Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

SLV-CB Office Solar Expansion

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SLV-CB Office Solar Expansion contract is a forecast opportunity issued by the U.S. Bureau of Reclamation under the Department of the Interior, identified by solicitation number AGBOR700254 and posted on January 6, 2026. The project focuses on expanding solar capabilities for the SLV-CB Office and is designated as a small business set-aside, aligning with NAICS code 221114, which pertains to solar electric power generation. The solicitation encourages participation from eligible small business entities to support the agency's renewable energy initiatives. Key contact for this contract is Renee Parra, who serves both as the primary point of contact and the small business specialist, reachable via email. While specific location details for the place of performance are not provided, interested parties can find further information and track updates through the official acquisition gateway link provided. This opportunity reflects the government’s ongoing commitment to sustainable energy solutions within its infrastructure projects.

General Info

U.S. Bureau of Reclamation seeks small business for SLV-CB Office solar expansion project.

Agency

Department of the Interior → U.S. Bureau of Reclamation

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

NM, US

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior → U.S. Bureau of Reclamation
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior → U.S. Bureau of Reclamation
Office AddressN/A
Contacts

Full Description

Show more
SLV-CB Office Solar Expansion

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System ComplexThe Rosemary Solar and Energy Storage System Complex is a 140-megawatt photovoltaic solar project with integrated battery energy storage, to be constructed on approximately 1,212 acres of agricultural land in unincorporated Fresno County, California, located west of State Route 145, about 25 miles southwest of Fresno, six miles east of Cantua Creek, and five miles south of San Joaquin, on the south side of Kamm Avenue between South El Dorado Avenue and South Yuba Avenue. The project includes three interconnected solar generation sites, an on-site substation, and a 2-mile transmission line connecting to the Pacific Gas and Electric Crescent Substation, alongside a five-mile upgrade of existing PG&E transmission lines. The facility will operate under a 30-year lifespan, with a comprehensive decommissioning plan required at project end. Construction is projected to take 18 months with concurrent development, operating six days per week, with work hours from 6:00 a.m. to 9:00 p.m. on weekdays and 7:00 a.m. to 5:00 p.m. on weekends. Key environmental compliance is governed by the California Environmental Quality Act, with oversight from Fresno County as the lead agency and coordination with multiple state and federal bodies including the State Water Resources Control Board, California Department of Fish and Wildlife, San Joaquin Valley Air Pollution Control District, and the California Public Utilities Commission. Technical and operational requirements are defined by multiple regulatory standards, including NERC FAC-003 for vegetation management, UL 9540A and NFPA 855 for battery fire safety, and OSHA regulations under 29 CFR. Emergency Action Plans must be developed in consultation with local fire agencies and comply with California Senate Bill 38, with annual refresher training for first responders mandated. Special constraints include motion-activated lighting to protect nocturnal species, a ban on plastic monofilament erosion control materials, and mandatory wildlife surveys before burial or reuse of storage pipes. Design must adhere to Avian Power Line Interaction Committee guidance to minimize bird collisions. Security, safety, and reporting protocols require immediate notification of special-status species sightings, 24-hour reporting of hazardous material spills, and onsite presence of a qualified biologist during vegetation clearing and grading activities. Inspections occur along the transmission corridor from the Helm Substation to the Crescent Switching Station, with formal acceptance governed by CPUC standards. Oversight responsibilities are
Fresno County

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
General Plan UpdateThe California Department of Fish and Wildlife issued an Incidental Take Permit authorizing the construction of a single-family home on one acre of vacant land in Los Angeles County, California, which will result in the incidental take of 21 western Joshua trees protected under the Western Joshua Tree Conservation Act and the California Endangered Species Act. Project activities include clearing vegetation, grading, trenching for utilities and septic systems, and establishing a concrete washout and staging area, all subject to strict environmental conditions designed to minimize harm to protected habitat. Mitigation is required through payment of a $509 fee per standard-sized tree, with additional fees triggered if new trees are discovered during construction, and the permittee must implement buffer zones, fencing, spill prevention measures, and worker training. Compliance is enforced through on-site monitoring by a designated biologist, daily inspection records, and mandatory submission of a Project Completion Report within one month of work completion, which must include photographic evidence, GPS data, and an accounting of all trees affected. The permittee is required to report any unauthorized take or non-compliance immediately by phone and in writing within 24 to 48 hours, and must maintain open access for CDFW inspections throughout the project. All submissions, including notifications and reports, must be sent electronically or in hard copy to CDFW, with no federal procurement infrastructure such as UEI, CAGE, or electronic invoicing systems involved, as this is a state environmental permit under the Fish and Game Code, not a federal contract. The lead agency for environmental review is Los Angeles County, with CDFW serving as the permitting authority, and financial obligations are directed to the Western Joshua Tree Conservation Fund via check or money order with the permit number clearly indicated.
Los Angeles County

POSTED

3 days ago

DEADLINE

in almost 3 years
View Details
NAICS: 221114
New
Federal
Renewable Energy Certificates (RECs)The National Oceanic and Atmospheric Administration (NOAA), through its Office of Chief Administrative Officer and Safety and Environmental Compliance Office, is procuring 10,409 megawatt-hours of Renewable Energy Certificates (RECs) to comply with federal sustainability mandates under Section 203 of the Energy Policy Act of 2005 and Executive Order 14148. These RECs must be Green-e certified or equivalent, generated from eligible U.S.-based renewable sources such as wind and solar, and originate from facilities placed into service on or after January 1, 2011, ensuring compliance with the 15-year vintage rule. The certificates must be retired in one of the approved U.S. tracking systems—WREGIS, M-RETS, NEPOOL-GIS, GATS, or NAR—and accompanied by a signed attestation confirming exclusive ownership and the absence of double-counting. Delivery of the RECs and all supporting documentation, including facility-level details and NERC region information, is required no later than December 15, 2026, with acceptance occurring at NOAA’s facility in Silver Spring, Maryland. This procurement is conducted as a combined synopsis/solicitation under FAR Part 12 for commercial products and services, issued as a Full Small Business Set-Aside under NAICS codes 221114 and 221115, with a 500-employee size standard. The award will be made on a Lowest Price Technically Acceptable (LPTA) basis, where technical acceptability is evaluated on a pass/fail basis based on adherence to certification, vintage, origin, and tracking system requirements, followed by price comparison among compliant offers. The contract is firm-fixed-price, with FOB Destination terms applying, meaning title and risk transfer upon delivery to the specified location. All proposals must be submitted electronically to the designated point of contact by July 31, 2026, and must include a current SAM registration, UEI and CAGE codes, and required certifications including anti-kickback provisions, whistleblower rights, and compliance with security and trafficking prohibitions. Invoicing is mandated exclusively through the Treasury’s Invoice Processing Platform, and contractors must adhere to NOAA-specific requirements including security processing (NACI or SAC based on contract duration), organizational conflict of interest disclosures, and compliance with NOAA’s sexual harassment prevention policies. No packaging, marking, or preservation specifications are provided, and no formal
Department Of Commerce Noaa

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 221114
New
International
ELJ2026-SolarSystems: Procurement of Solar Systemse-Learning Jamaica Company Limited, an agency of the Ministry of Education, Skills, Youth and Information, is seeking qualified suppliers to bid for the supply, installation, maintenance, and warranty support of solar system kits across multiple lots, with bidders permitted to submit proposals for up to two lots. Participation is strictly limited to those registered on the Government of Jamaica Electronic Procurement Portal, and all tender documents, clarifications, and submissions must be completed online via www.gojep.gov.jm; no hard copies or physical submissions will be accepted. To be deemed eligible, bidders must provide a valid Tax Compliance Certificate, proof of current registration with the Public Procurement Commission or National Commercial Council in the Electrical Appliance and Equipment category, and a bid security of JMD $200,000. Tender documents became available for download on July 22, 2026, with a final deadline for clarification requests on August 24, 2026, at 11:00 a.m., and all bids must be submitted by August 31, 2026, at 11:00 a.m. local time, followed by an online bid opening at 11:15 a.m. on the same day. The awarding authority reserves the right to reject any or all bids, including the lowest-priced submission, and may terminate the procurement process at any time prior to contract award without incurring liability to participants.
e-Learning Jamaica Limited

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPAThe California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

11 days ago

DEADLINE

in about 2 months
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

12 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
WSU Wenatchee Sunrise Orchard Solar ArrayThe Board of Regents of Washington State University is soliciting sealed bids for the construction of a 0.5-acre solar array at the Sunrise Research Orchard located at 75 Sunrise Court, Rock Island, WA 98850. The project requires full construction including excavation and foundation placement for the racking system, installation of solar panels according to approved drawings, and extension of electrical lines from the existing transformer to the new array. The system is designed to generate electricity for on-site use or to feed surplus power back into the PUD grid, supporting research objectives. Substantial Completion must be achieved within 250 days of the Notice to Proceed, and all bids must be structured around this timeline. The estimated project cost ranges between $1,000,000 and $1,200,000, with a single optional alternate to install an additional solar array over an existing orchard area on site. Bids are due by 2:00 p.m. on August 6, 2026, followed by a virtual bid opening at 2:30 p.m. the same day. A non-mandatory virtual pre-bid meeting is scheduled for July 22, 2026, at 10:00 a.m. via Zoom, and a non-mandatory site walk will occur on July 27, 2026, at 11:30 a.m. The solicitation number is 2371-2025, posted on July 11, 2026, and all proposals must be submitted through the designated public purchase portal. Primary point of contact for inquiries is Craig Cole, reachable at (509) 335-9035 or craig.cole@wsu.edu. This procurement is categorized as a state-level education solicitation under Washington State University’s authority.
Washington State University

POSTED

15 days ago

DEADLINE

in 11 days
View Details