Revised Initial Study and Mitigated Negative Declaration Use Permit 24-0009

Forecast
Use Permit 24-0009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Battle Creek Bottom Road Solar Project is a 3-megawatt alternating current solar energy facility to be constructed on approximately 25 acres of a 376-acre parcel in Shasta County, California, within the Eastern Upland Planning Area under the RB General Plan designation. The project will utilize single-axis tracking solar modules, steel racking systems anchored by driven piers, and string inverters to generate electricity, with a maximum structure height of 15 feet above ground. Power will be delivered to the Pacific Gas and Electric Company’s existing distribution system through an underground medium voltage line and pole-mounted infrastructure under a long-term Power Purchase Agreement. Supporting site improvements include a 250-kW inverter, medium voltage transformer, chain-link security fencing, and an improved access driveway to Wilson Hill Road, with landscaping planned to enhance vegetative screening along Battle Creek Bottom Road using native vegetation. Construction is expected to take six months and will require compliance with Shasta County planning regulations, CEQA environmental review standards, and state codes including Title 24 energy efficiency requirements, Alquist-Priolo earthquake fault zoning, and erosion and sediment control guidelines. The facility will be operated remotely with minimal maintenance, performed by a contracted services provider, and the site will be fully restored to its original condition upon decommissioning. The project requires a use permit issued by the Shasta County Department of Resource Management – Planning Division, which is overseeing the environmental review process under the California Environmental Quality Act. The Revised Initial Study and Mitigated Negative Declaration for Use Permit 24-0009 identifies and mitigates potential environmental impacts related to aesthetics, biological resources, wildfire risk, seismic hazards, air quality, and wetland connectivity, triggering consultations with the Paskenta Band of Nomlaki Indians and mandatory surveys for species such as Crotch’s bumble bee and the western spadefoot. Mitigations include fuel reduction plans, defensible space compliance, and a Lake and Streambed Alteration Agreement for waterway impacts. While the facility will interconnect to PG&E’s grid and generate renewable energy, no contract pricing, payment terms, invoicing methods, federal acquisition clauses, or procurement evaluation criteria are present in the documentation, as this is an environmental permitting document rather than a federal contract. All submissions, comments, and supporting studies must be provided to the Planning Division in Redding by specified deadlines tied to public hearings, and inspections will be conducted at the project site in Manton, CA, to ensure adherence to approved

General Info

3 MW solar project in Shasta County, CA, serving PG&E under long-term PPA with environmental mitigations and remote operation.

Place of Performance

Battle Creek Bottom Road and Wilson Hill Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Shasta County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Shasta County
Office AddressN/A
Contacts
Elisabeth TowersAssociate Planner
RPCA Solar 14 IncApplicant

Interested Companies (1)

Shasta County Resource ManagementCore Madera, CA

Full Description

Show more
RPCA Solar 14, LLC has requested approval of Use Permit 24-0009 to construct, operate, and maintain an unmanned approximately 25-acre private solar energy production facility that would generate up to 3 megawatts (MW) of alternating current (3.9 MW direct current) energy. The project will interconnect to Pacific Gas and Electric Company’s (PG&E) existing electrical distribution system located adjacent to the site. The project will utilize approximately 8,721 solar modules and 40 string inverters. The solar modules will be mounted to a steel racking system which will be anchored to the ground using driven steel piers. The overall height of the array will be no more than 15 feet above ground surface. Other site improvements consist of ground-mounted electrical equipment, an underground medium voltage utility line, pole mounted infrastructure to facilitate interconnection, a chain link security fence around the site equipment, and an improved driveway access to Wilson Hill Road. The project site is located at the southeast corner of the intersection of Battle Creek Bottom Road and Wilson Hill Road approximately 5 miles south of the intersection of State Highway 44 and Wilson Hill Road, Manton, CA. Assessor’s Parcel Number: 703-250-020.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → Shasta County

Same awarding agency

NAICS: 541620
New
SLED
Consulting Services for the Preparation of the 7th Cycle Shasta County Housing Element Update and Mandated General Plan Amendments
Solicitation # 27-13
Shasta County is soliciting proposals under solicitation number 27-13 for consulting services to prepare the 7th Cycle Housing Element Update and associated Mandated General Plan Amendments. The scope of work consists of two primary components, the Housing Element Update and Mandated General Plan Updates, and one optional component involving the completion of previously initiated updates for the Safety and Community Organization Elements. Key deliverables include the production of draft and final Housing Elements, a situation report for optional updates, and the coordination of a 60-day review with the State Housing and Community Development Department. The project requires full compliance with the California Environmental Quality Control Act and state housing laws to achieve timely certification and adoption. The contract will be based on the County's Standard Personal Services Agreement, with certain terms subject to negotiation. Award selection is based on the best interest of the County rather than the lowest cost. Respondents must submit electronic proposals via the County e-Procurement Portal by December 4, 2026, including a pricing breakdown that separates the optional component from the primary work. Compliance requirements include adherence to economic sanctions regarding Russia's actions in Ukraine, submission of proof of insurance, and agreement to government audits. The project is managed by Leticia Swanson and Jessica Moore in Redding, California, and requires the selected consultant to provide a detailed project schedule including milestones and public engagement opportunities.
Environmental Consulting Services

POSTED

4 days ago

DEADLINE

in 28 days
View Details
NAICS: 237310
SLED
Parkville Road at Ash Creek Bridge (No. 06-0220) Replacement Project
Solicitation # 5A45CR00700
The Parkville Road at Ash Creek Bridge Replacement Project, solicitation number 5A45CR00700, involves replacing the functionally obsolete bridge (No. 06-0220) in Shasta County, California, near Anderson. The project consists of constructing a new single-span, 102-foot-long by 27.5-foot-wide reinforced concrete cast-in-place post-tensioned box girder bridge on a new alignment south of the existing structure. To accommodate current traffic volumes and meet Shasta County and AASHTO standards, the scope includes widening roadway approaches from 16 to 22 feet, performing approximately 300 feet of approach road work on each side, replacing bridge railings with steel, and installing approach guardrails. Parkville Road will remain open during construction via a temporary detour using the existing bridge, which will be removed once the new structure is operational. The project has undergone environmental review under the California Environmental Quality Act (CEQA), resulting in a Mitigated Negative Declaration and a Notice of Determination confirming that the project will not have significant environmental effects provided that specific mitigation measures are implemented. Key environmental considerations include the protection of biological resources, specifically bat roosting habitats and migratory birds, as highlighted by the California Department of Fish and Wildlife. The contractor must adhere to strict hazardous waste protocols, including the proper labeling and disposal of treated wood waste according to California Code of Regulations Title 22 and the disposal of lead-based paint and asbestos at Class I landfills. The Shasta County Department of Public Works serves as the lead agency for this infrastructure improvement.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS