Lockhart Solar (PROJ-2022-00066)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Lockhart Solar Project (PROJ-2022-00066) involves the construction and operation of two 4-Megawatt solar photovoltaic power generating facilities with integrated long-duration battery storage. Located on 75 acres northwest of Hinkley, California, the project utilizes solar PV modules on single-axis trackers arranged in north-south arrays. The infrastructure includes inverters, transformers, switchgear, and a weather station, with electrical conduit and transmission lines installed both overhead and underground to interconnect with Southern California Edison's 33kV distribution grid. Managed by San Bernardino County and applied for by Juniper Energy, LLC, the project was approved on July 17, 2025, following a Conditional Use Permit process. It complies with the California Environmental Quality Act (CEQA) under Public Resources Code Sections 21000-21174, with a Notice of Determination filed on July 24, 2025, confirming that a Negative Declaration was prepared and no significant environmental impacts were identified. Administrative oversight is provided by Planner Delanie Garlick.
General Info
Agency
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS