Aratina Solar Project by 64NB 8ME LLC (8Minute Energy) Response to Comments

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aratina Solar Project, developed by 64NB 8ME LLC under the oversight of Kern County and with environmental permitting from the California Department of Fish and Wildlife, entails the development of a utility-scale photovoltaic solar facility spanning approximately 1,059 to 1,376 acres in southeastern Kern County, California. The project includes the installation of photovoltaic panels mounted on solar trackers, service roads, power collection systems, overhead and underground transmission lines, electrical substations, energy storage systems, weather monitoring stations, and operations and maintenance facilities. The facility is located west and south of Desert Lake, north and south of State Route 58 between Gephart Road and Boron Avenue, primarily in unincorporated areas near Boron. A core component of the project is the authorization of incidental take of several protected species under the California Endangered Species Act, including the endangered desert tortoise and threatened Mohave ground squirrel, as well as candidate species such as the western burrowing owl, Crotch’s bumble bee, and western Joshua tree. Amendment No. 2 specifically modifies the take authorization for western Joshua tree sprouts and adjusts project boundaries and permittee lists, reflecting evolving project configurations and regulatory adjustments. Compliance is governed by a series of environmental permits and agreements, including an Incidental Take Permit and a Streambed Alteration Agreement under Fish and Game Code Section 1602, with mitigation and monitoring plans approved by CDFW to offset habitat impacts. All project activities are subject to state environmental review under CEQA and statutory requirements under the California Endangered Species Act, with no federal procurement clauses or standard FAR sections applicable to this arrangement. The project is not a federal contract and does not include pricing data, delivery schedules, inspection protocols, or federal contract administration elements such as COR/COTR designations, invoicing systems, or appropriation codes. Instead, the regulatory framework is centered on environmental compliance, with mandatory payments to CDFW for environmental filing fees under Fish and Game Code Section 711.4, and all approvals tied to the EPIMS-KER-53288-R4 permit record. Key regulatory contacts include Ronelle Candia of Kern County Planning and Natural Resources and Jim Vang of CDFW, who serve as lead points for coordination and oversight. There is no formal contract value, payment office, or procurement method established, as this is an environmental compliance agreement rather than a federal acquisition. The approval dates for amendments—January 2

General Info

Aratina Solar Project approved for utility-scale PV facility with incidental take permits for protected species in Kern County.

Agency

California → Kern County

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(7)

KER-25818-AratinaSolar-Amend1-Notice of Determination

PDFnotice-of-determination

Notice of Determination for Aratina 1 Solar Project Major Amendment No. 2

PDFnotice-of-determination

KER-25818 Aratina Solar Project Amendment 1 Notice of Determination

PDFnotice-of-determination

EPIMS-KER-53288-R4 Amendment 1 Notice of Determination

PDFnotice-of-determination

2024-038-A2 Notice of Determination for Aratina 2 Solar Project

PDFnotice-of-determination

EPIMS-KER-53288-R4 Notice of Determination for Aratina 2 Solar Project

PDFnotice-of-determination

2024-038_NOD

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts
Amanda CanepaSenior Environmental Scientist Specialist
Ronelle CandiaLead Agency

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number EPIMS-KER-25818-R4, pursuant to section 1602 of the Fish and Game Code to the Project Applicants, 64NB 8ME LLC, 91MC 8ME LLC, and 103KB 8ME LLC. The Project includes activities related to the construction of a utility-scale photovoltaic (PV) solar generation facility over 1,376 acres and over a generation-intertie (gen-tie) transmission line that will extend approximately 6.5 miles east of the solar generation facility. Activities included in the larger PV solar facility development that will intersect Project streams include the construction of security fences, access roads, PV arrays, operations and maintenance (O&M) buildings, substations, energy storage systems (ESS), and transmission line infrastructure. Changes to the Project associated with Amendment No. 1 are inclusion of two additional permittees; change of the Project representative, contact information, and Project title; modification of Project site locations and acreages of solar development and stream impacts; and revised avoidance and minimization measures.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
SOLAR PHOTOVOLTAIC SYSTEM DEVELOPMENT AND POWER PURCHASE AGREEMENT
Solicitation # BD-27-1355-PRC-YPRC-131972
The Town of Yarmouth is inviting qualified proposers to submit bids for the lease of a parcel of municipal property at 74 Town Brook Road in West Yarmouth, Massachusetts, to develop, install, operate, and maintain a solar photovoltaic system. The selected proposer will also enter into a Power Purchase Agreement with the Town to sell the generated electricity, ensuring a long-term, sustainable energy supply. The project aligns with the Town’s goals for renewable energy adoption and cost efficiency, with all development and operational responsibilities falling to the proposer, who must meet the technical and financial criteria outlined in the solicitation. Proposals must demonstrate proven experience in solar project development, financial viability, and compliance with local and state regulations. Bids are due by September 10, 2026, and must be submitted in response to solicitation number BD-27-1355-PRC-YPRC-131972, which was posted on August 4, 2026. The process is managed by the Massachusetts Procurement division under the agency name PRC - PROCUREMENT, with Svetlana Salemme serving as the primary point of contact. The property is located in Barnstable County, within the 02673 ZIP code, and performance is expected to occur entirely on site. While no specific set-aside or NAICS code is designated, the solicitation is open to all qualified entities and emphasizes technical expertise, project scalability, and adherence to the Town’s energy objectives. Interested parties are encouraged to review the details via the provided Commbuys link.
PRC - PROCUREMENT

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
New
SLED
Orleans Solar-Storage ProjectAdapture Renewables, Inc. through its affiliate Orleans Energy Center, LLC is proposing the Orleans Solar-Storage Project on approximately 160 acres of privately owned land in unincorporated western Fresno County, California. The project includes a 25-megawatt alternating current photovoltaic solar energy facility coupled with a 25-megawatt alternating current battery energy storage system capable of storing up to 200 megawatt-hours of electricity, providing up to eight hours of discharge capacity. The development will feature an onsite electrical substation, internal wiring and collection infrastructure, and a new 1-mile, 70-kilovolt generation-tie line to connect to the existing Pacific Gas and Electric Company Giffen Substation. The project aims to enhance grid reliability and support renewable energy goals in the region by integrating solar generation with scalable storage. All development activities are subject to regional planning and environmental review processes overseen by Fresno County. The primary point of contact for the project is Arianna Brown, Planner at Fresno County, reachable at 559-600-4245 or arbrown@fresnocountyca.gov. Additional contacts include Sarah Spann, Principal Environmental Planner at Stantec, and Chrissy Gaglione, Development Manager at Adapture Renewables. The project has been posted under a forecast notice with a public record identifier of 2026080074 and is anticipated to proceed through environmental assessments and permitting phases in the coming years. The location of performance is designated as Fresno, California, with the zip code 93608, indicating the general area of impact. No formal solicitation number or set-aside classification has been assigned, as this is a private development proposal requiring local regulatory approval rather than a competitive government procurement.
Fresno County

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 221114
International
ELJ2026-SolarSystems: Procurement of Solar Systems
Solicitation # ELJ2026-SolarSystems
e-Learning Jamaica Company Limited, an agency of the Ministry of Education, Skills, Youth and Information, is seeking qualified suppliers to bid for the supply, installation, maintenance, and warranty support of solar system kits across multiple lots, with bidders permitted to submit proposals for up to two lots. Participation is strictly limited to those registered on the Government of Jamaica Electronic Procurement Portal, and all tender documents, clarifications, and submissions must be completed online via www.gojep.gov.jm; no hard copies or physical submissions will be accepted. To be deemed eligible, bidders must provide a valid Tax Compliance Certificate, proof of current registration with the Public Procurement Commission or National Commercial Council in the Electrical Appliance and Equipment category, and a bid security of JMD $200,000. Tender documents became available for download on July 22, 2026, with a final deadline for clarification requests on August 24, 2026, at 11:00 a.m., and all bids must be submitted by August 31, 2026, at 11:00 a.m. local time, followed by an online bid opening at 11:15 a.m. on the same day. The awarding authority reserves the right to reject any or all bids, including the lowest-priced submission, and may terminate the procurement process at any time prior to contract award without incurring liability to participants.
e-Learning Jamaica Limited

POSTED

16 days ago

DEADLINE

in 24 days
View Details
NAICS: 221114
Federal
Preventive Maintenance Services for Photovoltaic Systems
Solicitation # PR15733540
The United States Consulate General in Hyderabad, India, is soliciting professional services to perform preventive maintenance on its photovoltaic systems under solicitation number PR15733540, with responses due by August 26, 2026. The contract, classified under NAICS code 221114 for Solar Electric Power Generation, is a commercial item acquisition governed by FAR 52.212-1 and 52.212-4, with a firm-fixed-price structure expected. The base performance period is one year, with four one-year option periods available, allowing for a potential five-year contract duration. Work involves semi-annual maintenance tasks including cleaning and inspecting DC disconnects, inverter servicing, cable polarity verification, and system performance evaluations, all aligned with IEC 62446-1:2016 standards and manufacturer guidelines. Deliverables require completion of maintenance checklists, submission of performance test results within 30 days, and ensuring no more than one customer complaint per month. Contractors must provide an operational strategic plan, evidence of qualified personnel and equipment, a plan to secure necessary licenses, and a list of clients from the past five years. Key personnel must be fluent in English, sign off on all tasks, and submit reports to the COR within five business days. All offerors must be registered in SAM, hold valid GST certification if based in India, maintain minimum liability insurance of INR 1 million, comply with Indian labor laws, and adhere to prohibitions on the use of ByteDance-covered applications such as TikTok. No formal security clearances are mandated, but physical access to the consulate requires compliance with on-site identification and conduct protocols. Contractors must avoid any misrepresentation of government affiliation and cannot use Department of State logos. Subcontractor sales restrictions, whistleblower protections, labor standards, and anti-trafficking clauses are incorporated, with electronic funds transfer required for payments submitted via email to MissionIndiaPayments@state.gov. Performance will be evaluated based on past performance, offeror responsibility including financial health and technical capability, and pricing, with award determined through a best-value trade-off process rather than lowest price technically acceptable. No packaging or marking requirements beyond electrical warning labels are specified, and no FOB terms or Incoterms are defined in the solicitation.
American Consulate Hyderabad

POSTED

17 days ago

DEADLINE

in 19 days
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPA
Solicitation # 0000039798
The California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

23 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

24 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Encino Reservoir Floating Solar Pilot ProjectThe Encino Reservoir Floating Solar Pilot Project involves the installation of a 5-megawatt floating solar panel array on the southwest portion of the reservoir, complemented by a 30-kilowatt ground-mount photovoltaic system on the same property. All electrical infrastructure—including inverters, transformers, and switchgear—will be situated adjacent to the ground-mount system and connected to the existing 34.5-kilovolt above-ground distribution line within the reservoir property. Additionally, a 5-megawatt, 20-megawatt-hour iron-flow battery energy storage system will be deployed on a 6,500-square-foot area north of the reservoir to support grid stability and energy dispatch. Construction is scheduled from July 2026 through July 2027, with distinct phases for floating solar, electrical connections, inverter installation, system energization, battery deployment, and ground-mount solar completion. The project is led by the Los Angeles Department of Water and Power, with environmental compliance as a central focus under CEQA and state regulations, requiring mitigation for air quality, biological resources, water quality, noise, and greenhouse gas emissions. All environmental assessments and mitigation plans are documented in eight technical appendices covering air quality, biological resources, wetland delineation, special-status plant surveys, avian habitat impacts, cultural resources, greenhouse gas emissions, and noise and vibration. Inspection and acceptance occur on-site at the reservoir property, governed by standards from the Regional Water Quality Control Board, California Air Resources Board, South Coast Air Quality Management District, Clean Water Act, and federal NAAQS, with oversight conducted by LADWP as the Lead Agency. The primary point of contact for submittals and coordination is David Norris, Environmental Planning and Assessment Manager, reachable via mail at 111 North Hope Street, Los Angeles, CA 90012, by phone at (213) 367-3509, or by email at david.norris@ladwp.com. Proposals for public comment are due by January 13, 2026, and must be submitted either electronically through the LADWP environmental notices portal or as 15 hard copies along with a summary form. No formal contract pricing, line items, or federal procurement clauses are specified in the documentation, and while state environmental certifications under the Clean Water Act are provided, no federal acquisition representations, socioeconomic certifications, or payment terms are included. The project reflects
California Los Angeles Department of Water and Power

POSTED

25 days ago

DEADLINE

N/A
View Details