Use Permit Application No. PLN2025-0075 Saltgrass Energy Storage
Forecast
2026010021State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Stanislaus County
Place of Performance
Oak Flat Road, Patterson, CA, 95363Set-Aside
NONE
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → Stanislaus County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Stanislaus County
Office AddressN/A
Contacts
Interested Companies (1)
GDR EngineeringCeres, CA
Full Description
Show more
Request to establish a 162Mw/650MWh battery energy storage system (BESS) facility across an 18.74± acre project site located in the General Agriculture (A-2-40) zoning district. The proposed BESS facility will tie into the Pacific Gas and Electric (PG&E) Salado Substation located 451± feet to the east across the California Aqueduct via underground and overhead 115kV lines. The following equipment is proposed under this request: 136 sets of battery cubes and cabinets with each set containing eight battery cubes; 32 transformers; and 128 inverters supporting the site. The battery sets will be bolted on concrete pads. The battery sets will be placed at a setback of 150-feet from the front property line off Oak Flat Road. A 1,316 square-foot office trailer and modular restroom are proposed on-site for operation of the facility along with 15 striped parking spaces. A 3.11± acre portion on-site is proposed for a future interconnected substation for the BESS facility. Two to four full-time employees are expected to remain on-site for operation and maintenance 12 hours a day, Monday-Saturday, and on Sundays as-needed. Up to 40 visitors are anticipated on-site throughout the year. The applicant proposes a six-foot-tall chain link fence with slats around the perimeter of the project site; and screening comprised of a minimum 20± foot-wide landscape strip around the north, west and south of the project site consisting of drought tolerant trees and shrubs. Surface water via a pipeline from the Western Hills Water District will irrigate the proposed landscape and provide water for fire suppression; however, on-site fire suppression will still be required, if the project is approved. The project will take access onto County-maintained Oak Flat Road via a gravel driveway. Throughout the project site, the applicant has proposed 20± foot-wide gravel access roads around the BESS facility. Stormwater drainage will be maintained on-site via underground storage. No on-site well or septic system is proposed as part of this project.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
