Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oveja Ranch Solar Project

Awarded
PLNP2025-00124State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The Oveja Ranch Solar Project, identified by control number PLNP2025-00124, involves the approval of three Williamson Act Contract Amendments (69-AP-023.2, 69-AP-023.6, and 69-AP-023.5) by the Sacramento County Board of Supervisors. These amendments permit the use of commercial solar facilities and battery energy storage systems as compatible uses on three agricultural parcels located at 7266 Eagles Nest Road, 7700 Eagles Nest Road, and 10950 Gerber Road in the Vineyard community of unincorporated Sacramento County. The project site falls within the Agricultural - 160 Acres (AG-160) and Flood Combining (F) zoning districts. The project is being carried out by the Sacramento Municipal Utility District (SMUD), which served as the Lead Agency and certified the Final Environmental Impact Report on September 18, 2025. The facility will consist of PV solar panels, a battery energy storage system, a substation, and upgraded distribution lines to connect the project to the existing SMUD distribution system. Sacramento County, acting as the Responsible Agency, approved the amendments on November 4, 2025, determining that the project will not have a significant environmental effect provided that the adopted mitigation measures and monitoring programs are implemented.

General Info

Amendments allow solar and battery storage development on agricultural land in Sacramento County under state environmental rules.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Julie NewtonEnvironmental Coordinator

Full Description

Show more
A Sacramento County Board of Supervisors review for three Williamson Act Contract Amendments (69-AP-023.2, 69-AP-023.6 and 69-AP-023.5) to allow Commercial Solar Facilities and Battery Energy Storage Systems (BESS) as compatible uses within the three Williamson Act Contracts. Approval of the amendments will allow for the establishment of a SMUD renewable energy generation facility across three agricultural properties in the Agricultural - 160 Acres (AG-160) and Flood Combining (F) zoning districts. The proposed SMUD renewable energy generation facility (SMUD Facility) will include construction of PV solar panels, a BESS, a substation, and new upgraded distribution lines to interconnect the project to SMUD's existing distribution system. SMUD, as Leady Agency, prepared an Environmental Impact Report; SMUD approved the SMUD Facility project and certified the Final Environmental Impact Report on 9/18/2025.

More opportunities from California → Sacramento County

Same awarding agency

NAICS: 237310
SLED
Alta Arden Expressway Phase I
Solicitation # PLER2024-00142
The Sacramento County Department of Transportation is implementing the Alta Arden Expressway Phase I project to enhance pedestrian and bicycle infrastructure along approximately 0.9 miles of the expressway, from 390 feet west of Howe Avenue to Fulton Avenue. The scope of work includes installing buffered bike lanes, filling sidewalk gaps with six to ten-foot-wide paths, installing new streetlamps, and performing roadway restriping, pavement rehabilitation, and resurfacing. Additionally, the project involves modifying traffic signals at Howe Avenue, Bell Street, and Fulton Avenue to include ADA-accessible pedestrian displays and audible push buttons, as well as the potential relocation of gas, electric, water, sewer, and telecommunication facilities. The project is governed by CEQA and NEPA requirements, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Key compliance measures include adhering to Sacramento Metropolitan AQMD Basic Construction Emission Control Practices and following specific hazardous waste protocols, such as the disposal of excavated soil west of Markston Road at licensed facilities. The project also incorporates tribal cultural resource consultations per AB 52 and utilizes a Road Construction Emissions Model to monitor air quality impacts. The project was officially approved by Sacramento County on July 14, 2026, under the coordination of the Environmental Coordinator.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

N/A
View Details
NAICS: 237120
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Oil and Gas Pipeline and Related Structures Construction

POSTED

22 days ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
Bar None Auction
Solicitation # PLNP2023-00290
The Bar None Auction project, identified by control number PLNP2023-00290, involves the development of three parcels totaling approximately 47 acres at 6190 Bradshaw Road in Sacramento County, California. The project consists of constructing an online auction business facility featuring a 21,510 square foot two-story office building, a 12,800 square foot industrial shop for repairs, a guard kiosk, and a customer patio. Site infrastructure includes approximately ten acres of paved parking and vehicle storage, a 30-acre graveled auction yard for track-equipped equipment, a closed-cycle wash rack, a 200,000 to 250,000 gallon water tank with a pump house, and above-ground fuel storage tanks for diesel and gasoline. The site also incorporates 6.5 acres for stormwater pretreatment detention and retention. Environmental assessments indicate that grading will permanently impact 3.82 acres of seasonal wetlands. The project has undergone a Mitigated Negative Declaration process to address impacts on air quality, greenhouse gas emissions, and biological resources, specifically regarding migratory birds and western burrowing owls. Compliance requires adherence to the South Sacramento Habitat Conservation Plan, the use of orange construction fencing to limit ground disturbance, and biological monitoring during construction. Operational hours are set for Monday through Friday, 8 a.m. to 5 p.m., with online auctions held every second Saturday of the month. The project is administered by Sacramento County, with an initial administrative deposit of 9,400 dollars provided by the applicant.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Sacramento International Airport Master Plan Update
Solicitation # PLER2024-00162
The Sacramento County Department of Airports is overseeing the design and construction of a new Airfield Maintenance (AFMX) facility located in the north airfield area of the Sacramento International Airport campus, specifically near the intersection of Delta Road and Earhart Drive. The project, identified by control number PLER2024-00162, involves the creation of a main building that will house administrative offices, conference rooms, a break room, and locker rooms, alongside operational spaces including specialized shop areas, equipment bays, a loading dock, and an emulsion cleanup area. A critical component of the project is the transition of the site from landside to airside. While the site will remain landside during the construction phase, the Aircraft Operations Area fence will be relocated upon completion to encompass the facility. This transition includes the removal of existing gates on the east side and the installation of new gates on the west end to provide airside access. The project was approved on August 25, 2026, and complies with the California Environmental Quality Act through an addendum to the Sacramento International Airport Master Plan Update Supplemental EIR, confirming that existing mitigation measures are sufficient. Primary points of contact for the project include Environmental Coordinator Julie Newton and Senior Airport Planner Zach Frese.
Highway, Street, and Bridge Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 541340
SLED
UPPER WESTSIDE SPECIFIC PLAN
Solicitation # PLNP2018-00284
The Upper Westside Specific Plan is a land-use project by Sacramento County encompassing approximately 2,066 acres in the unincorporated Natomas community. The project is divided into a 1,524-acre Development Area and a 542-acre Agricultural Buffer Area. The development focuses on an urban, commercial mixed-use town center near El Centro Road and West El Camino Avenue, featuring approximately 9,356 dwelling units and over 3 million square feet of commercial space. Planned infrastructure includes three K-8 schools, one high school, multiple parks, a canal system, a greenbelt, and an urban farm corridor to promote pedestrian and bicycle connectivity. The project requires significant regulatory actions, including amendments to the Sacramento County Urban Policy Area and Urban Services Boundary, as well as updates to the General Plan's Land Use Diagram, Transportation Plan, and Active Transportation Plan. It also necessitates a Water Supply Master Plan amendment and a Water Supply Assessment under the California Water Code. Environmental compliance is managed through the California Environmental Quality Act, with a Partially Recirculated Draft Environmental Impact Report introducing Alternative 5 to address water supply sources and circulation networks. Key oversight involves managing potential impacts on biological resources, groundwater basins, and the re-abandonment of legacy oil and gas wells as advised by CalGEM. The project was officially approved by Sacramento County on June 16, 2026.
Drafting Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS