Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Savira Solar Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Savira Renewables, LLC proposes the construction of the Savira Solar Project in Blythe, Riverside County, California. This utility-scale facility will feature solar photovoltaic arrays generating up to 150 MW of renewable energy, supported by a 250 MW Battery Energy Storage System (BESS). The project infrastructure includes an operations and maintenance building, a 230 kV substation, and a new 1.8-mile 230 kV generation tie-line to deliver electricity to the statewide transmission grid. The project site encompasses approximately 535 acres and is currently undergoing comprehensive environmental review under the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The project is subject to rigorous technical and regulatory requirements, including geotechnical assessments for foundation design, water supply evaluations per Senate Bill 610, and detailed biological and cultural resource monitoring. Key compliance mandates include the use of HAZWOPER-certified personnel for ordnance handling, the presence of qualified archaeologists during grading, and the implementation of a Worker Environmental Awareness Program. Additionally, the project must adhere to a Construction Traffic Control Plan and a Fire Protection and Prevention Plan for the BESS. While the Draft Environmental Impact Report indicates that most environmental impacts can be mitigated, operational aesthetics remain a significant and unavoidable impact.

General Info

Savira Renewables to build 150 MW solar project with 250 MW battery storage in Blythe, California.

Agency

California → Riverside County

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Rice Road, north of Interstate 10, Blythe, CA, 92239

Set-Aside

NONE

Documents

(17)

Savira Solar Project Environmental Summary

PDFenvironmental-summary

Savira Solar Preliminary Geotechnical Engineering Report April 2026

PDFpreliminary-geotech-report

Appendix H - Water Supply Assessment for Savira Solar Project

PDFwater-supply-assessment

Appendix G - Phase I Environmental Site Assessment for Savira Solar Project

PDFphase-i-esa

Savira Solar Project Draft Transportation Analysis June 2025

PDFtransportation-analysis

Savira Solar Project Biological Resources Technical Report May 2026

PDFbiological-resources-technical-report

Savira Solar Project CEQA Scoping Summary Report June 2025

PDFscoping-summary-report

Appendix E - Cultural Resources

PDFother

Savira Solar Project Draft Environmental Impact Report Notice of Availability

PDFpresolicitation

Appendix B - Glare Analysis for Savira Solar Project

PDFglare-analysis

Appendix I - Hydrology Report for Bajada Solar Project

PDFsow

Appendix F1 - Geotechnical Desktop Review for Savira Renewables Project

PDFgeotechnical-report

Appendix F3 - Summary Report Rev - Savira Solar Geotechnical Response

PDFreport

Savira Solar Project Draft Environmental Impact Report Notice

PDFpresolicitation

Savira Solar Project Draft Environmental Impact Report August 2026

PDFenvironmental-impact-report

CUP240027 Savira Solar Project Draft EIR

PDFdraft-eir

Appendix C - Air Quality and Greenhouse Gas Analysis for Savira Solar Project

PDFtechnical-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jessica KoteenSenior Manager
Deandra CassProject Applicant
Elizabeth Mora-RodriguezLead/Public Agency

Interested Companies (1)

Show more
Panorama Environmental
San Francisco, CA

Full Description

Show more
Savira Renewables, LLC proposes to construct the Savira Solar Project, a utility-scale solar photovoltaic (PV) electrical generating and storage facility and associated infrastructure to generate and deliver renewable electricity to the statewide electricity transmission grid. The Project would generate up to approximately 150 megawatts (MW) of renewable energy via arrays of solar PV panels. Project facilities include an Operations and Maintenance (O&M) building, a Project substation, and up to approximately 250 MW Battery Energy Storage System (BESS), and access driveways. The Savira Solar Project would include a 230 kilovolt (kV) substation. From there, the solar energy generated by the Project would be transmitted via the new approximately 1.8-mile-long, 230 kV gen-tie line.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a solar generating facility at the Royalston Landfill, located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility size between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town aims to establish a long-term agreement, not to exceed 30 years, through a site lease, Power Purchase Agreements, or other financial structures that provide revenue, energy savings, and host community benefits. Proposals are due by October 8, 2026, and must include a conceptual site plan, a detailed project schedule, and a financial structure. The selection process will be based on the most advantageous proposal, weighing price and qualifications, including technical and management capacity, past performance on similar projects, and the merits of the proposed plan of services. Key requirements include the appointment of a primary staff member registered as a Massachusetts Professional Engineer (Civil) for at least 10 years and a project history of at least three similar completed projects. Developers are responsible for all permitting, utility interconnection risks, and the protection of the landfill cap and forest resources. Mandatory submissions include comprehensive certifications regarding non-collusion, tax compliance, and non-discrimination, as well as the provision of decommissioning financial security and significant insurance coverage, including at least 5 million dollars in commercial general liability.
TORTH - Town of Royalston - Town Hall

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-132882
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, finance, construct, operate, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill, located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the Town specifically open to proposals up to 5 MW AC and the potential inclusion of Battery Energy Storage Systems (BESS). The objective is to establish a long-term agreement, not to exceed 30 years, through a land lease, Power Purchase Agreement (PPA), or other financial structures that provide sustainable revenue, energy savings, and financial benefits to the Town. The selected developer will be responsible for all project-related costs, including permitting, interconnection, and maintenance, while ensuring the integrity of the landfill cap in accordance with Massachusetts Department of Environmental Protection (MassDEP) regulations. Key requirements include the submission of a conceptual site plan, an independent timber appraisal by a Massachusetts Licensed Forester, and the provision of decommissioning financial security via a surety bond or letter of credit. Proposals are evaluated based on a combination of price, technical and management capacity, past performance, and the expertise of key personnel, including a requirement for a primary staff member to be a registered Massachusetts Professional Engineer (Civil) with at least 10 years of experience. The deadline for submission is October 8, 2026, at 12:00 PM EST.
TORTH - Town of Royalston - Town Hall

POSTED

16 days ago

DEADLINE

in 26 days
View Details
NAICS: 221114
SLED
City Owned Solar Development – Brand LandfillThe City of Glendale and Glendale Water & Power are implementing the Brand Park Solar Photovoltaic System Project, which involves the construction and operation of a city-owned 1.815 megawatt ground-mount solar system. The project is located on a 2.1 acre portion of a 219 acre parcel at 1601 West Mountain Street in Glendale, California, situated within Pomeroy Canyon and the southern Verdugo Mountains. The installation will be placed on a manufactured flat pad of an inactive landfill, requiring only minor site preparation and leveling without significant grading. The infrastructure consists of 3,300 ground-mounted PV panels, transformers, inverters, and combiner panels reaching heights of approximately 6 feet 6 inches, with electrical distribution lines installed on new wood utility poles along existing access roads. The project is categorized as exempt from the California Environmental Quality Act under CEQA Guidelines Sections 15303 and 15304. To ensure environmental compliance and the protection of biological resources, the project requires adherence to a Biological Resources Assessment prepared by TRC. Mandatory pre-construction surveys must be completed before building permits are issued and construction begins, specifically targeting nesting birds, raptors, the Least Bell's vireo, special status wildlife, Crotch's Bumble Bee, and the Western Spadefoot Toad. The project is managed by the City of Glendale with primary coordination through the Principal Planner and Business Transformation Manager.
City of Glendale

POSTED

17 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Santa Barbara Community College District Solar Power Array & Battery Energy Storage System MicrogridThe Santa Barbara Community College District is implementing a solar power array and battery energy storage system microgrid at the Cliff Campus in Santa Barbara, California. This project involves the installation of 1.6 megawatts of carport-mounted solar arrays, battery energy storage systems, transformers, inverters, and related electrical infrastructure. The work will be concentrated within existing parking facilities on the East and West Campuses, specifically targeting Parking Lots 1A, 1B, 4A, 4B, 4C, and 4D. The primary objectives of the installation are to provide 8 to 24 plus hours of energy resilience, reduce the district's carbon footprint, and lower long-term energy costs through renewable energy generation. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from the California Environmental Quality Act pursuant to Categorical Exemption Class 1 for Existing Facilities, as the project occurs within previously developed areas with no expansion of use or new land disturbance. Project administration is managed by the Santa Barbara Community College District, with key coordination involving Rachel Hollander and Chris Renbarger. The project is classified under NAICS code 221114 and was formally documented via a Notice of Exemption dated June 4, 2026.
Santa Barbara Community College District

POSTED

17 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS