Ground Mount Solar and Battery Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
California State University, Bakersfield will implement a 4.55 megawatt direct current ground-mounted photovoltaic solar energy system across 15 acres of its main campus, complemented by an 11.7 megawatt-hour lithium-ion battery energy storage system. The solar installation will consist of approximately 6,500 panels mounted primarily on single-axis trackers, with a fixed-tilt array positioned along the western edge of the site facing south. The battery storage system will be housed in a prefabricated, fire-compliant enclosure on the eastern side of the property. Associated infrastructure includes inverters, an AC combiner, transformers, a control panel, and underground conduit connecting all components. A 21-kilovolt, 825-foot underground transmission line will link the system to an existing substation north of the site, integrating it with the PG&E grid. The project will feature perimeter fencing, access gates, and lighting for security. Construction is scheduled over an eight-month period from October 2026 to December 2027. Once operational, the system will run fully automated and unstaffed, with remote monitoring and management via a Supervisory Control and Data Acquisition system. Routine maintenance will include vegetation control, periodic panel washing, and electrical component inspections to ensure continued performance and safety.
General Info
Agency
NAICS
Place of Performance
Kroll Way and Residence Way, Bakersfield, CA, 93311Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description