Savira Solar Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Savira Renewables, LLC proposes the construction of the Savira Solar Project in Blythe, Riverside County, California. This utility-scale facility will feature solar photovoltaic arrays generating up to 150 MW of renewable energy, supported by a 250 MW Battery Energy Storage System (BESS). The project infrastructure includes an operations and maintenance building, a 230 kV substation, and a new 1.8-mile 230 kV generation tie-line to deliver electricity to the statewide transmission grid. The project site encompasses approximately 535 acres and is currently undergoing comprehensive environmental review under the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The project is subject to rigorous technical and regulatory requirements, including geotechnical assessments for foundation design, water supply evaluations per Senate Bill 610, and detailed biological and cultural resource monitoring. Key compliance mandates include the use of HAZWOPER-certified personnel for ordnance handling, the presence of qualified archaeologists during grading, and the implementation of a Worker Environmental Awareness Program. Additionally, the project must adhere to a Construction Traffic Control Plan and a Fire Protection and Prevention Plan for the BESS. While the Draft Environmental Impact Report indicates that most environmental impacts can be mitigated, operational aesthetics remain a significant and unavoidable impact.

General Info

Savira Renewables to build 150 MW solar project with 250 MW battery storage in Blythe, California.

Agency

California → Riverside County

Place of Performance

Rice Road, north of Interstate 10, Blythe, CA, 92239

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jessica KoteenSenior Manager
Deandra CassProject Applicant
Elizabeth Mora-RodriguezLead/Public Agency

Interested Companies (1)

Panorama EnvironmentalSan Francisco, CA

Full Description

Show more
Savira Renewables, LLC proposes to construct the Savira Solar Project, a utility-scale solar photovoltaic (PV) electrical generating and storage facility and associated infrastructure to generate and deliver renewable electricity to the statewide electricity transmission grid. The Project would generate up to approximately 150 megawatts (MW) of renewable energy via arrays of solar PV panels. Project facilities include an Operations and Maintenance (O&M) building, a Project substation, and up to approximately 250 MW Battery Energy Storage System (BESS), and access driveways. The Savira Solar Project would include a 230 kilovolt (kV) substation. From there, the solar energy generated by the Project would be transmitted via the new approximately 1.8-mile-long, 230 kV gen-tie line.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

21 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS