Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

VEGA SES 2, 3, and 5 Solar Energy Project

Forecast
2081-2025-025-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vega 5 Solar Energy System Project, executed by Cedar 2 SES, LLC, involves the construction, operation, and maintenance of a 50-megawatt photovoltaic solar energy facility and a 50-MW battery energy storage system in Imperial County, California. The project scope includes the installation of a substation, medium-voltage collection lines, a high-voltage generation tie transmission line, access roads, and retention basins. Located near Calipatria, the project site specifically impacts Siphon 5 and various unnamed tributaries. The project is governed by several critical environmental authorizations, including Lake and Streambed Alteration Agreement EPIMS-IMP-60331-R6 pursuant to Fish and Game Code section 1602 and Incidental Take Permit No. 2081-2025-025-06 under the California Endangered Species Act. These permits authorize the incidental take of the western burrowing owl and require strict adherence to a Mitigation Reporting or Monitoring Plan adopted by the California Department of Fish and Wildlife. The project has been determined to have no significant environmental effect within the jurisdiction of the CDFW, provided that all specified mitigation measures and environmental review compliance requirements under Public Resources Code section 21108 are met.

General Info

Cedar 2 SES builds 50MW solar and battery facility in Imperial County, California.

Place of Performance

Calipatria, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-IMP-60331-R6, pursuant to Fish and Game Code section 1602 to Cedar 2 SES, LLC. The Project includes the construction of a 50-megawatt (MW) photovoltaic solar energy facility, a 50-MW battery energy storage system, solar collection lines, and an access road, all which impact Siphon 5 and/or the unnamed tributaries.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Request for Information Relative to the Process of Renewable Energy Programs
Solicitation # 510-27
The State of New Hampshire, through the Department of Administrative Services Bureau of Purchase and Property, has issued Request for Information (RFI) 510-27 to gather data on renewable energy programs, specifically focusing on solar projects within the state. The objective is to evaluate various frameworks such as Community Solar, Power Purchase Agreements, and Group Net Metering to move away from an ad hoc approach and fortify the state's renewable energy portfolio. This effort aligns with NH RSA 362, PUC 909, and Executive Order 2016-03, which encourages the integration of renewable energy into electricity supply contracts to reduce fossil fuel reliance. Interested vendors must submit responses by December 16, 2026, at 9:00 AM EST via email to [email hidden]. Submissions must include a detailed company profile and provide solutions for expanding the state's role in solar-related renewable energy rebates, as well as information on projects available for immediate consideration or those coming online within the next six years. As this is an RFI, it does not commit the state to award a contract or issue a formal Request for Proposal, and the state is not liable for any costs incurred during the response process. All submissions are subject to public records laws, and any proprietary information must be submitted with a redacted copy and a separate letter of justification.
Das Purchasing (statewide Bids & Contracts)

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 221114
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

13 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Solar Photovoltaic System(s)
Solicitation # CSCU 27-1409465
Connecticut State Colleges and Universities (CSCU) is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College campuses at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a Power Purchase and Licensing Agreement (PPA) with a 20-year base term, not to exceed 25 years total. The scope includes all engineering, procurement, and construction for roof-mounted or ground-mounted systems, with specific nominal capacities of 300-500KW AC anticipated for garage-mounted canopies at CCSU and ECSU. The contractor is also required to submit for Eversource’s large LREC/ZREC Program, using an assumed value of $60/REC for pricing proposals. Proposals are due by December 16, 2026, at 2:00 PM EST and will be evaluated based on generation cost per kilowatt-hour, minimum yearly kilowatt-hours provided, project readiness, funding strength, and the proposer's experience with similar projects. Technical requirements mandate a minimum 30-year design life for structural components, UL certification for equipment, and approvals from the State Fire Marshal, DCS Office of State Building Official, and FM Global. The project is expected to commence on February 8, 2027, with a completion deadline of December 31, 2028. Awardees must comply with various Connecticut State Executive Orders, ethics laws, and non-discrimination statutes, and provide monthly invoicing for electricity delivered.
DAS Procurement

