Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Kiefer Landfill Gas Utilization Project

Forecast
PLER2024-00137State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.

General Info

Kiefer Landfill to produce pipeline-quality methane via renewable gas facility, connecting to PG&E via new pipeline in Sacramento County.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Andrew PetricProject Manager
Julie NewtonEnvironmental Coordinator

Interested Companies (1)

Michael Baker InternationalLakewood, Colorado

Full Description

Show more
The project consists of a grading permit at Kiefer Landfill to facilitate construction of a proposed renewable natural gas (RNG) plant. Construction of the RNG plant requires site preparation and grading in excess of 1 acre and 350 cubic yards of earthly material, which is subject to a grading permit from the County pursuant to County Code §16.44.050. The grading plans for the RNG plant cover a site of approximately two acres in size, and associated earth work consisting of approximately 350 cubic yards of cut, approximately 20,900 cubic yards of fill, and approximately 20,550 cubic yards of import material.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project, solicitation BPM059366, involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Gunpowder Falls State Park Hammerman Area in Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. Key deliverables include the installation of new storage tanks, concrete pads, and side-mount dispensers, as well as the provision of temporary gasoline and diesel tanks with metered dispensers for the duration of the project. All work must adhere to strict safety and environmental standards, including NFPA 30, 30A, and 78, API standards 650 and 620, and Maryland Department of the Environment regulations, with backfill compacted to a minimum of 95 percent. The contract is a Small Business Reserve Procurement, limiting the award to certified small businesses. The basis of award is the lowest responsive and responsible total bid. Procurement goals include a 15.00% MBE and 2.0% VSBE participation rate, with liquidated damages applicable for failure to comply with MBE requirements. The state reserves the right to apply reciprocal preference for resident bidders. Final acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, requiring the submission of an approved electrical inspection certificate, a disposal manifest for contaminated soils and equipment, and three sets of manufacturer manuals and as-built drawings. Invoices are to be submitted to the Maryland Department of Natural Resources in Annapolis, with payments typically issued within 30 days of receipt of a proper invoice.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a design-build, firm-fixed-price contract for fueling system repairs at the W.H. Ford Regional Training Center in Kentucky, managed by the US Army Corps of Engineers, Omaha District. This project is a total set-aside restricted to 100% small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including the installation of an emergency fuel shutoff station, leak detection equipment, and an upgraded automatic tank gauging system. Additional requirements include repairing concrete and pavement, recoating fuel system canopies and piping, replacing tank vents, and improving grounding systems and equipment access platforms. All work must adhere to EM 385-1-1 safety standards, as well as IBC, NFPA, and ADA accessibility guidelines. Proposals must be submitted electronically in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the project schedule, and a technical approach, and a separate pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process to award the contract. The proposal submission deadline has been extended to December 21, 2026, at 14:00 CST. Once awarded, the contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Compliance with the Davis-Bacon Act and Buy American requirements is mandatory.
W071 Endist Omaha

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237120
New
Federal
Gas Line Repair
Solicitation # GasLineRepair
The 55th Contracting Squadron at Offutt Air Force Base, Nebraska, is conducting a sources sought market survey to identify qualified contractors for the repair and replacement of gas distribution system components. The scope of work includes repairing gas leaks on 6 inch and 8 inch pipes and valves, as well as replacing components on 2 inch pipes and valves. Specific tasks involve repairing a 6 inch HDPE line near B479, replacing 8 inch valves and flanges near B73, and replacing a 2 inch isolation valve on the service line to B73. The project also requires the replacement or reconnection of cathodic protection and the installation of new valve boxes and risers marked for gas. The period of performance extends from the time of award until April 30, 2027. Due to base gas load requirements, the 8 inch valve replacement must be performed during warmer spring weather, specifically when temperatures show five consecutive days with lows above 40 degrees Fahrenheit and highs above 65 degrees Fahrenheit. All work must comply with 49 CFR 192, API, ASME, and American Gas Association standards, as well as ISO 9001 quality management processes. Contractors are required to provide welder certifications and perform pressure testing for at least one hour post-installation. This is a small business set-aside under NAICS code 237120. Interested parties must submit their capabilities package, including company information and socio-economic status, to the designated point of contact by 12:00 PM CST on November 17, 2026.
FA4600 55 Cons Pkp

POSTED

3 days ago

DEADLINE

in 11 days
View Details

More opportunities from California → Sacramento County

Same awarding agency

NAICS: 237310
SLED
Alta Arden Expressway Phase I
Solicitation # PLER2024-00142
The Sacramento County Department of Transportation is implementing the Alta Arden Expressway Phase I project to enhance pedestrian and bicycle infrastructure along approximately 0.9 miles of the expressway, from 390 feet west of Howe Avenue to Fulton Avenue. The scope of work includes installing buffered bike lanes, filling sidewalk gaps with six to ten-foot-wide paths, installing new streetlamps, and performing roadway restriping, pavement rehabilitation, and resurfacing. Additionally, the project involves modifying traffic signals at Howe Avenue, Bell Street, and Fulton Avenue to include ADA-accessible pedestrian displays and audible push buttons, as well as the potential relocation of gas, electric, water, sewer, and telecommunication facilities. The project is governed by CEQA and NEPA requirements, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Key compliance measures include adhering to Sacramento Metropolitan AQMD Basic Construction Emission Control Practices and following specific hazardous waste protocols, such as the disposal of excavated soil west of Markston Road at licensed facilities. The project also incorporates tribal cultural resource consultations per AB 52 and utilizes a Road Construction Emissions Model to monitor air quality impacts. The project was officially approved by Sacramento County on July 14, 2026, under the coordination of the Environmental Coordinator.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
Bar None Auction
Solicitation # PLNP2023-00290
The Bar None Auction project, identified by control number PLNP2023-00290, involves the development of three parcels totaling approximately 47 acres at 6190 Bradshaw Road in Sacramento County, California. The project consists of constructing an online auction business facility featuring a 21,510 square foot two-story office building, a 12,800 square foot industrial shop for repairs, a guard kiosk, and a customer patio. Site infrastructure includes approximately ten acres of paved parking and vehicle storage, a 30-acre graveled auction yard for track-equipped equipment, a closed-cycle wash rack, a 200,000 to 250,000 gallon water tank with a pump house, and above-ground fuel storage tanks for diesel and gasoline. The site also incorporates 6.5 acres for stormwater pretreatment detention and retention. Environmental assessments indicate that grading will permanently impact 3.82 acres of seasonal wetlands. The project has undergone a Mitigated Negative Declaration process to address impacts on air quality, greenhouse gas emissions, and biological resources, specifically regarding migratory birds and western burrowing owls. Compliance requires adherence to the South Sacramento Habitat Conservation Plan, the use of orange construction fencing to limit ground disturbance, and biological monitoring during construction. Operational hours are set for Monday through Friday, 8 a.m. to 5 p.m., with online auctions held every second Saturday of the month. The project is administered by Sacramento County, with an initial administrative deposit of 9,400 dollars provided by the applicant.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Sacramento International Airport Master Plan Update
Solicitation # PLER2024-00162
The Sacramento County Department of Airports is overseeing the design and construction of a new Airfield Maintenance (AFMX) facility located in the north airfield area of the Sacramento International Airport campus, specifically near the intersection of Delta Road and Earhart Drive. The project, identified by control number PLER2024-00162, involves the creation of a main building that will house administrative offices, conference rooms, a break room, and locker rooms, alongside operational spaces including specialized shop areas, equipment bays, a loading dock, and an emulsion cleanup area. A critical component of the project is the transition of the site from landside to airside. While the site will remain landside during the construction phase, the Aircraft Operations Area fence will be relocated upon completion to encompass the facility. This transition includes the removal of existing gates on the east side and the installation of new gates on the west end to provide airside access. The project was approved on August 25, 2026, and complies with the California Environmental Quality Act through an addendum to the Sacramento International Airport Master Plan Update Supplemental EIR, confirming that existing mitigation measures are sufficient. Primary points of contact for the project include Environmental Coordinator Julie Newton and Senior Airport Planner Zach Frese.
Highway, Street, and Bridge Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 541340
SLED
UPPER WESTSIDE SPECIFIC PLAN
Solicitation # PLNP2018-00284
The Upper Westside Specific Plan is a land-use project by Sacramento County encompassing approximately 2,066 acres in the unincorporated Natomas community. The project is divided into a 1,524-acre Development Area and a 542-acre Agricultural Buffer Area. The development focuses on an urban, commercial mixed-use town center near El Centro Road and West El Camino Avenue, featuring approximately 9,356 dwelling units and over 3 million square feet of commercial space. Planned infrastructure includes three K-8 schools, one high school, multiple parks, a canal system, a greenbelt, and an urban farm corridor to promote pedestrian and bicycle connectivity. The project requires significant regulatory actions, including amendments to the Sacramento County Urban Policy Area and Urban Services Boundary, as well as updates to the General Plan's Land Use Diagram, Transportation Plan, and Active Transportation Plan. It also necessitates a Water Supply Master Plan amendment and a Water Supply Assessment under the California Water Code. Environmental compliance is managed through the California Environmental Quality Act, with a Partially Recirculated Draft Environmental Impact Report introducing Alternative 5 to address water supply sources and circulation networks. Key oversight involves managing potential impacts on biological resources, groundwater basins, and the re-abandonment of legacy oil and gas wells as advised by CalGEM. The project was officially approved by Sacramento County on June 16, 2026.
Drafting Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS