Goleta Water District Corona Del Mar Water Treatment Plant Solar Power Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Water District is seeking to install solar energy arrays at the Corona Del Mar Water Treatment Plant in California. The primary objectives of this project are to offset energy costs and mitigate the impacts of emergency situations and public safety power shutdowns. The solar arrays will be situated in an existing overflow parking area, which has been identified as a location containing no environmentally sensitive habitats. This project is classified as a forecast under NAICS code 221114. It has been granted an exemption from the California Environmental Quality Act under California Code of Regulations, Title 14, Section 15304, as confirmed by a Notice of Exemption filed on November 25, 2025. Administrative oversight is managed by Daniel Brooks, the Engineering and Infrastructure Manager, with the lead agency operating out of Goleta, California.

General Info

Goleta Water District installs solar arrays at Corona Del Mar Plant under state environmental exemptions.

Agency

California → Goleta Water District

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Goleta Water District Solar Power Systems

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Goleta Water District
Office AddressN/A
Contacts
Daniel BrooksEngineering and Infrastructure Manager

Full Description

Show more
Goleta Water District (District) owns and operates the Corona Del mar Water Treatment Plant (CDMWTP). The District proposes to install solar energy arrays on the property to mitigate potential public safety power shutdowns and emergency impacts, as well as offset energy costs incurred by the District.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is seeking qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a solar generating facility at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and aims for a capacity between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town intends to enter into a long-term lease or Power Purchase Agreement for a period not to exceed 30 years, with a suggested start date in Spring 2027. The primary objectives are to generate financial benefits for the Town, ensure landfill cap protection, and manage timber and forest resources effectively. Proposals are due by October 8, 2026, and must include a plan of services, a conceptual site plan, a detailed project schedule, and a financial structure. Selection will be based on the most advantageous proposal, weighing price, technical and management capacity, past performance on similar projects, and the specific financial benefits offered to the Town. Key requirements include the provision of decommissioning financial security via a letter of credit or surety bond and comprehensive insurance coverage, including at least 5 million dollars in commercial general liability. Additionally, the developer must employ at least one primary staff member who has been a registered Massachusetts Professional Engineer (Civil) for at least 10 years.
TORTH - Town of Royalston - Town Hall

POSTED

5 days ago

DEADLINE

in 22 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-132882
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, finance, construct, operate, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill located at 6 Town Dump Road. The project aims for a capacity of 1-6 MW AC, with the Town open to proposals up to 5 MW AC including additional land clearing and the potential integration of Battery Energy Storage Systems (BESS). The objective is to establish a long-term agreement, such as a land lease or Power Purchase Agreement (PPA), for a term not to exceed 30 years that provides sustainable financial benefits to the Town. The selected developer will be responsible for all project-related costs, including permitting, interconnection, and site restoration. Proposals must be submitted by October 8, 2026, and will be evaluated based on a combination of price and qualifications, including past performance, technical capacity, and the merits of the proposed plan of services. Key requirements include the provision of a conceptual site plan, an independent timber appraisal by a Massachusetts Licensed Forester, and decommissioning financial security via a surety bond or letter of credit. Additionally, the project must comply with MassDEP regulations regarding the landfill cap, and the developer must employ a primary staff member registered as a Professional Engineer in Massachusetts for at least ten years. Award selection will prioritize the most advantageous proposal based on financial benefit to the Town, landfill and forest protection, and interconnection feasibility.
TORTH - Town of Royalston - Town Hall

POSTED

19 days ago

DEADLINE

in 22 days
View Details
NAICS: 221114
SLED
City Owned Solar Development – Brand LandfillThe City of Glendale and Glendale Water & Power are implementing the Brand Park Solar Photovoltaic System Project, which involves the construction and operation of a city-owned 1.815 megawatt ground-mount solar system. The project is located on a 2.1 acre portion of a 219 acre parcel at 1601 West Mountain Street in Glendale, California, situated within Pomeroy Canyon and the southern Verdugo Mountains. The installation will be placed on a manufactured flat pad of an inactive landfill, requiring only minor site preparation and leveling without significant grading. The infrastructure consists of 3,300 ground-mounted PV panels, transformers, inverters, and combiner panels reaching heights of approximately 6 feet 6 inches, with electrical distribution lines installed on new wood utility poles along existing access roads. The project is categorized as exempt from the California Environmental Quality Act under CEQA Guidelines Sections 15303 and 15304. To ensure environmental compliance and the protection of biological resources, the project requires adherence to a Biological Resources Assessment prepared by TRC. Mandatory pre-construction surveys must be completed before building permits are issued and construction begins, specifically targeting nesting birds, raptors, the Least Bell's vireo, special status wildlife, Crotch's Bumble Bee, and the Western Spadefoot Toad. The project is managed by the City of Glendale with primary coordination through the Principal Planner and Business Transformation Manager.
City of Glendale

POSTED

21 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Santa Barbara Community College District Solar Power Array & Battery Energy Storage System MicrogridThe Santa Barbara Community College District is implementing a solar power array and battery energy storage system microgrid at the Cliff Campus in Santa Barbara, California. This project involves the installation of 1.6 megawatts of carport-mounted solar arrays, battery energy storage systems, transformers, inverters, and related electrical infrastructure. The work will be concentrated within existing parking facilities on the East and West Campuses, specifically targeting Parking Lots 1A, 1B, 4A, 4B, 4C, and 4D. The primary objectives of the installation are to provide 8 to 24 plus hours of energy resilience, reduce the district's carbon footprint, and lower long-term energy costs through renewable energy generation. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from the California Environmental Quality Act pursuant to Categorical Exemption Class 1 for Existing Facilities, as the project occurs within previously developed areas with no expansion of use or new land disturbance. Project administration is managed by the Santa Barbara Community College District, with key coordination involving Rachel Hollander and Chris Renbarger. The project is classified under NAICS code 221114 and was formally documented via a Notice of Exemption dated June 4, 2026.
Santa Barbara Community College District

POSTED

21 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
RPCA Solar 17, LLC Project (PSP 25-092)
Solicitation # PSP 25-092
RPCA Solar 17, LLC is developing a small-scale utility solar generation facility in unincorporated Tulare County, California, near Porterville. The project will be situated on approximately 13.6 acres across three parcels totaling 17.6 acres within the Exclusive Agricultural zoning district. The project sponsor has secured a long-term lease agreement with the property owner, the Antoine Bechara Revocable Trust, to facilitate the construction and operation of the facility. Once complete, the project will generate up to 3 megawatts of alternating current clean energy using single-axis tracking solar modules. The generated power is intended to be sold to the Clean Power Alliance through a long-term Power Purchase Agreement, with interconnection provided via Southern California Edison's existing electrical distribution system. The facility will feature a seven-foot chain-link fence with wildlife-permeable design elements and will be accessed by a 20-foot wide all-weather gravel road. Electrical connections will transition from existing overhead lines to underground utility runs leading to a central power station and transformer. The site will be operated remotely with professional operations and maintenance contractors managing the facility and native groundcover restoration. Environmental compliance is being managed through an Initial Study and Mitigated Negative Declaration, with all mitigation measures incorporated into a formal Monitoring and Reporting Program to ensure the protection of the surrounding agricultural and rural residential landscape.
Tulare County

POSTED

30 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement