Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Thornton Community Improvements

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Oak Street, Thornton Road, Manor Avenue, Mokelumne Avenue, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A

Full Description

Show more
THORNTON COMMUNITY IMPROVEMENTS Project Description Project Location: West Thornton Road: Mokelumne Avenue to North Thornton Road; Sacramento Blvd: West Thornton Road to New Hope Elementary School; North Thornton Road: West Thornton Road to 255 feet south of West Thornton Road; West Oak Street: Sacramento Boulevard to 120 feet east of Sacramento Boulevard. See attached Vicinity Map. Project Justification: West Thornton Road is a 32-foot-wide minor collector road. The Overall Condition Index (OCI) rating in 2025 was 67.97. The first recorded appearance of West Thornton Road was in the 1912 Thornton Subdivision Plan. In 1961, the road was reconstructed with a 0.17 feet Asphalt Concrete (AC)/ 0.50 feet Aggregate Base (AB)/0.50 feet subbase pavement section. Maintenance and rehabilitation activities have included chip seal treatments in 1985 and 2007, storm drain piping installation in 1997, and resurfacing in 1975 and 2019 with 0.25 feet of AC. Sacramento Boulevard is a 24-foot-wide local road. The OCI rating in 2025 was 86.28. The first recorded appearance of West Thornton Road was in the 1912 Thornton Subdivision Plan. Reconstructed in 1969 with 0.20 feet AC/ 0.35 feet AB/ 0.55 feet lime treated subbase. Between 1989 and 1992, three storm drain improvement projects were completed along the corridor, and the roadway was later resurfaced in 2002 with 0.25 feet AC and a pavement reinforcing fabric. North Thornton Road is a 24-foot-wide minor collector road. The OCI rating in 2025 was 65.84. The first recorded appearance of West Thornton Road was in the 1912 Thornton Subdivision Plan. Drain lines were installed in 1997. The roadway at the project intersection received a 0.25 feet AC grind and replace in 2014. Additional pavement preservation work included a slurry seal in 2011 and 2018. West Oak Street is a 22-foot-wide local road. The OCI rating in 2025 was 91.21. The original construction date is unknown. In 2006, existing structural section was found to be 0.35-inch AC over 0.40 feet AB by exploratory drilling. In 2006, the roadway received a 0.17-foot resurfacing with a pavement reinforcing fabric. The approaching legs of the existing Sacramento Boulevard, West Thornton Road, North Thornton Road, and Oak Street intersection are misaligned. There is a lack of pedestrian and bicycle facilities within the project limits. All these factors are contributing to safety and accessibility challenges for residents, students, and local businesses. Scope of Work: The project will consist of: 1. Constructing a roundabout with a concrete buffer, crosswalk connectivity with concrete medians, and ADA ramps at corners at the intersection of West Thornton Road, Sacramento Boulevard, West Oak Street and North Thornton Road. 2. Constructing a 5 ½ feet wide concrete pedestrian path (620 linear feet) on the south side of West Thornton Road, from the roundabout intersection west to Mokelumne Avenue. 3. Constructing a new curb ramp at the southeast corner of the West Thornton Road/Mokelumne Avenue intersection. 4. Widening Sacramento Boulevard to construct a 10 feet wide buffered Class I shared-use path (820 linear feet) on the west side, creating connectivity between the roundabout intersection and New Hope Elementary School. The bike lane structural section is 3-inch Hot Mix Asphalt (HMA) (Type A) over 9-inch Class 2 AB or 3-inch HMA (Type A) over existing sections. Structural section of the bike lane shoulder is 12-inch composite granite. 5. Constructing a 10-foot-wide sidewalk at the southwest corner of the roundabout intersection to connect to the existing sidewalk at the Thornton Branch Library. Structural section for new sidewalk will be 4-inch Portland Cement Concrete (PCC) over 4-inch Class 2 AB. 6. Installing 4 Type 1 curb inlet catch basins, 1 18-inch storm drain inlet catch basin, 5 storm drain maintenance holes, and 81 linear feet of 18-inch Reinforced Concrete Pipe (RCP). Structural section for new sidewalk will be 4-inch PCC over 4-inch Class 2 AB. 7. The roundabout consists of a 21-to-28-foot travel way with a structural section of 4-inch HMA (Type A) over 12-inch Class 2 AB, vehicular concrete apron with a structural section of 0.8 feet PCC over 1 foot Class 2 AB, and top of roundabout with a structural section of 4-inch stamped concrete. 8. Relocating three (3) utility poles (1 at Mokelumne Avenue and Thornton Road, 1 at Thornton Road and Tower Road, 1 at Thornton Road and Sacramento Boulevard) and removing six (6) trees (5 at Thornton Road and Sacramento Boulevard, 1 near Pine Street and Sacramento Boulevard). Environmental Setting: In these portions of the San Joaquin County, land usage is primarily residential. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these well-maintained roads and pedestrian and bicycle improvements. Overall, there will be reduced maintenance concerns and more reliability within the project area.

More opportunities from California → San Joaquin County

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS