Tulare 40 Generation Facility Project (PSP 23-012)

Awarded
PSP 23-012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The Tulare 40 Generation Facility Project (PSP 23-012) involves the construction and operation of a 40-Megawatt solar photovoltaic generation facility with up to 20-Megawatts AC of battery energy storage. Located on approximately 313 acres in western Tulare County, California, the developed area will occupy about 160 acres across two parcels. The installation will feature approximately 68,040 single-axis mounted solar modules rated at 650 watts each, an on-site substation, inverters, wiring, access roads, and a short distribution interconnect power line to the adjacent Southern California Edison Bliss Substation. The project is designed for an anticipated operational life of 35 years. Managed by the Tulare County Resource Management Agency and applied for by Coldwell Solar I, LLC, the project was approved via Special Use Permit No. PSP 23-012. Approval was granted following a California Environmental Quality Act review, which resulted in a Mitigated Negative Declaration. Consequently, the project is subject to specific mitigation measures and a formal monitoring and reporting plan as enforceable conditions of approval. Administrative oversight is provided by the Tulare County Planning Commission, with key project planning and environmental contacts including Gary Mills, Jessica Wills, and Sandy Roper.

General Info

Coldwell Solar I will build a 40MW solar and 20MW battery facility in Tulare.

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts4 people available
OfficeN/A
Organization / AgencyCalifornia → Tulare County
Office AddressN/A
Contacts
Jessica WillsEnvironmental Planner
Sandy RoperProject Planner
Coldwell Solar IProject applicant

Full Description

Show more
The Project includes the construction and operation of the Tulare 40 Generation Facility (Project), an approximate 40-Megawatt (MW) solar generation facility and includes up to 20-Megawatts Alternating Current (MWac) of Energy Storage on two (2) parcels totaling approximately 313 acres in western Tulare County, California. The developed area would occupy approximately 160 acres of the total 313 acres across two (2) parcels. The Project site development area is located both north and south of Avenue 208, west of Road 164. The installation would comprise approximately 68,040 single axis mounted solar modules, rated at 650 watts per module. It should be noted that watts per module may increase at the time of Project construction; however, for planning purposes we have included an approximate module output of 650 watts. In addition to the installation of photovoltaic (PV) solar modules, the proposed development area of the Project would include the construction of an on-site substation, wiring and inverters, fence, access roads, and a new very short distribution interconnect power line to the existing substation located directly adjacent to the Project location at the Southern California Edison (SCE) Bliss Substation. The southern development area of the Project would potentially include a 20 (MW) storage component in the form of batteries. The life of the Project is anticipated to be 35 years.

More opportunities from California → Tulare County

Same awarding agency

NAICS: 237990
New
SLED
Tulare County Stream Channel Routine Maintenance Agreement ProjectTulare County plans to establish a 12-year agreement with the California Department of Fish and Wildlife to conduct routine maintenance on jurisdictional stream channels, drainage facilities, and associated areas throughout the county. The agreement authorizes approximately 30 maintenance projects annually, covering a range of activities such as repairing or replacing drainage structures, clearing debris and sediment under dry conditions, managing vegetation through grazing or direct removal, performing minor erosion control work, repairing prior erosion measures, and conducting geotechnical sampling or cultural resource sensitivity tests. All specific methods, locations, and scope of work will require prior submission and approval via the CDFW’s Verification Request Form process to ensure compliance with environmental regulations. The project is designed to support long-term water flow integrity, reduce flood risks, and maintain public infrastructure while adhering to state wildlife and habitat protections. The agreement will be administered by Tulare County’s Environmental Planning and Economic Development teams, with key personnel including the Chief Planner, Senior Environmental Planner/Biologist, and Associate RMA Director serving as primary contacts. The project is forecasted to be initiated in 2026 and will span the entirety of Tulare County’s jurisdictional waterways, ensuring consistent and regulated upkeep without requiring individual permits for each routine action. The long-term nature of the agreement streamlines compliance, reduces administrative burdens, and fosters consistent collaboration between the county and state wildlife agencies to balance infrastructure needs with ecological stewardship.
Other Heavy and Civil Engineering Construction

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
Cardoza Contractor Storage Yard (PSP 26-013)
Solicitation # PSP 26-013
The Cardoza Contractor Storage Yard project, identified as Special Use Permit PSP 26-013, involves the establishment and operation of a storage facility at 13870 Avenue 228, Tulare, California, to support an off-site landscaping business. The scope of work includes the construction of a 3,600-square-foot metal shop building, an on-site wastewater treatment and septic system, and a 20-foot wide all-weather gravel access road. The site is designed to accommodate parking and storage for up to twelve pickup trucks, twelve cargo or flatbed trailers, and various lawn maintenance equipment. Daily operations will support up to twenty-seven employees working one shift from Monday through Saturday, 6:00 a.m. to 4:00 p.m. The project was approved on September 23, 2026, following a California Environmental Quality Act review that resulted in a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program. Key compliance requirements include pre-construction biological surveys and daily inspections to protect the San Joaquin kit fox, the implementation of best management practices for erosion and sediment control, and adherence to regional water quality and air quality standards. Additionally, the project mandates specific visual screening using valley oak trees and hedges at least six feet high, shielded exterior lighting to prevent spillover, and strict adherence to state laws regarding the discovery of Native American remains. Prohibited activities at the site include fuel dispensing, equipment washing, and the storage of hazardous waste, pesticides, or fertilizers.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Pixley Travel Center
Solicitation # 2025100833
The Pixley Travel Center project, managed by the Tulare County Resource Management Agency, involves the development of a comprehensive travel facility on two contiguous parcels totaling 36.47 acres at the intersection of Road 124 and Avenue 120 in Pixley, California. The southern parcel will house the primary infrastructure, including a 20,000-square-foot convenience store, a 3,100-square-foot fast-food restaurant with a drive-thru, 16 gasoline fueling islands, two RV fueling islands, and 18 electric vehicle charging stations. The northern parcel is designated for future development, potentially featuring a 17,000-square-foot truck wash and service building. Additional site features include 10 diesel islands, biodiesel and DEF dispensers, extensive truck parking, two 80,000-gallon fire-water tanks, and a pet and children's play area. The project requires the demolition of an existing cotton-ginning facility and the implementation of a stormwater pollution prevention plan, with water provided by an on-site groundwater well and wastewater managed through septic systems. The project timeline spans from January 1, 2026, through June 16, 2027, progressing through phases of site preparation, grading, building construction, paving, and architectural coating. Environmental compliance is a critical component, as evidenced by a Mitigated Negative Declaration and a Notice of Determination approved by the Tulare County Board of Supervisors on January 27, 2026. Key requirements include adherence to Cal/OSHA safety orders for underground work and strict biological monitoring. This includes pre-construction surveys for special status plant and animal species, employee education programs led by qualified biologists, and compliance with the Migratory Bird Treaty Act during nesting seasons. The project also involves coordination with the State Water Resources Control Board and the Department of Conservation to manage groundwater and protect agricultural land resources.
Highway, Street, and Bridge Construction

POSTED

9 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Bridge Preventative Maintenance Program – Group 5 Project
Solicitation # 2025091296
The Bridge Preventative Maintenance Program Group 5 Project, solicitation number 2025091296, is a Tulare County initiative designed to extend the service life and improve the safety of 17 bridges currently in good condition. The scope of work focuses on correcting minor structural defects to avoid costly future reconstruction, with primary activities including high-priority scour protection repairs, deck treatment, spall repair, structural connection and joint repairs, and bridge bearing repairs. Additional work involves asphalt concrete overlay removal, erosion control, and the revegetation of disturbed areas. The project is expected to be completed within approximately 12 months and may require limited temporary construction easements and partial right-of-way. The project is subject to strict environmental and regulatory compliance, including NEPA and CEQA standards. Key requirements include the management of lead-based paint to ensure no visible dust and the handling of chemically treated wood waste according to DTSC regulations and Caltrans 2023 Standard Specifications. Environmental safeguards are emphasized, requiring a project biologist to inspect excavated holes and trenches for protected species, such as the California Tiger Salamander, and to monitor bat habitat trees. Construction will involve temporary road closures and detours lasting between 4 and 6 hours at select sites. The project is managed by the Tulare County Resource Management Agency, with oversight provided by the Chief Planner, Project Engineer, and Environmental Planner.
Highway, Street, and Bridge Construction

POSTED

9 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS