Starlight Solar Major Use Permit

Forecast
PDS2022-MUP-22-010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Starlight Solar Project, identified by solicitation number PDS2022-MUP-22-010, is a utility-scale energy development located on approximately 588 acres in southeastern San Diego County, California. The project consists of a 100 MW alternating current solar photovoltaic facility and a 217.4 MW battery energy storage system, to be constructed in two phases over an estimated 30 months. Infrastructure includes panels with a maximum height of 12 feet, inverters, transformers, a collector substation, and a generation-tie line connecting to the SDG&E Boulevard substation. To support conservation, the project includes a 448-acre off-site biological open space easement. The facility will be unoccupied, secured, and remotely monitored on land zoned as General Rural. The project is subject to rigorous environmental and regulatory compliance under CEQA and NEPA, requiring a Major Use Permit and a Fire Services Agreement. A Draft Environmental Impact Report identified significant impacts to biological, cultural, and tribal resources, hazards, hydrology, and wildfire, most of which will be reduced to less than significant through specific mitigation measures. However, impacts to aesthetics remain significant and unavoidable. Key requirements include the implementation of a Fire Protection and Mitigation Agreement, the submission of a Stormwater Pollution Prevention Plan, and coordination with agencies such as Caltrans, the California Department of Fish and Wildlife, and the U.S. Army Corps of Engineers. The San Diego County Board of Supervisors officially approved the project on September 16, 2026, certifying the EIR and adopting a Statement of Overriding Considerations.

General Info

100MW solar and 217.4MW battery project approved for San Diego County, California.

Place of Performance

South of Interstate 8 and Old Highway 80, east of Tierra del Sol Road and Along Jewel Valley Ro, San Diego, CA, 91905

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → San Diego County
Office AddressN/A
Contacts
Nicholas KoutoufidisLand Use/Environmental Planner
J. WhalenProject Applicant

Interested Companies (1)

SWCA Environmental ConsultantsBroomfield, Colorado

Full Description

Show more
The Starlight Solar Project consists of a Major Use Permit (MUP) and Fire Protection and Mitigation Agreement for the construction and operation of a 100 megawatt (MW) solar photovoltaic energy generation facility with 217.4 MW of battery energy storage on approximately 588 acres. Phase one of the project consists of development of approximately 20 MW of solar generation and 17.4 MW of battery energy storage on approximately 125 acres. Phase two consists of development of approximately 80 MW of solar generation and 200 MW of battery energy storage on approximately 456 acres. The project includes photovoltaic modules mounted on support structures, inverter and transformer platforms, battery storage facilities, an on-site collector substation, a transmission line to connect the project to the existing SDG&E Boulevard Substation, consisting primarily of underground facilities with a short overhead segment, internal access and fire roads, fencing, fuel modification zones, six water tanks for fire protection, and associated site infrastructure to support the solar energy generation and storage facility. PDS2022-MUP-22-010; PDS2022-ER-22-21-002

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → San Diego County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS