Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Ground Mount Solar and Battery Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

California State University, Bakersfield will implement a 4.55 megawatt direct current ground-mounted photovoltaic solar energy system across 15 acres of its main campus, complemented by an 11.7 megawatt-hour lithium-ion battery energy storage system. The solar installation will consist of approximately 6,500 panels mounted primarily on single-axis trackers, with a fixed-tilt array positioned along the western edge of the site facing south. The battery storage system will be housed in a prefabricated, fire-compliant enclosure on the eastern side of the property. Associated infrastructure includes inverters, an AC combiner, transformers, a control panel, and underground conduit connecting all components. A 21-kilovolt, 825-foot underground transmission line will link the system to an existing substation north of the site, integrating it with the PG&E grid. The project will feature perimeter fencing, access gates, and lighting for security. Construction is scheduled over an eight-month period from October 2026 to December 2027. Once operational, the system will run fully automated and unstaffed, with remote monitoring and management via a Supervisory Control and Data Acquisition system. Routine maintenance will include vegetation control, periodic panel washing, and electrical component inspections to ensure continued performance and safety.

General Info

CSU Bakersfield to install 4.55 MW solar and 11.7 MWh battery storage, linked to PG&E grid via underground line.

Agency

California State University, Bakersfield

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Kroll Way and Residence Way, Bakersfield, CA, 93311

Set-Aside

NONE

Documents

(9)

CSUB Ground Mount Solar and Battery Project Initial Study/Mitigated Negative Declaration June 2026

PDFinitial-study-mnd

CSUB Ground Mount Solar Project Notice of Completion

PDFnotice-of-completion

CSUB Ground Mount Solar Noise and Vibration Calculations Appendix D

PDFsow

CSUB Solar and Battery CalEEMod Detailed Emissions Report

PDFcal-eemod-report

CSUB Ground Mount Solar Project Biological Resources Assessment

PDFbiological-resources-assessment

CalGEM Advisory Letter on Ground Mount Solar and Battery Project Well Abandonment

PDFspecial-notice

CSUB Ground Mount Solar Cultural and Paleontological Resources Memo

PDFcultural-resources-memo

CSUB Ground Mount Solar & Battery Project NOI

PDFspecial-notice

CSUB Ground Mount Solar and Battery Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University, Bakersfield
Contacts2 people available
OfficeN/A
Organization / Agency
California State University, Bakersfield
Office AddressN/A
Contacts
Aditi AryaEnergy and Sustainability Manager
Vicky RosenSenior Environmental Planner

Interested Companies (1)

Show more
Michael Baker International
Long Beach, CA

Full Description

Show more
The project involves the installation of a 4.55 megawatt direct current (MWdc) ground-mounted photovoltaic (PV) solar energy system and associated electrical components on 15 acres on the main campus. A battery energy storage system (BESS) with an energy capacity of 11.7 megawatt-hours (MWh) would also be installed as part of the proposed project. The solar panel modules installed primarily on tracker mount systems with solar panels installed along the western portion of the project site as a south-facing fixed tilt system. Approximately 6,500 solar panels would be installed on approximately 1,275 posts. The project would also install a lithium-ion BESS on the eastern portion of the project site. The BESS would come in a prefabricated enclosure unit and have a fire rating in compliance with industry standards. Electrical components that would be installed as part of the project include inverters, an AC combiner, transformers, and a control panel. Conduit would connect the solar energy system to the electrical components within the project site. The proposed project would also include security features, including perimeter fencing, access gates, and lighting. The solar energy system would connect to the existing substation north of the project site, which would tie into the PG&E grid system via an underground 21-kilovolt, 825 linear foot power line. Construction of the proposed project would occur over an eight-month period between October 2026 and December 2027. Once operational, the solar energy system would be controlled, monitored, managed, and analyzed remotely using a Supervisory Control and Data Acquisition (SCADA) system. Operation of the proposed project would be automated and unstaffed. Occasional vegetation management, periodic washing of the solar PV panels, and maintenance of the electrical components would be required to maintain safe operation and energy production.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
SOLAR PHOTOVOLTAIC SYSTEM DEVELOPMENT AND POWER PURCHASE AGREEMENT
Solicitation # BD-27-1355-PRC-YPRC-131972
The Town of Yarmouth is inviting qualified proposers to submit bids for the lease of a parcel of municipal property at 74 Town Brook Road in West Yarmouth, Massachusetts, to develop, install, operate, and maintain a solar photovoltaic system. The selected proposer will also enter into a Power Purchase Agreement with the Town to sell the generated electricity, ensuring a long-term, sustainable energy supply. The project aligns with the Town’s goals for renewable energy adoption and cost efficiency, with all development and operational responsibilities falling to the proposer, who must meet the technical and financial criteria outlined in the solicitation. Proposals must demonstrate proven experience in solar project development, financial viability, and compliance with local and state regulations. Bids are due by September 10, 2026, and must be submitted in response to solicitation number BD-27-1355-PRC-YPRC-131972, which was posted on August 4, 2026. The process is managed by the Massachusetts Procurement division under the agency name PRC - PROCUREMENT, with Svetlana Salemme serving as the primary point of contact. The property is located in Barnstable County, within the 02673 ZIP code, and performance is expected to occur entirely on site. While no specific set-aside or NAICS code is designated, the solicitation is open to all qualified entities and emphasizes technical expertise, project scalability, and adherence to the Town’s energy objectives. Interested parties are encouraged to review the details via the provided Commbuys link.
PRC - PROCUREMENT

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
New
SLED
Orleans Solar-Storage ProjectAdapture Renewables, Inc. through its affiliate Orleans Energy Center, LLC is proposing the Orleans Solar-Storage Project on approximately 160 acres of privately owned land in unincorporated western Fresno County, California. The project includes a 25-megawatt alternating current photovoltaic solar energy facility coupled with a 25-megawatt alternating current battery energy storage system capable of storing up to 200 megawatt-hours of electricity, providing up to eight hours of discharge capacity. The development will feature an onsite electrical substation, internal wiring and collection infrastructure, and a new 1-mile, 70-kilovolt generation-tie line to connect to the existing Pacific Gas and Electric Company Giffen Substation. The project aims to enhance grid reliability and support renewable energy goals in the region by integrating solar generation with scalable storage. All development activities are subject to regional planning and environmental review processes overseen by Fresno County. The primary point of contact for the project is Arianna Brown, Planner at Fresno County, reachable at 559-600-4245 or arbrown@fresnocountyca.gov. Additional contacts include Sarah Spann, Principal Environmental Planner at Stantec, and Chrissy Gaglione, Development Manager at Adapture Renewables. The project has been posted under a forecast notice with a public record identifier of 2026080074 and is anticipated to proceed through environmental assessments and permitting phases in the coming years. The location of performance is designated as Fresno, California, with the zip code 93608, indicating the general area of impact. No formal solicitation number or set-aside classification has been assigned, as this is a private development proposal requiring local regulatory approval rather than a competitive government procurement.
Fresno County

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Galaxy Solar PV and Storage Project by Galaxy Solar Storage, LLC (Terra-Gen)
Solicitation # PP25404
The Galaxy Solar PV and Storage Project is a large-scale renewable energy initiative led by Galaxy Solar Storage, LLC (Terra-Gen) to develop a 600-megawatt photovoltaic solar facility with up to 4 gigawatt-hours of energy storage capacity on approximately 3,519 acres in southeastern Kern County, California. The project spans 184 privately owned parcels across unincorporated land near Mojave and California City, adjacent to State Route 58, and requires extensive land use modifications including zone changes from A-1 (Limited Agriculture) to A (Exclusive Agriculture) across multiple maps, conditional use permits for solar operations and temporary construction areas, general plan amendments to remove road reservations and reclassify land use designations, and zone variances to accommodate substandard parcel sizes. The project includes the installation of solar panels, inverters, medium-voltage collection lines, transformers, a 230-kV switchyard, an operations and maintenance facility, telecommunications infrastructure, and offsite water storage tanks. A generation-tie line will connect the facility to the existing Windhub Substation, enabling delivery of renewable power to the grid. To facilitate development, multiple vesting tentative parcel maps propose the merger and re-subdivision of 118 parcels into six consolidated parcels totaling over 1,300 acres. Offsite infrastructure requires additional zoning changes and conditional use permits for an off-site switchyard and temporary staging areas. All activities are subject to compliance with Kern County zoning ordinances and environmental review under the California Environmental Quality Act, with public input gathered during a review period ending October 6, 2025. The project aligns with state mandates to achieve 100% carbon-free electricity by 2045 and relies on native revegetation, topsoil restoration, and de-compaction techniques to minimize ecological disruption. No federal contract clauses, pricing data, payment terms, or procurement evaluation criteria are included in the documentation, indicating this is a land use and environmental permitting process rather than a federal acquisition. The primary point of contact is Mark Tolentino of Kern County Planning and Natural Resources Department, with Simon Day of Terra-Gen serving as the developer’s representative.
Kern County

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 221114
International
ELJ2026-SolarSystems: Procurement of Solar Systems
Solicitation # ELJ2026-SolarSystems
e-Learning Jamaica Company Limited, an agency of the Ministry of Education, Skills, Youth and Information, is seeking qualified suppliers to bid for the supply, installation, maintenance, and warranty support of solar system kits across multiple lots, with bidders permitted to submit proposals for up to two lots. Participation is strictly limited to those registered on the Government of Jamaica Electronic Procurement Portal, and all tender documents, clarifications, and submissions must be completed online via www.gojep.gov.jm; no hard copies or physical submissions will be accepted. To be deemed eligible, bidders must provide a valid Tax Compliance Certificate, proof of current registration with the Public Procurement Commission or National Commercial Council in the Electrical Appliance and Equipment category, and a bid security of JMD $200,000. Tender documents became available for download on July 22, 2026, with a final deadline for clarification requests on August 24, 2026, at 11:00 a.m., and all bids must be submitted by August 31, 2026, at 11:00 a.m. local time, followed by an online bid opening at 11:15 a.m. on the same day. The awarding authority reserves the right to reject any or all bids, including the lowest-priced submission, and may terminate the procurement process at any time prior to contract award without incurring liability to participants.
e-Learning Jamaica Limited

POSTED

17 days ago

DEADLINE

in 23 days
View Details
NAICS: 221114
Federal
Preventive Maintenance Services for Photovoltaic Systems
Solicitation # PR15733540
The United States Consulate General in Hyderabad, India, is soliciting professional services to perform preventive maintenance on its photovoltaic systems under solicitation number PR15733540, with responses due by August 26, 2026. The contract, classified under NAICS code 221114 for Solar Electric Power Generation, is a commercial item acquisition governed by FAR 52.212-1 and 52.212-4, with a firm-fixed-price structure expected. The base performance period is one year, with four one-year option periods available, allowing for a potential five-year contract duration. Work involves semi-annual maintenance tasks including cleaning and inspecting DC disconnects, inverter servicing, cable polarity verification, and system performance evaluations, all aligned with IEC 62446-1:2016 standards and manufacturer guidelines. Deliverables require completion of maintenance checklists, submission of performance test results within 30 days, and ensuring no more than one customer complaint per month. Contractors must provide an operational strategic plan, evidence of qualified personnel and equipment, a plan to secure necessary licenses, and a list of clients from the past five years. Key personnel must be fluent in English, sign off on all tasks, and submit reports to the COR within five business days. All offerors must be registered in SAM, hold valid GST certification if based in India, maintain minimum liability insurance of INR 1 million, comply with Indian labor laws, and adhere to prohibitions on the use of ByteDance-covered applications such as TikTok. No formal security clearances are mandated, but physical access to the consulate requires compliance with on-site identification and conduct protocols. Contractors must avoid any misrepresentation of government affiliation and cannot use Department of State logos. Subcontractor sales restrictions, whistleblower protections, labor standards, and anti-trafficking clauses are incorporated, with electronic funds transfer required for payments submitted via email to MissionIndiaPayments@state.gov. Performance will be evaluated based on past performance, offeror responsibility including financial health and technical capability, and pricing, with award determined through a best-value trade-off process rather than lowest price technically acceptable. No packaging or marking requirements beyond electrical warning labels are specified, and no FOB terms or Incoterms are defined in the solicitation.
American Consulate Hyderabad

POSTED

18 days ago

DEADLINE

in 18 days
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPA
Solicitation # 0000039798
The California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

24 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

24 days ago

DEADLINE

N/A
View Details