POSTED

14 days ago

DEADLINE

in 29 days
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

18 days ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Imperial County

Same awarding agency

NAICS: 541620
New
SLED
Imperial County Lithium Valley Specific Plan
Solicitation # 2023120104
The Imperial County Lithium Valley Specific Plan (LVSP) is a comprehensive land use and zoning initiative authorized by Senate Bill 125 to develop lithium resources and renewable energy infrastructure within the Salton Sea Known Geothermal Resource Area. Spanning approximately 51,620 acres, the project aims to establish an environmentally conscious employment hub by streamlining the permitting process for geothermal energy production and lithium extraction, processing, and manufacturing. The plan introduces various land use designations, including Green Industrial, Manufacturing, Logistics, and Conservation, while incorporating an Agricultural Overlay to balance industrial growth with the preservation of prime farmland. This initiative is designed to support the national production of sustainable energy technologies, enhance local economic stability through excise and property taxes, and fund Salton Sea restoration and community benefits. The project is governed by a Program Environmental Impact Report (PEIR) and a Water Supply Assessment to ensure compliance with the California Environmental Quality Act and Senate Bill 610. Key operational requirements include a 40 percent local hiring goal for construction workers, the payment of prevailing wages, and strict adherence to Cal/OSHA and OSHA safety standards for hazardous materials and excavation. Environmental protections are prioritized through the use of qualified biologists for wildlife surveys, rigorous dust control measures, and the protection of sensitive cultural resources. The project involves extensive coordination with state agencies, including Caltrans for transportation impacts, the California Energy Commission for geothermal permitting, and the Department of Toxic Substances Control for hazardous waste management.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 624229
SLED
NHHA (National Healthcare & Housing Advisors) CUP#26-0001, IS#26-0001
Solicitation # CUP26-0001
The applicant, National Healthcare & Housing Advisors, LLC, has requested a Conditional Use Permit to operate an Interim Recuperative Care and Transitional Housing facility within the Imperial Center Specific Plan Area, asserting that the proposed use is functionally analogous to an extended-stay hotel with integrated social services—a use already recognized under the plan. The facility will span approximately 27,000 square feet across two buildings, divided into three 9,000-square-foot suites, and will serve 80 to 100 clients while employing up to 50 local staff members. Operations will run continuously, 24 hours a day, seven days a week. Services include day habilitation, post-hospitalization recuperative care, behavioral health support, community health worker programs, a sobering center, enhanced care management, and street medicine, all aligned with NHHA’s CalAIM program aimed at achieving permanent housing stability for participants. Clients may receive services for an initial 90-day recuperative period, with the possibility of extending housing support for an additional six months. The project falls under the same regulatory review framework applied to hotels and transitional housing in the area, and its approval hinges on securing the conditional use permit, designated as CUP#26-0001.
Other Community Housing Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Heber 1 Parasitic Solar Energy ProjectThe Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.
Solar Electric Power Generation

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
PM02516/IS25-0010 Edward S. & Linda L. Menvielle
Solicitation # PM#02516/IS#25-0010
Project PM#02516/IS#25-0010 involves the subdivision of a 214.31-acre agricultural property located at 1446 Carr Road in Calexico, California, into three legal parcels for family estate planning. The resulting subdivision will consist of Parcel 1 at approximately 82.65 acres, Parcel 2 at 60.69 acres, and Parcel 3 at 70.97 acres. The property will remain in active agricultural production with direct legal and physical access provided via Carr Road. The Imperial County Planning Commission approved the project on July 23, 2025, following an Initial Study and Negative Declaration under the California Environmental Quality Act which concluded that the project would not result in significant environmental effects. The project is administered by the Imperial County Planning and Development Services Department and requires the submission of a Parcel Map prepared by a California Licensed Land Surveyor or Civil Engineer to the Department of Public Works for review and recordation. Technical requirements for the survey include adherence to the North America Datum of 1983 and connections to at least two Continuously Operating Reference Stations of the California Real Time Network. Additionally, the applicant must provide a tax certificate from the Tax Collector's Office, a subdivision guarantee no older than three months, and file a corner record with the county surveyor. Compliance with standards from the Imperial Irrigation District and the Imperial County Fire/OES Department is mandatory to ensure all impacts remain less than significant.
Land Subdivision

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS