City Owned Solar Development – Brand Landfill

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Glendale and Glendale Water & Power are implementing the Brand Park Solar Photovoltaic System Project, which involves the construction and operation of a city-owned 1.815 megawatt ground-mount solar system. The project is located on a 2.1 acre portion of a 219 acre parcel at 1601 West Mountain Street in Glendale, California, situated within Pomeroy Canyon and the southern Verdugo Mountains. The installation will be placed on a manufactured flat pad of an inactive landfill, requiring only minor site preparation and leveling without significant grading. The infrastructure consists of 3,300 ground-mounted PV panels, transformers, inverters, and combiner panels reaching heights of approximately 6 feet 6 inches, with electrical distribution lines installed on new wood utility poles along existing access roads. The project is categorized as exempt from the California Environmental Quality Act under CEQA Guidelines Sections 15303 and 15304. To ensure environmental compliance and the protection of biological resources, the project requires adherence to a Biological Resources Assessment prepared by TRC. Mandatory pre-construction surveys must be completed before building permits are issued and construction begins, specifically targeting nesting birds, raptors, the Least Bell's vireo, special status wildlife, Crotch's Bumble Bee, and the Western Spadefoot Toad. The project is managed by the City of Glendale with primary coordination through the Principal Planner and Business Transformation Manager.

General Info

City of Glendale will build a 1.815 megawatt solar facility on a landfill.

Agency

California → City of Glendale

Place of Performance

Grandview Avenue and Brand Park Drive, Glendale, CA, 91201

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendale
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Glendale
Office AddressN/A
Contacts
Dennis JoePrincipal Planner
Brian SalazarBusiness Transformation Manager

Full Description

Show more
The project consists of the construction and operation of a City-owned 1.815 megawatt ground-mount solar photovoltaic system (utility and transmission facilities) that will be located in a 2.1 acre (91,773 square-feet) area of a 219 acre parcel sited within Pomeroy Canyon and the southern portion of the Verdugo Mountains. The Brand Park Solar Photovoltaic System Project is located in the Special Recreation (SR ) Zone and includes construction of 3,300 ground mounted modules (PV panels), transformers and inverters and combiner panels extending to an approximate height of 6 feet and 6 inches (Project). The Project will be constructed above an inactive landfill that consists of a manufactured flat pad and does not involve grading (cut and fill of material); however, is anticipated to involve minor site preparation to level the surface of the existing previously graded closed landfill site. The Project is proposed on City-owned property located above Brand Park and along the existing access road. Electrical distribution lines will be installed overhead mounted on a series of new wood utility poles in or adjacent to existing access road.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is establishing a Qualified Vendors Pool (QVP) of energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties across California. This solicitation is a Request for Qualifications (RFQ) where vendors are evaluated on a pass/fail basis to enter the pool. Once qualified, vendors will be invited to compete for specific projects via future Requests for Proposals (RFPs). Projects will be categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). Awarded projects will be implemented through a Site Lease Agreement (SLA) and a Power Purchase Agreement (PPA) with terms ranging from 20 to 25 years. Vendors must finance the projects with no upfront capital required from state agencies, selling the electrical output at a fixed price per kilowatt hour. Key requirements for qualification include being a creditworthy company in good standing with the California Secretary of State, providing a Darfur Contracting Act Certification, and demonstrating the ability to meet comprehensive insurance requirements. For future installations, vendors must hold appropriate California licenses, such as C-10 Electrical or C-46 Solar certifications.
California Department of General Services

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

18 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

18 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS