Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Utility Extension Services

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Utility Extension Services involves performing utility extensions for prime contractors on land development projects within Sacramento County. The scope of work includes trenching, laying, and connecting water, sewer, and power lines from the main lines to specific parcels using appropriate utility piping and conduits. The primary objective is to deliver fully functional utility connections at the project site. All work must be executed in strict accordance with Sacramento County building codes and the specific standards set by local utility providers. The project falls under NAICS code 237110 and is centered in Sacramento, California, with a posted date of April 17, 2026.

General Info

Subcontract for utility extension services including water, sewer, and power in Sacramento County.

Documents

This scope was carved out of PLNP2022-00347.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

6036 Landis Avenue Tentative Parcel Map

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the extension of utilities for prime contractors on Sacramento County land development projects. Executes trenching, laying, and connecting water, sewer, or power lines from the main line to the parcel using utility piping and conduits. Must adhere to local utility provider standards and Sacramento County building codes. Delivers functional utility connections at the project site.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a performance bond, a payment bond, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with North Carolina Administrative Code regarding Minority and Women-Owned Business requirements is mandatory, requiring the submission of a Good Faith Efforts Form and Table A. Project administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed via Applications for Payment due 30 days after presentation to the owner. Work must adhere to various industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. The project must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is actively seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including bidder qualifications, past project experience, and management plans. Key contractual terms include a 5% retainage on progress payments and liquidated damages of $1,000 per calendar day. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and OSHA standards is mandatory. The successful bidder must provide performance and payment bonds equal to 100% of the contract amount and file required insurance within 15 days of the award.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, asphalt paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax to Veronica Garcia by the deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → Sacramento County

Same awarding agency

NAICS: 237310
SLED
Alta Arden Expressway Phase I
Solicitation # PLER2024-00142
The Sacramento County Department of Transportation is implementing the Alta Arden Expressway Phase I project to enhance pedestrian and bicycle infrastructure along approximately 0.9 miles of the expressway, from 390 feet west of Howe Avenue to Fulton Avenue. The scope of work includes installing buffered bike lanes, filling sidewalk gaps with six to ten-foot-wide paths, installing new streetlamps, and performing roadway restriping, pavement rehabilitation, and resurfacing. Additionally, the project involves modifying traffic signals at Howe Avenue, Bell Street, and Fulton Avenue to include ADA-accessible pedestrian displays and audible push buttons, as well as the potential relocation of gas, electric, water, sewer, and telecommunication facilities. The project is governed by CEQA and NEPA requirements, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Key compliance measures include adhering to Sacramento Metropolitan AQMD Basic Construction Emission Control Practices and following specific hazardous waste protocols, such as the disposal of excavated soil west of Markston Road at licensed facilities. The project also incorporates tribal cultural resource consultations per AB 52 and utilizes a Road Construction Emissions Model to monitor air quality impacts. The project was officially approved by Sacramento County on July 14, 2026, under the coordination of the Environmental Coordinator.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

N/A
View Details
NAICS: 237120
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Oil and Gas Pipeline and Related Structures Construction

POSTED

22 days ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
Bar None Auction
Solicitation # PLNP2023-00290
The Bar None Auction project, identified by control number PLNP2023-00290, involves the development of three parcels totaling approximately 47 acres at 6190 Bradshaw Road in Sacramento County, California. The project consists of constructing an online auction business facility featuring a 21,510 square foot two-story office building, a 12,800 square foot industrial shop for repairs, a guard kiosk, and a customer patio. Site infrastructure includes approximately ten acres of paved parking and vehicle storage, a 30-acre graveled auction yard for track-equipped equipment, a closed-cycle wash rack, a 200,000 to 250,000 gallon water tank with a pump house, and above-ground fuel storage tanks for diesel and gasoline. The site also incorporates 6.5 acres for stormwater pretreatment detention and retention. Environmental assessments indicate that grading will permanently impact 3.82 acres of seasonal wetlands. The project has undergone a Mitigated Negative Declaration process to address impacts on air quality, greenhouse gas emissions, and biological resources, specifically regarding migratory birds and western burrowing owls. Compliance requires adherence to the South Sacramento Habitat Conservation Plan, the use of orange construction fencing to limit ground disturbance, and biological monitoring during construction. Operational hours are set for Monday through Friday, 8 a.m. to 5 p.m., with online auctions held every second Saturday of the month. The project is administered by Sacramento County, with an initial administrative deposit of 9,400 dollars provided by the applicant.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Sacramento International Airport Master Plan Update
Solicitation # PLER2024-00162
The Sacramento County Department of Airports is overseeing the design and construction of a new Airfield Maintenance (AFMX) facility located in the north airfield area of the Sacramento International Airport campus, specifically near the intersection of Delta Road and Earhart Drive. The project, identified by control number PLER2024-00162, involves the creation of a main building that will house administrative offices, conference rooms, a break room, and locker rooms, alongside operational spaces including specialized shop areas, equipment bays, a loading dock, and an emulsion cleanup area. A critical component of the project is the transition of the site from landside to airside. While the site will remain landside during the construction phase, the Aircraft Operations Area fence will be relocated upon completion to encompass the facility. This transition includes the removal of existing gates on the east side and the installation of new gates on the west end to provide airside access. The project was approved on August 25, 2026, and complies with the California Environmental Quality Act through an addendum to the Sacramento International Airport Master Plan Update Supplemental EIR, confirming that existing mitigation measures are sufficient. Primary points of contact for the project include Environmental Coordinator Julie Newton and Senior Airport Planner Zach Frese.
Highway, Street, and Bridge Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 541340
SLED
UPPER WESTSIDE SPECIFIC PLAN
Solicitation # PLNP2018-00284
The Upper Westside Specific Plan is a land-use project by Sacramento County encompassing approximately 2,066 acres in the unincorporated Natomas community. The project is divided into a 1,524-acre Development Area and a 542-acre Agricultural Buffer Area. The development focuses on an urban, commercial mixed-use town center near El Centro Road and West El Camino Avenue, featuring approximately 9,356 dwelling units and over 3 million square feet of commercial space. Planned infrastructure includes three K-8 schools, one high school, multiple parks, a canal system, a greenbelt, and an urban farm corridor to promote pedestrian and bicycle connectivity. The project requires significant regulatory actions, including amendments to the Sacramento County Urban Policy Area and Urban Services Boundary, as well as updates to the General Plan's Land Use Diagram, Transportation Plan, and Active Transportation Plan. It also necessitates a Water Supply Master Plan amendment and a Water Supply Assessment under the California Water Code. Environmental compliance is managed through the California Environmental Quality Act, with a Partially Recirculated Draft Environmental Impact Report introducing Alternative 5 to address water supply sources and circulation networks. Key oversight involves managing potential impacts on biological resources, groundwater basins, and the re-abandonment of legacy oil and gas wells as advised by CalGEM. The project was officially approved by Sacramento County on June 16, 2026.
Drafting Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS