Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

LAS CAMAS SOLAR PROJECT

Forecast
2021080196State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Las Camas Solar Project in western Merced County, California, involves the construction and operation of a 200-megawatt alternating current ground-mounted solar photovoltaic power plant. The facility includes solar PV panels with single-axis trackers, a lithium-ion battery energy storage system, a solar project substation, a 230-kV gen-tie line, and a supervisory control and data acquisition system. As part of the infrastructure, the project includes the construction of a 20-foot wide and 96-foot long culverted road crossing within an unnamed stream, authorized under Streambed Alteration Agreement EPIMS-61527-R4 pursuant to Section 1602 of the Fish and Game Code. The project is subject to strict environmental compliance and mitigation measures overseen by the California Department of Fish and Wildlife. This includes an Incidental Take Permit for the protection of state-threatened species such as the San Joaquin kit fox, Swainson's hawk, and western burrowing owl under the California Endangered Species Act. To offset the impact on 1,269 acres of habitat, the project provides for the permanent conservation of 2,048 acres of high-quality occupied habitat, supported by a CDFW-approved monitoring program and adaptive management plan. Formal determinations confirm that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife.

General Info

Construction of a 200MW solar plant and battery system in Merced County, California.

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Merced County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Merced County
Office AddressN/A
Contacts
Bonna NewellSr. Environmental Scientist (Spec.)
Tiffany HoCommunity & Economic Development Dept.

Full Description

Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement number EPIMS-61527-R4, pursuant to Section 1602 of the Fish and Game Code to the Permittee EDPR CA Solar Park III, LLC. The Project includes activities related to the construction of a 20-foot wide and 96-foot-long culverted road crossing within an unnamed stream located within the greater Las Camas solar facility.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → Merced County

Same awarding agency

NAICS: 237990
SLED
Black Rascal Flood Control ProjectThe Black Rascal Flood Control Project, led by Merced County, involves the construction of flood control infrastructure within the Black Rascal Creek watershed in California. The scope of work includes the creation of a flood detention basin, a basin outlet structure, a 350-foot spillway, and the realignment of a 1,700-foot section of Black Rascal Creek. Additional requirements include the installation of drainage facilities such as culverts and headwalls, access road work, and the restoration of disturbed areas using weed-free native seed mix. A key utility component involves the relocation of a PG&E electric utility pole 100 feet to the north and the authorization of six existing poles within the expanded floodway under Permit No. 20023. The project is subject to strict environmental and regulatory compliance, including the California Endangered Species Act Incidental Take Permit No. 2081-2021-096-04 for the protection of the California tiger salamander and Swainson's hawk, and Lake and Streambed Alteration Agreement EPIMS-MER-26316-R4. Construction of the detention basin is estimated to take 18 months over a two-year period, with work restricted to the dry season between April 1 and October 31 and conducted during standard 8-hour day shifts. The project also requires permits from the U.S. Army Corps of Engineering under Sections 404 and 408, as well as approval from the Central Valley Flood Protection Board.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Atwater Jordan Road at Atwater Canal Bridge Replacement ProjectThe Atwater Jordan Road at Atwater Canal Bridge Replacement Project, managed by the Merced County Department of Public Works, involves the replacement and widening of Bridge No. 39C-0286 over the Atwater Canal in unincorporated Merced County, California. The project aims to improve public safety by widening the existing bridge by approximately 10 feet along its current alignment to accommodate two 11-foot lanes and 3-foot shoulders on each side. Key construction elements include the installation of new concrete barrier bridge rails, the application of rock slope protection to the embankment to mitigate scour, and potential improvements to canal access roads. The project is funded through the federal Highway Bridge Program, with construction anticipated to occur between October 2027 and March 2028. Environmental compliance is being managed under the California Environmental Quality Act (CEQA), with the lead agency issuing a Mitigated Negative Declaration. The project has undergone review by the California Department of Fish and Wildlife and other regulatory bodies to address impacts on biological resources, including special-status species such as the Swainson's hawk and northwestern pond turtle. Mitigation measures have been established to address air quality, noise, hydrology, and cultural resources. Administrative oversight is led by Supervising Engineer Alvaro Buenrostro, and the project is supported by GPA Consulting.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Merced County Streams Group Flood Control Channel Maintenance Program ISMND
Solicitation # WA2026035
The Merced County Streams Group Flood Control Channel Maintenance Program involves two primary authorizations for work along Bear Creek in California. Under Minor Alteration No. WA2025151, the project focuses on stabilization and restoration across seven sites. Key activities include the installation of thousands of cubic yards of rock slope protection and compacted fill, erosion control measures, the removal of invasive vegetation, and the repair of bike paths. These efforts are designed to restore bank slopes to their original line and grade and return access areas to pre-project conditions, specifically addressing damage from the January 2023 flood events. Complementing these restoration efforts, Minor Alteration No. WA2026035 authorizes geotechnical investigations at four erosion repair sites. This scope of work includes the execution of twelve vertical exploratory borings, each 8 inches in diameter and 25 feet deep, along with eight Dynamic Cone Penetrometer tests to assess the soil and determine specific erosion repair needs. Both projects are conducted under the California Code of Regulations, Title 23, Article 3, Section 6, and have been approved by the Central Valley Flood Protection Board following the preparation of a Mitigated Negative Declaration to ensure no significant environmental effects.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS