Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Proposed BREI Solar Farm

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Oroville is pursuing the development of a utility-scale solar energy and battery storage facility on approximately 116 acres of previously disturbed industrial and commercial parcels located east of the Feather River and south of Downtown Oroville in Butte County, California. The project site encompasses multiple assessor’s parcel numbers including 035-470-028, 035-470-031, 035-470-035, 035-370-005, 035-460-027, and portions of several other parcels, with the primary area overlapping the former Koppers Superfund site. The facility will feature ground-mounted photovoltaic panels on pre-cast concrete slab foundations, battery storage units, internal access roads, perimeter security fencing, and interconnection infrastructure to the existing PG&E grid. It is designed as an unmanned renewable energy installation with no permanent structures, housing, or septic systems, relying only on periodic maintenance and security visits. The project aims to generate clean electricity for local residential, commercial, and industrial users, supporting state and regional climate goals by displacing fossil-fuel-based power. Environmental compliance forms the foundation of the project, with adherence to California Environmental Quality Act (CEQA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and Porter-Cologne Water Quality Control Act requirements. The development must avoid disturbance of ongoing remediation efforts including groundwater pump-and-treat systems, respect designated soil contamination zones, and comply with strict Land Use Covenants that restrict the site to industrial and commercial use only. All construction and operational activities must follow approved Stormwater Pollution Prevention Plans, maintain required setbacks from wetlands and drainage features, and comply with state wetland delineation standards. Oversight is shared between the City of Oroville, the California Department of Toxic Substances Control, and the U.S. Environmental Protection Agency, with formal approval required prior to any intrusive work. While no federal acquisition regulation clauses or formal procurement evaluation factors are specified, the project is governed by state regulatory frameworks and institutional controls. Key contacts include the City Planner Wes Ervin and applicant Hollis Day, with submissions routed through the State Clearinghouse and EPIMS portal. No contract value, payment terms, invoicing systems, or delivery schedules are formally documented, indicating the document set serves primarily as an environmental and land use permitting framework rather than a traditional procurement contract.

General Info

Oroville to build solar and battery storage on contaminated industrial land, complying with state environmental regulations.

Agency

California → City of Oroville

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

South 7th Avenue, Baggett Marysville Road, and Ophir Road, Oroville, CA, 95965

Set-Aside

NONE

Documents

(8)

Notice of Determination for BREI Solar Farm Project

PDFnotice-of-determination

DTSC Comments on BREI Solar Farm Mitigated Negative Declaration

PDFcomment

CDFW Comments on BREI Solar Farm Project MND

PDFcomment

Notice of Completion for Proposed BREI Solar Farm

PDFnotice-of-completion

Receipt for MND Filing - Proposed BREI Solar Farm

PDFreceipt

NOA-NOI

ZIP

Summary Form for Proposed BREI Solar Farm Environmental Document

PDFenvironmental-summary

BREI Solar Farm Initial Study/Mitigated Negative Declaration September 2025

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oroville
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Oroville
Office AddressN/A
Contacts
Kiley CopeAssistant Planner
Hollis DaySafety Advisor & Business Development

Full Description

Show more
The project site consists of multiple parcels totaling approximately 116 acres within the City of Oroville, Butte County, California. Primary parcels include APNs: 035-470-028, 035-470-031, 035-470-035, 035-370-005, 035-460-027, portions of 035-370-002, 035-470-022-000, 035-470-036-000, and 035-470-037-000. The sites are generally bounded by South 7th Avenue, Baggett Marysville Road, and Ophir Road, east of the Feather River and south of Downtown Oroville. BREI proposes to construct and operate a utility-scale solar energy generation and battery storage facility across approximately 116 acres of disturbed industrial and commercial parcels, including portions of the former Koppers Superfund site. The project will include ground-mounted photovoltaic (PV) solar panels installed on pre-cast concrete slab foundations, inverters, battery storage units, internal access roads, perimeter security fencing, and interconnection to the existing PG&E grid system. The facility will operate as an unmanned renewable energy installation, with only periodic maintenance and security visits. No permanent structures, housing, or septic systems are proposed.The project is intended to generate renewable electricity to serve local businesses, homes, and industrial users, reducing reliance on fossil-fuel-based electricity in support of state and local climate action goals.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
SOLAR PHOTOVOLTAIC SYSTEM DEVELOPMENT AND POWER PURCHASE AGREEMENT
Solicitation # BD-27-1355-PRC-YPRC-131972
The Town of Yarmouth is inviting qualified proposers to submit bids for the lease of a parcel of municipal property at 74 Town Brook Road in West Yarmouth, Massachusetts, to develop, install, operate, and maintain a solar photovoltaic system. The selected proposer will also enter into a Power Purchase Agreement with the Town to sell the generated electricity, ensuring a long-term, sustainable energy supply. The project aligns with the Town’s goals for renewable energy adoption and cost efficiency, with all development and operational responsibilities falling to the proposer, who must meet the technical and financial criteria outlined in the solicitation. Proposals must demonstrate proven experience in solar project development, financial viability, and compliance with local and state regulations. Bids are due by September 10, 2026, and must be submitted in response to solicitation number BD-27-1355-PRC-YPRC-131972, which was posted on August 4, 2026. The process is managed by the Massachusetts Procurement division under the agency name PRC - PROCUREMENT, with Svetlana Salemme serving as the primary point of contact. The property is located in Barnstable County, within the 02673 ZIP code, and performance is expected to occur entirely on site. While no specific set-aside or NAICS code is designated, the solicitation is open to all qualified entities and emphasizes technical expertise, project scalability, and adherence to the Town’s energy objectives. Interested parties are encouraged to review the details via the provided Commbuys link.
PRC - PROCUREMENT

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
New
SLED
Orleans Solar-Storage ProjectAdapture Renewables, Inc. through its affiliate Orleans Energy Center, LLC is proposing the Orleans Solar-Storage Project on approximately 160 acres of privately owned land in unincorporated western Fresno County, California. The project includes a 25-megawatt alternating current photovoltaic solar energy facility coupled with a 25-megawatt alternating current battery energy storage system capable of storing up to 200 megawatt-hours of electricity, providing up to eight hours of discharge capacity. The development will feature an onsite electrical substation, internal wiring and collection infrastructure, and a new 1-mile, 70-kilovolt generation-tie line to connect to the existing Pacific Gas and Electric Company Giffen Substation. The project aims to enhance grid reliability and support renewable energy goals in the region by integrating solar generation with scalable storage. All development activities are subject to regional planning and environmental review processes overseen by Fresno County. The primary point of contact for the project is Arianna Brown, Planner at Fresno County, reachable at 559-600-4245 or arbrown@fresnocountyca.gov. Additional contacts include Sarah Spann, Principal Environmental Planner at Stantec, and Chrissy Gaglione, Development Manager at Adapture Renewables. The project has been posted under a forecast notice with a public record identifier of 2026080074 and is anticipated to proceed through environmental assessments and permitting phases in the coming years. The location of performance is designated as Fresno, California, with the zip code 93608, indicating the general area of impact. No formal solicitation number or set-aside classification has been assigned, as this is a private development proposal requiring local regulatory approval rather than a competitive government procurement.
Fresno County

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 221114
International
ELJ2026-SolarSystems: Procurement of Solar Systems
Solicitation # ELJ2026-SolarSystems
e-Learning Jamaica Company Limited, an agency of the Ministry of Education, Skills, Youth and Information, is seeking qualified suppliers to bid for the supply, installation, maintenance, and warranty support of solar system kits across multiple lots, with bidders permitted to submit proposals for up to two lots. Participation is strictly limited to those registered on the Government of Jamaica Electronic Procurement Portal, and all tender documents, clarifications, and submissions must be completed online via www.gojep.gov.jm; no hard copies or physical submissions will be accepted. To be deemed eligible, bidders must provide a valid Tax Compliance Certificate, proof of current registration with the Public Procurement Commission or National Commercial Council in the Electrical Appliance and Equipment category, and a bid security of JMD $200,000. Tender documents became available for download on July 22, 2026, with a final deadline for clarification requests on August 24, 2026, at 11:00 a.m., and all bids must be submitted by August 31, 2026, at 11:00 a.m. local time, followed by an online bid opening at 11:15 a.m. on the same day. The awarding authority reserves the right to reject any or all bids, including the lowest-priced submission, and may terminate the procurement process at any time prior to contract award without incurring liability to participants.
e-Learning Jamaica Limited

POSTED

16 days ago

DEADLINE

in 24 days
View Details
NAICS: 221114
Federal
Preventive Maintenance Services for Photovoltaic Systems
Solicitation # PR15733540
The United States Consulate General in Hyderabad, India, is soliciting professional services to perform preventive maintenance on its photovoltaic systems under solicitation number PR15733540, with responses due by August 26, 2026. The contract, classified under NAICS code 221114 for Solar Electric Power Generation, is a commercial item acquisition governed by FAR 52.212-1 and 52.212-4, with a firm-fixed-price structure expected. The base performance period is one year, with four one-year option periods available, allowing for a potential five-year contract duration. Work involves semi-annual maintenance tasks including cleaning and inspecting DC disconnects, inverter servicing, cable polarity verification, and system performance evaluations, all aligned with IEC 62446-1:2016 standards and manufacturer guidelines. Deliverables require completion of maintenance checklists, submission of performance test results within 30 days, and ensuring no more than one customer complaint per month. Contractors must provide an operational strategic plan, evidence of qualified personnel and equipment, a plan to secure necessary licenses, and a list of clients from the past five years. Key personnel must be fluent in English, sign off on all tasks, and submit reports to the COR within five business days. All offerors must be registered in SAM, hold valid GST certification if based in India, maintain minimum liability insurance of INR 1 million, comply with Indian labor laws, and adhere to prohibitions on the use of ByteDance-covered applications such as TikTok. No formal security clearances are mandated, but physical access to the consulate requires compliance with on-site identification and conduct protocols. Contractors must avoid any misrepresentation of government affiliation and cannot use Department of State logos. Subcontractor sales restrictions, whistleblower protections, labor standards, and anti-trafficking clauses are incorporated, with electronic funds transfer required for payments submitted via email to MissionIndiaPayments@state.gov. Performance will be evaluated based on past performance, offeror responsibility including financial health and technical capability, and pricing, with award determined through a best-value trade-off process rather than lowest price technically acceptable. No packaging or marking requirements beyond electrical warning labels are specified, and no FOB terms or Incoterms are defined in the solicitation.
American Consulate Hyderabad

POSTED

18 days ago

DEADLINE

in 18 days
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPA
Solicitation # 0000039798
The California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

23 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

24 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Encino Reservoir Floating Solar Pilot ProjectThe Encino Reservoir Floating Solar Pilot Project involves the installation of a 5-megawatt floating solar panel array on the southwest portion of the reservoir, complemented by a 30-kilowatt ground-mount photovoltaic system on the same property. All electrical infrastructure—including inverters, transformers, and switchgear—will be situated adjacent to the ground-mount system and connected to the existing 34.5-kilovolt above-ground distribution line within the reservoir property. Additionally, a 5-megawatt, 20-megawatt-hour iron-flow battery energy storage system will be deployed on a 6,500-square-foot area north of the reservoir to support grid stability and energy dispatch. Construction is scheduled from July 2026 through July 2027, with distinct phases for floating solar, electrical connections, inverter installation, system energization, battery deployment, and ground-mount solar completion. The project is led by the Los Angeles Department of Water and Power, with environmental compliance as a central focus under CEQA and state regulations, requiring mitigation for air quality, biological resources, water quality, noise, and greenhouse gas emissions. All environmental assessments and mitigation plans are documented in eight technical appendices covering air quality, biological resources, wetland delineation, special-status plant surveys, avian habitat impacts, cultural resources, greenhouse gas emissions, and noise and vibration. Inspection and acceptance occur on-site at the reservoir property, governed by standards from the Regional Water Quality Control Board, California Air Resources Board, South Coast Air Quality Management District, Clean Water Act, and federal NAAQS, with oversight conducted by LADWP as the Lead Agency. The primary point of contact for submittals and coordination is David Norris, Environmental Planning and Assessment Manager, reachable via mail at 111 North Hope Street, Los Angeles, CA 90012, by phone at (213) 367-3509, or by email at david.norris@ladwp.com. Proposals for public comment are due by January 13, 2026, and must be submitted either electronically through the LADWP environmental notices portal or as 15 hard copies along with a summary form. No formal contract pricing, line items, or federal procurement clauses are specified in the documentation, and while state environmental certifications under the Clean Water Act are provided, no federal acquisition representations, socioeconomic certifications, or payment terms are included. The project reflects
California Los Angeles Department of Water and Power

POSTED

25 days ago

DEADLINE

N/A
View Details