Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Pronghorn Solar Plus, LLC is seeking Conditional Use Permit No. 26-009 from the City of Lancaster, California, to entitle, construct, operate, maintain, and decommission a utility-scale solar photovoltaic and battery energy storage system. The proposed project, located on approximately 320.93 acres within the RR-2.5 zone, will feature up to 50 megawatts of solar generation and a 50 MW battery energy storage system. Technical infrastructure includes 34.5 kV collection lines, a project substation to step up voltage to 66 kV, and a generation transmission line connecting directly to the existing SCE Piute substation. The facility is designed to deliver renewable energy to the statewide electricity transmission grid under a long-term Power Purchase Agreement with a load serving entity or power off-taker. For environmental analysis purposes, the project is expected to operate for 30 years, after which the operator may continue power generation or decommission the site. The City of Lancaster is serving as the lead agency for the project, with CEQA compliance being managed through a draft Environmental Impact Report. Public review and scoping for the project were scheduled between September 24, 2026, and October 26, 2026.

General Info

Pronghorn Solar Plus seeks permit for 50MW solar and battery system in Lancaster.

Agency

California → City of Lancaster

Place of Performance

90th Street East, Avenue J-8, Lancaster, CA, 93535

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

DudekEncinitas, CA

Full Description

Show more
Pronghorn Solar Plus, LLC (“Applicant”) proposes to entitle, construct, operate, maintain and decommission a utility-scale solar photovoltaic (PV) electrical generating and storage facility that would generate and deliver renewable energy to the statewide electricity transmission grid. As shown on Figure 2, Proposed Project, the project would include the construction and operation of up to 50 megawatts (MW) of PV solar generation, a BESS with a capacity of up to 50 MW, installation of 34.5 kilovolt (kV) collection lines and a 66 kV generation transmission (gen-tie) line, and a project Substation that would step up the voltage from 34.5 kV to 66 kV. A gen-tie line would directly connect the project substation to the existing SCE Piute substation. Per Sections 17.08.290 and 17.08.050 of the City of Lancaster Municipal Code, utility scale solar facilities and utility scale BESS are allowable uses subject to a conditional use permit (CUP) within the RR-2.5 zone. The Applicant is seeking a CUP (CUP No. 26-009) for construction and operation of the project. The project would sell the renewable energy it produces under the terms of a long-term Power Purchase Agreement (PPA) with a load serving entity or other power off-taker. For purposes of the CEQA analysis, it is assumed the project would operate for 30 years. Upon completion of the PPA term, the project operator may, at its discretion, continue to generate and sell power from the project, or decommission and remove the system and its components. Upon decommissioning, project structures not needed for subsequent use would be removed from the project site and the site could be converted to other uses in accordance with applicable land use regulations in effect at that time.

Similar Contracts

Same NAICS industry code

NAICS: 221114
SLED
RPCA Solar 17, LLC Project (PSP 25-092)
Solicitation # PSP 25-092
RPCA Solar 17, LLC is developing a small-scale utility solar generation facility in unincorporated Tulare County, California, near Porterville. The project will be situated on approximately 13.6 acres across three parcels totaling 17.6 acres within the Exclusive Agricultural zoning district. The project sponsor has secured a long-term lease agreement with the property owner, the Antoine Bechara Revocable Trust, to facilitate the construction and operation of the facility. Once complete, the project will generate up to 3 megawatts of alternating current clean energy using single-axis tracking solar modules. The generated power is intended to be sold to the Clean Power Alliance through a long-term Power Purchase Agreement, with interconnection provided via Southern California Edison's existing electrical distribution system. The facility will feature a seven-foot chain-link fence with wildlife-permeable design elements and will be accessed by a 20-foot wide all-weather gravel road. Electrical connections will transition from existing overhead lines to underground utility runs leading to a central power station and transformer. The site will be operated remotely with professional operations and maintenance contractors managing the facility and native groundcover restoration. Environmental compliance is being managed through an Initial Study and Mitigated Negative Declaration, with all mitigation measures incorporated into a formal Monitoring and Reporting Program to ensure the protection of the surrounding agricultural and rural residential landscape.
Tulare County

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Request for Information Relative to the Process of Renewable Energy Programs
Solicitation # 510-27
The New Hampshire Department of Administrative Services, Bureau of Purchase and Property, has issued Request for Information (RFI) 510-27 to gather data on renewable energy programs, specifically focusing on solar projects within the state. The objective is to evaluate options such as Community Solar, Power Purchase Agreements, and Group Net Metering to refine the state's energy portfolio and reduce fossil fuel reliance in alignment with Executive Order 2016-03, NH RSA 362, and PUC 909. The state is seeking information on renewable energy rebate solutions and the availability of projects that are either immediate or expected to come online within the next six years. This solicitation is for informational purposes only and does not commit the state to issuing a formal Request for Proposal or awarding a contract. Responses are due by December 16, 2026, at 9:00 AM EST and must be submitted via email to [email hidden], with a maximum file size limit of 7 MB. Submissions must include a detailed company profile and be clearly marked with the RFI number, due date, and the purchasing agent's name. There is no set-aside status for this solicitation. All responses are subject to public records laws, and any proprietary information must be submitted as a separate redacted copy with a supporting rationale letter.
Das Purchasing (statewide Bids & Contracts)

POSTED

11 days ago

DEADLINE

in 19 days
View Details
NAICS: 221114
SLED
Solar Photovoltaic System(s)
Solicitation # CSCU 27-1409465
Connecticut State Colleges and Universities (CSCU) is soliciting proposals from qualified developers to provide a turnkey solution for the financing, design, installation, operation, and maintenance of solar photovoltaic (PV) systems. The project spans multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College campuses at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will deliver electricity to these institutions under a Power Purchase and Licensing Agreement (PPA) with a 20-year base contract term, potentially extending up to 25 years. The scope includes all engineering, materials, and labor, with a requirement that the contractor submit the project to Eversource’s large LREC/ZREC program. The project is anticipated to commence on February 8, 2027, with a completion date of December 31, 2028. Proposals are due by December 16, 2026, and will be evaluated based on factors such as generation cost per kilowatt-hour, minimum yearly kilowatt-hours provided, project readiness, and the strength of funding commitments. Technical requirements include a minimum 30-year design life for structural components, certification by Underwriter Laboratories (UL), and approval from the State Fire Marshal and FM Global. This solicitation is not a set-aside.
DAS Procurement

POSTED

24 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS