Ground Mount Solar and Battery Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ground Mount Solar and Battery Project for California State University, Bakersfield involves the installation of a 4.55 MWdc ground-mounted photovoltaic solar energy system and an 11.7 MWh lithium-ion battery energy storage system (BESS) on 15 acres of the main campus. The solar array will consist of approximately 6,500 panels on 1,275 posts, utilizing tracker mount systems and south-facing fixed tilt systems. The BESS will be housed in a prefabricated enclosure with industry-standard fire ratings. Key electrical infrastructure includes inverters, transformers, an AC combiner, and a control panel, all connecting to the PG&E grid via an underground 21-kilovolt power line. The system is designed to produce 8.3 GWh annually, covering roughly 40 percent of the campus electricity needs, and will be managed remotely via a SCADA system. Construction is scheduled to take place over an eight-month period from October 2026 to December 2027. The project is subject to rigorous environmental and regulatory compliance, including CEQA requirements, SJVAPCD dust emission controls, and CalGEM regulations regarding well abandonment. Specialized personnel requirements include a qualified professional archaeologist and a paleontologist to monitor ground-disturbing activities. Additionally, contractors must provide Valley Fever awareness training and NIOSH-approved respiratory protection for employees in accordance with Cal/OSHA standards. The project will be automated and unstaffed once operational, requiring only periodic maintenance and vegetation management.

General Info

CSU Bakersfield to install 4.55 MW solar and 11.7 MWh battery storage, linked to PG&E grid via underground line.

Agency

California State University, Bakersfield

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Kroll Way and Residence Way, Bakersfield, CA, 93311

Set-Aside

NONE

Documents

(9)

CSUB Ground Mount Solar and Battery Project Initial Study/Mitigated Negative Declaration June 2026

PDFinitial-study-mnd

CSUB Ground Mount Solar Project Notice of Completion

PDFnotice-of-completion

CSUB Ground Mount Solar Noise and Vibration Calculations Appendix D

PDFsow

CSUB Solar and Battery CalEEMod Detailed Emissions Report

PDFcal-eemod-report

CSUB Ground Mount Solar Project Biological Resources Assessment

PDFbiological-resources-assessment

CalGEM Advisory Letter on Ground Mount Solar and Battery Project Well Abandonment

PDFspecial-notice

CSUB Ground Mount Solar Cultural and Paleontological Resources Memo

PDFcultural-resources-memo

CSUB Ground Mount Solar & Battery Project NOI

PDFspecial-notice

CSUB Ground Mount Solar and Battery Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University, Bakersfield
Contacts2 people available
OfficeN/A
Organization / Agency
California State University, Bakersfield
Office AddressN/A
Contacts
Aditi AryaEnergy and Sustainability Manager
Vicky RosenSenior Environmental Planner

Interested Companies (1)

Show more
Michael Baker International
Lakewood, Colorado

Full Description

Show more
The project involves the installation of a 4.55 megawatt direct current (MWdc) ground-mounted photovoltaic (PV) solar energy system and associated electrical components on 15 acres on the main campus. A battery energy storage system (BESS) with an energy capacity of 11.7 megawatt-hours (MWh) would also be installed as part of the proposed project. The solar panel modules installed primarily on tracker mount systems with solar panels installed along the western portion of the project site as a south-facing fixed tilt system. Approximately 6,500 solar panels would be installed on approximately 1,275 posts. The project would also install a lithium-ion BESS on the eastern portion of the project site. The BESS would come in a prefabricated enclosure unit and have a fire rating in compliance with industry standards. Electrical components that would be installed as part of the project include inverters, an AC combiner, transformers, and a control panel. Conduit would connect the solar energy system to the electrical components within the project site. The proposed project would also include security features, including perimeter fencing, access gates, and lighting. The solar energy system would connect to the existing substation north of the project site, which would tie into the PG&E grid system via an underground 21-kilovolt, 825 linear foot power line. Construction of the proposed project would occur over an eight-month period between October 2026 and December 2027. Once operational, the solar energy system would be controlled, monitored, managed, and analyzed remotely using a Supervisory Control and Data Acquisition (SCADA) system. Operation of the proposed project would be automated and unstaffed. Occasional vegetation management, periodic washing of the solar PV panels, and maintenance of the electrical components would be required to maintain safe operation and energy production.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

6 days ago

DEADLINE

in 13 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for the design, installation, and maintenance of commercial-scale solar photovoltaic systems at the Eagleville Campus to meet approximately 95 percent of the site's annual electricity needs. The project requires a firm to provide comprehensive Engineering, Procurement, and Construction services, including geotechnical surveys, structural assessments, permitting, and interconnection with PECO. The County is seeking a Power Purchase Agreement using FEOC-compliant equipment, with a preference for equipment meeting Build America Buy America requirements. Selected firms must coordinate with an existing professional engineering consultant and account for approximately 160,000 dollars in remaining grant funding. The contract will be awarded based on best value, emphasizing demonstrated experience with at least five similar projects and the employment of at least three NABCEP PVIP-Certified professionals. Proposals must be submitted via the Bonfire portal as separate technical and cost documents, accompanied by a W9 and completed certifications regarding business status and conflicts of interest. The project includes strict compliance with federal grant addendums, including nondiscrimination and audit provisions. Final acceptance requires the system to be fully commissioned with drone thermal imaging and the procurement of official permission to operate.
Montgomery County Pa

POSTED

11 days ago

DEADLINE

in 17 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, and decommission a solar generating facility at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility size between 1 and 6 MW AC, with a focus on maximizing feasible buildout up to 5 MW AC and the optional inclusion of battery energy storage systems. The Town aims to establish a long-term land lease or Power Purchase Agreement (PPA) for a period not to exceed 30 years to generate financial benefits, including annual lease payments, revenue sharing, and host community benefits. A suggested project start date is Spring 2027. Proposers must demonstrate significant technical expertise, including at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for 10 years and a track record of completing at least three similar projects. Submissions must include a conceptual site plan, a detailed project schedule, a financial structure, and a plan of services not exceeding 20 pages. Evaluation will be based on a combination of price, technical and management capacity, and specific criteria regarding landfill cap protection, timber resource management, and interconnection feasibility. Proposals are due by 12:00 PM EST on October 8, 2026. Selected developers will be responsible for all permitting, utility interconnection risks, and providing decommissioning financial security via an irrevocable letter of credit or surety bond.
TORTH - Town of Royalston - Town Hall

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS