Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Heartland Solar Project

Forecast
2022100609State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Heartland Solar Project involves the construction, operation, and eventual decommissioning of a renewable energy facility in western Fresno County, California, specifically near Mendota. The project consists of a photovoltaic solar energy generation system producing approximately 300 megawatts alternating current (MWAC) and a battery energy storage system with a capacity of up to 300 MWAC for at least a four-hour discharge. Spanning approximately 2,362 acres of private land, the facility will interconnect to the regional electrical grid via a five-mile generation-tie line leading to the Tranquillity Switching Station, which is owned and operated by Pacific Gas and Electric Company. The project has undergone extensive environmental review under the California Environmental Quality Act, resulting in the certification of Environmental Impact Report No. 7564 and the approval of Unclassified Conditional Use Permit No. 3630 on June 4, 2026. Key compliance requirements include adherence to SJVAPCD Rule 9510 for construction equipment emissions and strict CPUC rules for utility safety and vegetation management. Additionally, the project mandates the employment of a Secretary of the Interior-Qualified Project Archaeologist to implement a Cultural Resource Monitoring Plan and requires immediate adherence to Health and Safety Code Section 7050.5 in the event of the discovery of human remains. Biological concerns have been raised regarding special-status species, including the San Joaquin kit fox, Swainson's hawk, and western burrowing owl, necessitating specific mitigation and take authorizations.

General Info

300MW solar and battery project in Fresno County, California, with environmental compliance.

Place of Performance

SR 33, S. Ohio Ave, W. American Ave, S. San Bernardino Ave, Los Angeles Ave., CA, 93640

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
Contacts3 people available
OfficeN/A
Organization / AgencyCalifornia → Fresno County
Office AddressN/A
Contacts

Interested Companies (1)

Environmental Science AssociatesTampa, Florida

Full Description

Show more
The Heartland Solar Project consists of renewable photovoltaic (PV) solar energy generation and energy storage system facilities and interconnection to the regional energy grid. Proposed solar facilities would generate approximately 300 megawatts alternating current (MWAC) of solar PV energy and have capacity to store up to 300MW of energy on approximately 2,362 acres of private land in western Fresno County. These facilities would interconnect to the regional electrical grid via an electrical generation-tie (gen-tie) line between the solar facility and the existing Tranquillity Switching Station, which is located approximately 1.25 miles south of the proposed solar and energy storage facility site. The project would also require other necessary infrastructure work to support interconnection and upgrades within the existing Tranquillity Switching Station, owned and operated by Pacific Gas and Electric Company (PG&E).

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → Fresno County

Same awarding agency

NAICS: 221114
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Solar Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Unclassified Conditional Use Permit Application No. 3821 & Initial Study No. 8708
Solicitation # 3821
Unclassified Conditional Use Permit Application No. 3821 and Initial Study No. 8708 involve an amendment to the Panoche Rd. Major Interchange Master Plan to allow the installation of an EV Truck Charging Station and associated DC Fast Charging EV Stations. The project, submitted by applicant Jia Lui on behalf of Tesla, is located on two parcels (APNs 027-190-32S and 027-190-42S) at the northwest corner of W. Panoche Rd. and Interstate 5 in Fresno County, within the AE-40 Exclusive Agriculture Zone District. The facility will feature sixteen semi truck charging stalls, eight semi truck parking stalls, and restroom amenities. The Fresno County Department of Public Works and Planning served as the lead agency, conducting an environmental review under the California Environmental Quality Act. The process resulted in a Mitigated Negative Declaration, concluding that the project would not have a significant environmental effect, provided specific mitigation measures are implemented. The project must adhere to the Fresno County General Plan Policy LU-D.6 for aesthetic excellence and the Fresno County Zoning Ordinance Section 860.E.2 regarding landscaping. Administrative milestones included a public review period from November 5 to December 5, 2025, and a public hearing on December 11, 2025, with a final Notice of Determination issued on December 30, 2025.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS