Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

The Towers LLC (CUP26-0006/IS26-0007)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Towers, LLC is proposing to construct a 120-foot-tall monopole wireless communications facility at 307 E Winslow Rd, Niland, CA 92257, within the A-2-RE zoning district, subject to approval of a Conditional Use Permit. The facility will occupy a 50-foot by 50-foot fenced lease area in the northwest section of the parcel and is intended to address a critical gap in Verizon’s 5G and 4G LTE network coverage along Highway 111 in Calipatria, Imperial County. The tower will support Verizon equipment including multiple antennas, RRUs, a microwave link, GPS antenna, cabling, and auxiliary hardware, all housed within the secured enclosure. The site will also include ground-mounted equipment such as radio cabinets, an equipment canopy, a fiber box, a 200A ILC cabinet, a backup diesel generator, raised concrete pads, and utility service components, all placed within the fenced perimeter. Access to the site will be via an 180-foot-long, 12-foot-wide gravel road, and an adjacent Imperial Irrigation District transformer will be installed to support power needs. The facility does not require water or sewer connections. The design accommodates future co-location by up to two additional wireless carriers, adhering to county code provisions encouraging shared infrastructure. The entire site is enclosed by a six-foot chain-link fence, and no residential or commercial water or sanitary services are needed for operations.

General Info

Towers, LLC to build 120-foot monopole for Verizon’s 5G/4G coverage on Highway 111, with co-location potential and fenced site.

Agency

California → Imperial County

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Winslow Road, CA, 92257

Set-Aside

NONE

Documents

(4)

CUP26-0006 IS26-0007 The Towers LLC Environmental Summary

PDFenvironmental-summary

CUP26-0006 IS26-0007 The Towers LLC Notice of Intent

PDFnotice-of-intent

CUP26-0006 IS26-0007 The Towers LLC Wireless Communications Facility Notice of Completion

PDFnotice-of-completion

CUP26-0006 IS26-0007 The Towers LLC Environmental Initial Study and Negative Declaration

PDFenvironmental-initial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
Contacts
Isara Galvez & Rocio YeePlanner I / Planner II

Full Description

Show more
The applicant, The Towers, LLC, is proposing to build a Wireless Communications Facility (WFC) at 307 E Winslow Rd., Niland, CA 92257, which consists of a 120-foot-tall monopole tower and related equipment within a 50-foot by 50-foot leased and fenced area at the northwest portion of the above-mentioned parcel. The proposed WCF would be developed, constructed, owned, and operated by The Towers, LLC. The proposed tower is located within the A-2-RE Zone, in which Communication Towers are allowed upon approval of a Conditional Use Permit (CUP #26-0006) under Title 9, Division 5, Chapter 8, Section 90508.02 (r). According to the applicant, the proposed WCF is designed to house the equipment necessary to fill a significant gap in Verizon's 5G and 4G LTE coverage experienced by its customers in Imperial County, more specifically within Calipatria along Highway 111. The tower would contain Verizon equipment with two (2) MX08FIT665-02E antennas, two (2) AIR3283 antennas, two (2) AIR6419 antennas, two (2) 4490 RRU's, one (1) 6' microwave, two (2) OVP boxes, one (1) GPS antenna, required antenna cabling, and HCS jumpers. The 2,500 sq. ft. lease area will be surrounded by a 6-foot-high chain link fence. Space for the future co-location of two additional wireless carriers has been made available on the proposed tower as encouraged under Title 9, Division 24. The ground equipment will also be contained within the fenced area, including (2) Ground Mounted Radio Cabinets, (1) Equipment Canopy, (1) Fiber Box, (1) 200A ILC Cabinet, (1) Manual Service Light Switch Timer, (3) Service Lights, (1) Back-Up Diesel Generator, (2) Raised Concrete Pads, Cable Ice Bridge, Utility Backboard And Multi-Meter Utility Service mounted on concrete pad. Access to the lease area is being proposed to be a 180-ft-long and 12-ft-wide gravel road. A proposed Imperial Irrigation District (IID) transformer will be added adjacent to the lease area. Water and sewer services are not required for the proposed facility.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237130
New
Federal
Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MT
Solicitation # W912DW26S1CE0
The U.S. Army Corps of Engineers, Seattle District, is issuing this Request for Information to gather market intelligence for the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base, Montana. This critical enabling project supports the modernization of the land-based intercontinental ballistic missile force by constructing a comprehensive utilities distribution system, including electrical distribution and substation expansion, water and wastewater systems, natural gas service, and a fiber-optic telecommunications backbone. The scope also includes associated site work such as grading, drainage, and access paving. The project is estimated to cost between 160 million and 200 million dollars with an anticipated period of performance of approximately 1,278 calendar days. Because this infrastructure is on the critical path for the overall Sentinel beddown, any schedule delays will impact all subsequent facility construction. The government intends to utilize Other Transaction Authority under 10 U.S.C. section 2808a, meaning the agreement will not be subject to the Federal Acquisition Regulation or standard small-business set-aside rules. The proposed acquisition strategy employs a Construction Management at Risk approach divided into two phases: a preconstruction collaborative phase for constructability reviews and cost development, followed by an at-risk construction phase based on a negotiated Guaranteed Maximum Price. Design is nearly complete and is being managed by Jacobs Engineering, who will remain the Designer of Record. Interested parties must respond via an online questionnaire and may submit a supplemental capabilities statement of no more than five pages to Kyla Couch by 10:00 AM Pacific Time on August 28, 2026. Selection will be based on a trade-off process evaluating qualifications, past performance, proposed approach, commercial terms, and price.
W071 Endist Seattle

POSTED

1 day ago

DEADLINE

in 13 days
View Details