is primarily agricultural.
There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st.
Beneficiaries:
The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.
More opportunities from California → San Joaquin County
Same awarding agency
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS